Information injection-pump assembly
BOSCH
9 400 619 691
9400619691
ZEXEL
106671-5081
1066715081

Rating:
Service parts 106671-5081 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
1660096573
12.
Open Pre:MPa(Kqf/cm2)
17.7{180}/22.6{230}.
15.
NOZZLE SET
Include in #1:
106671-5081
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 619 691
9400619691
ZEXEL
106671-5081
1066715081
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-4-2-6-
3-5
Pre-stroke
mm
3.9
3.85
3.95
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-4 deg. 60 59.5 60.5
Cal 1-4 deg. 60 59.5 60.5
Difference between angles 2
Cyl.1-2 deg. 120 119.5 120.5
Cyl.1-2 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cal 1-3 deg. 240 239.5 240.5
Cal 1-3 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-5 deg. 300 299.5 300.5
Cal 1-5 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
10.3
Pump speed
r/min
600
600
600
Average injection quantity
mm3/st.
163.2
161.2
165.2
Max. variation between cylinders
%
0
-4
4
Basic
*
Fixing the lever
*
Boost pressure
kPa
36
36
Boost pressure
mmHg
270
270
Injection quantity adjustment_02
Adjusting point
-
Rack position
5.7+-0.5
Pump speed
r/min
275
275
275
Average injection quantity
mm3/st.
16
15
17
Max. variation between cylinders
%
0
-10
10
Fixing the rack
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
D
Rack position
9.05
Pump speed
r/min
300
300
300
Average injection quantity
mm3/st.
129.1
125.1
133.1
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Boost compensator adjustment
Pump speed
r/min
300
300
300
Rack position
9.05
Boost pressure
kPa
3.3
3.3
5.3
Boost pressure
mmHg
25
25
40
Boost compensator adjustment_02
Pump speed
r/min
300
300
300
Rack position
10.65
Boost pressure
kPa
22.7
16
29.4
Boost pressure
mmHg
170
120
220
Timer adjustment
Pump speed
r/min
1000--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
950
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
1050
Advance angle
deg.
1.5
1
2
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Lever ratio: RT
(2)Target shim dimension: TH
(3)Tolerance for racks not indicated: +-0.05mm.
(4)Variable speed specification.
(5)Boost compensator stroke
(6)Rack limit using stop lever
(7)Set idle sub-spring (with the lever free).
(8)Damper spring setting
(9)Perform governor adjustment at an ambient temperature of at least 15 deg C (boost compensator start spring is shape memory alloy).
----------
RT=1 TH=2.4mm
----------
----------
RT=1 TH=2.4mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=21deg+-5deg b=16deg+-5deg
----------
----------
a=21deg+-5deg b=16deg+-5deg
0000000901

F:Full load
(1)Fix the lever.
----------
----------
a=24deg+-5deg
----------
----------
a=24deg+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
(1)Rack position = aa
(2)Use the hole at R = bb
----------
aa=10.65mm bb=25mm
----------
a=11deg+-5deg b=30.5deg+-5deg
----------
aa=10.65mm bb=25mm
----------
a=11deg+-5deg b=30.5deg+-5deg
0000001501 RACK SENSOR

(VR) measurement voltage
(I) Part number of the control unit
(G) Apply red paint.
(H): End surface of the pump
1. Rack sensor adjustment (-0620)
(1)Fix the speed control lever at the full position
(2)Set the speed to N1 r/min.
(If the boost compensator is provided, apply boost pressure.)
(3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01.
(4)At that time, rack position must be Ra.
(5)Apply G at two places.
Connecting part between the joint (B) and the nut (F)
Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=600r/min Ra=10.3mm
----------
----------
N1=600r/min Ra=10.3mm
----------
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)Secondary timing stamping position for the No. 1 cylinder's beginning of injection
(5)Pump vertical direction
(6)Direction of rotation
(7)Pointer
(8)Timing device stamping
(9)Pointer stamping
(10)Timing device
(11)Move b deg and stamp both at the same time as shown above.
(12)Outside circumference of timing device
----------
----------
a=(30deg) b=1deg30min
----------
----------
a=(30deg) b=1deg30min
Information:
1. Remove oil filter element (1). 2. Remove two bolts (4).3. Remove four bolts (3).4. Remove six bolts (2). Remove oil filter base, gaskets and O-rings. The following steps are for the installation of the oil filter and oil filter base. Position gaskets and install all bolts finger tight before tightening to the standard torque.5. Be sure the O-rings are in place on oil filter base. Position gaskets and oil filter base. Install six bolts (2).6. Install four bolts (3).7. Position gasket. Install two bolts (4). Tighten all the bolts to standard torque.8. Install oil filter element (1).Disassemble & Assemble Oil Filter Base
Start By:a. remove oil filter base 1. Remove the O-rings. Remove bolt (1). 2. Remove relief valve group (2). 3. Remove four bolts and remove covers (3). Remove oil cooler by-pass valve (5), oil cooler by-pass valve spring (4) and spool (6). 4. Remove plug (7). Remove oil filter by-pass valve (8). The following steps are for the assembly of the oil filter base.5. Install by-pass valve (8) and plug (7).6. Install oil cooler by-pass valve (5), oil pump by-pass valve (6) and spring (4). Position covers (3). Install four bolts.7. Position relief valve group (2). Install bolt (1). Install O-ring seals.End By:a. install oil filter base
Start By:a. remove oil filter base 1. Remove the O-rings. Remove bolt (1). 2. Remove relief valve group (2). 3. Remove four bolts and remove covers (3). Remove oil cooler by-pass valve (5), oil cooler by-pass valve spring (4) and spool (6). 4. Remove plug (7). Remove oil filter by-pass valve (8). The following steps are for the assembly of the oil filter base.5. Install by-pass valve (8) and plug (7).6. Install oil cooler by-pass valve (5), oil pump by-pass valve (6) and spring (4). Position covers (3). Install four bolts.7. Position relief valve group (2). Install bolt (1). Install O-ring seals.End By:a. install oil filter base