106671-4650 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066714650 75l47010a


 

Information injection-pump assembly

ZEXEL 106671-4650 1066714650
NIIGATA-URAWA 75L47010A 75l47010a
106671-4650 INJECTION-PUMP ASSEMBLY
Rating:
14
Buy INJECTION-PUMP ASSEMBLY 106671-4650 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-4650 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106060-7160
3. GOVERNOR 105487-4870
4. SUPPLY PUMP 105237-1930
5. AUTOM. ADVANCE MECHANIS 105635-0150
6. COUPLING PLATE 105663-0340
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2)
13. NOZZLE-HOLDER
14. NOZZLE
15. NOZZLE SET

Include in #1:

106671-4650 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106671-4650 1066714650
NIIGATA-URAWA 75L47010A 75l47010a


Zexel num
Bosch num
Firm num
Name
106671-4650 
106671-4651 
 
75L47010A  NIIGATA-URAWA
INJECTION-PUMP ASSEMBLY
DMF13HZ * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.05 3 3.1
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   12.8
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   217 212 222
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   R2(5.8)
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   14 12.5 15.5
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Timer adjustment
Pump speed r/min   350
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   600
Advance angle deg.   1.6 1.1 2.1
Timer adjustment_03
Pump speed r/min   800
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106671-4650
N:Pump speed R:Rack position (mm) (1)Tolerance for racks not indicated: +-0.05mm. (2)Rack limit using stop lever (3)Damper spring setting: DL (4)Injection quantity = Q
----------
DL=R3-0.2mm Q=18+-1.5mm3/st
----------

Speed control lever angle

Test data 106671-4650
F:Full speed
----------

----------
a=(2deg)+-5deg

0000000901

Test data 106671-4650
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=20deg+-5deg b=(42.5deg)+-3deg

Stop lever angle

Test data 106671-4650
N:Pump normal S:Stop the pump. (1)Drive side (2)Use the hole at R = aa (3)Rack position bb
----------
aa=50mm bb=13.8+-0.1mm
----------
a=34deg+-5deg b=36deg+-5deg

Timing setting

Test data 106671-4650
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(7deg)




Information:

You must read and understand the warnings and instructions contained in the Safety section of this manual, before performing any operation or maintenance procedures.Cooling System
Do not perform this maintenance until you read and understand the material in the Safety and Cooling System Specifications sections of this publication.
Drain/Flush/Replace Coolant (Long Life Coolant/Antifreeze Only)
Caterpillar Long Life Coolant/Antifreeze should be replaced every 6,000 Service Hours or 4 Years, whichever comes first. Only clean water is needed to clean and flush the cooling system when LLCA is drained and replaced.Drain
1. Stop the engine and allow the engine to cool. Loosen the coolant filler cap slowly to relieve any pressure, and remove the cap.2. Remove the radiator drain plug, or open the radiator drain valve (if equipped). Remove the block and oil cooler drain plugs. Remove the drain plug from the bottom of the water pump housing. Allow the coolant to drain.
Dispose of used engine coolant properly or recycle. Various methods have been proposed to reclaim used coolant for reuse in engine cooling systems. The full distillation procedure is the only method acceptable by Caterpillar to reclaim the used coolant. Contact your Caterpillar for information regarding disposal and recycling of used coolant.
For information regarding disposal and recycling of used coolant:Contact Caterpillar Service Technology Group:Outside Illinois: 1-800-542-TOOLInside Illinois: 1-800-541-TOOLCanada: 1-800-523-TOOLFlush
3. Flush the cooling system with clean water to remove any debris.4. Clean and install all drain plugs and/or close the drain valve(s).5. Fill the cooling system with clean water. Install the filler cap. Operate the engine until warm 49 to 66°C (150 to 120°F).6. Stop the engine and allow the engine to cool. Loosen the coolant filler cap slowly to relieve any pressure, and remove the cap. Remove the cooling system drain plug(s) or open the drain valve. Allow the water to drain. Flush the cooling system with clean water.7. Repeat steps 6 and 7.Fill
8. Fill the cooling system with LLCA. Refer to the refill capacities chart in this manual for the amount of LLCA needed to refill your system.9. Start and run the engine with the filler cap removed. Allow the LLCA to warm, the thermostat to open, and the coolant level to stabilize. Add LLCA if necessary to bring the coolant to the proper level.10. Check the condition of the filler cap gasket. If the gasket is damaged, discard the old filler cap and install a new filler cap. If the gasket is not damaged, use a 9S8140 Service Tool (available from your Caterpillar dealer) to pressure test the filler cap. The correct filler cap pressure is stamped on the face of the filler cap. If the filler cap does not hold the correct pressure, install a new filler cap.11. Start the engine and inspect for coolant leaks and proper operating temperature.

Have questions with 106671-4650?





Group cross 106671-4650 ZEXEL

Niigata-Urawa 

106671-4650  

106671-4651 
 
75L47010A 
INJECTION-PUMP ASSEMBLY
DMF13HZ
 
75L47010B 
INJECTION-PUMP ASSEMBLY
DMF13HZ
 
75L47010C 
INJECTION-PUMP ASSEMBLY
DMF13HZ
 
 
INJECTION-PUMP ASSEMBLY

Niigata-Urawa 

 
75L47010F 
INJECTION-PUMP ASSEMBLY
DMF13HZ
 
75L47011A 
INJECTION-PUMP ASSEMBLY
DMF13HZ
9 400 616 821 
75L47010G 
INJECTION-PUMP ASSEMBLY
DMF13HZ
Back to top