106671-4780 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066714780 3626540160


 

Information injection-pump assembly

ZEXEL 106671-4780 1066714780
MITSUBISHI-HEAV 3626540160 3626540160
106671-4780 INJECTION-PUMP ASSEMBLY
Rating:
52
Buy INJECTION-PUMP ASSEMBLY 106671-4780 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-4780 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106060-7951
3. GOVERNOR 105447-0910
4. SUPPLY PUMP 105217-1331
5. AUTOM. ADVANCE MECHANIS 105636-1920
6. COUPLING PLATE 105662-0710
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-5481
11. Nozzle and Holder 36261-33010
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105030-4051
14. NOZZLE 105015-7160
15. NOZZLE SET

Include in #1:

106671-4780 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106671-4780 1066714780
MITSUBISHI-HEAV 3626540160 3626540160


Zexel num
Bosch num
Firm num
Name
106671-4780 
106671-4781 
 
3626540160  MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
S6B * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.7 3.65 3.75
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.6
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   278.2 271.2 285.2
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   4.6+-0.5
Pump speed r/min   425 425 425
Average injection quantity mm3/st.   20.6 18.1 23.1
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   243 243 253
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   (450--)
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   400
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   500
Advance angle deg.   0.9
Timer adjustment_04
Pump speed r/min   550
Advance angle deg.   1 0.5 1.5
Timer adjustment_05
Pump speed r/min   -
Advance angle deg.   4 3.5 4.5
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 106671-4780
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK LIMIT (3)Rack difference between N = N1 and N = N2 (4)Idle sub spring setting: L1.
----------
K=18 N1=600r/min N2=550r/min L1=4.7-0.5mm
----------

Speed control lever angle

Test data 106671-4780
F:Full speed S:Stop
----------

----------
a=(19deg)+-5deg b=32deg+-3deg

0000000901

Test data 106671-4780
F:Full load I:Idle S:Stop (1)Use the hole at R = aa (2)Actual measurement
----------
aa=25mm
----------
a=(26deg)+-5deg b=53deg+-5deg

Timing setting

Test data 106671-4780
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(100deg)




Information:

1. Remove wiring harnesses from bracket (1). 2. Disconnect the wires at connections (5) Remove line (4). Remove five bolts (2), bracket (1) cover (3) and the gasket. 3. Remove two bolts (6) and clamps. Remove rack solenoid. (7) 4. Disconnect wires at connections (8). Remove two bolts (10) and bracket assembly (9). Loosen the locknut and remove rack position sensor (11). Be careful not to lose the spring that is around the sensor. To remove the transducer module at this time use the following procedure.a. disconnect wires at connector (8)b. remove the connector from the wiresc. remove four bolts that fasten transducer module (22) to housing (15)d. feed the wires through housing (18) while removing the transducer module. 5. Remove three bolts (12) from inside housing (14). Remove two bolts (13) and remove housing (14). 6. Loosen locknut (15) and remove engine speed sensor (16). 7. Remove seven bolts (17) and remove the transducer module and housing (18). 8. Remove three bolts (19) and cover (20). 9. Remove two bolts (21). Remove transducer module (22) and gasket. 10. Remove lockring (27), seat (25), spring (24), sleeve (23) and lockring (26). 11. Remove three bolts (28) and remove cylinder (29). 12. Remove sleeve (30), piston (31) and valve (32). Remove O-ring seal (33) from sleeve (30). 13. Remove bolts (34) and remove retainer (35). Remove two races and one bearing (not shown).Assemble Rack Actuator Package
1. Lubricate bearing (37) with engine oil. Install race (36), bearing (37), race (36) and retainer (35) on the fuel injection pump camshaft. 2. Lubricate O-ring seal (33) with engine oil and install on sleeve (30). Install sleeve (32) and piston (31) into sleeve (33). 3. Install sleeve (30) into cylinder (29).4. Install lockring (26), sleeve (23), spring (24), seat (25) and lockring (27) on valve (32). 5. Put cylinder assembly (29) in position on the fuel injection pump housing with piston (31) engaged over fuel injection pump rack (38). Be sure that rack (38) is properly engaged with piston (31). 6. Fasten cylinder (29) to the fuel injection pump housing with three bolts (28). The rack and servo valve (32) must move freely after bolts (28) are tight. 7. Install gasket (39) and transducer module (22) on housing (18). 8. Place wire harness (40) in the slot of the housing. 9. Install cover (20) and bolts (19). 10. Install the gasket and housing (18) on the fuel injection pump housing with seven bolts (17). 11. Install engine speed sensor (16) until it contacts retainer (35). Back the engine speed sensor out (counterclockwise) 180°. This procedure will provide a clearance of .76 mm (.030 in). Tighten locknut (15) to a torque of 13 2 N m (10 1 lb.ft.). 12. Install gasket and housing (14).13. Install the rack position sensor damping seal in housing (14). Install the spring and rack position sensor (11) in housing (14). 14. Connect the rack position sensor wiring connector to the transducer module wiring connector (P8 to

Have questions with 106671-4780?





Group cross 106671-4780 ZEXEL

Mitsubishi-Heav 

106671-4780  

106671-4781 
 
3626540160 
INJECTION-PUMP ASSEMBLY
S6B
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi-Heav 

 
3626550160 
INJECTION-PUMP ASSEMBLY
S6B
 
3626560160 
INJECTION-PUMP ASSEMBLY
S6B
 
3626570160 
INJECTION-PUMP ASSEMBLY
S6B
9 400 616 828 
3626580160 
INJECTION-PUMP ASSEMBLY
S6B
Back to top