106671-3841 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066713841 220004591a


 

Information injection-pump assembly

ZEXEL 106671-3841 1066713841
HINO 220004591A 220004591a
106671-3841 INJECTION-PUMP ASSEMBLY
Rating:
16
Buy INJECTION-PUMP ASSEMBLY 106671-3841 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-3841 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106060-5490
3. GOVERNOR 105488-9771
4. SUPPLY PUMP 105207-1220
5. AUTOM. ADVANCE MECHANIS 105681-5011
6. COUPLING PLATE 105662-0790
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7050
11. Nozzle and Holder 23600-1621
12. Open Pre:MPa(Kqf/cm2) 14.7{150}/21.6{220}
13. NOZZLE-HOLDER 105031-7150
14. NOZZLE 105015-5550
15. NOZZLE SET

Include in #1:

106671-3841 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106671-3841 1066713841
HINO 220004591A 220004591a


Zexel num
Bosch num
Firm num
Name
106671-3841 
106671-8030 
 
220004591A  HINO
INJECTION-PUMP ASSEMBLY
EK200 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-0920
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   4.8 4.74 4.8
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   A
Rack position   7.9
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   153 150 156
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   7.9
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   151 149 153
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   8.3
Pump speed r/min   1075 1075 1075
Average injection quantity mm3/st.   159 156 162
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   D
Rack position   4+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   13 10 16
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   8.6+-0.5
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   140 140 150
Fixing the lever   *
Rack limit   *
Injection quantity adjustment_06
Adjusting point   F
Rack position   7.2
Pump speed r/min   1150 1150 1150
Average injection quantity mm3/st.   134.7 129.7 139.7
Fixing the lever   *
Timer adjustment
Pump speed r/min   865+50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1075
Advance angle deg.   4.5 4.2 4.8
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106671-3841
N:Pump speed R:Rack position (mm) (1)RACK LIMIT: R1 (2)Damper spring setting: DL
----------
R1=(8.6)mm DL=3.3-0.2mm
----------

Speed control lever angle

Test data 106671-3841
F:Full speed
----------

----------
a=17deg+-5deg

0000000901

Test data 106671-3841
F:Full load I:Idle
----------

----------
a=17deg+-5deg b=39deg+-3deg

Stop lever angle

Test data 106671-3841
N:Pump normal S:Stop the pump.
----------

----------
a=40deg+-5deg b=64deg+-5deg

0000001501 MICRO SWITCH

Switch adjustment Adjust the bolt so that the lower lever position is obtained when the switch is turned ON. (1)Speed N1 (2)Rack position Ra
----------
N1=300+25r/min Ra=4mm
----------

Timing setting

Test data 106671-3841
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(0deg)




Information:

You must read and understand the warnings and instructions contained in the Safety section of this manual before performing any operation or maintenance procedures.Before proceeding with Every 50 Hour maintenance, perform all Daily maintenance requirements.Dust Collector
Never run the engine without an air cleaner installed. Never run the engine with a damaged air cleaner. Do not use filter elements with damaged pleats, gaskets or seals. Dirt entering the engine causes premature wear and damage to engine components. Air cleaners prevent airborne debris from entering the engine through the air inlet.
Clean
Typical two stage air cleaner. Individual applications may be different.1. Remove the air cleaner cap (1). Remove the dust collector cup (2).2. Wipe dust collector cup with a clean, dry cloth.3. Install the cup. Install and secure the cap. If equipped with a heavy duty air cleaner: refer to the Heavy Duty Air Cleaner topic in the Daily section of this manual for information about cleaning the dust collector cup.Light Duty Air Cleaner (If Equipped)
Light duty air cleaners are not serviceable (washable). Light duty air cleaners are intended for a 50 service hours of maximum use, or one year, whichever occurs first. However, engines operating in a severe environment may require more frequent air cleaner replacement.Dust conditions vary for different operating environments. Service the air cleaner at regular intervals as determined by the operating environment. Check the air cleaner service indicator (if equipped) daily.Check the air cleaner for cleanliness and damage such as rips and tears. Replace the air cleaner element at the required service interval, or more often as determined by the operating environmental dust conditions. To Replace the Light Duty Air Cleaner Element: 1. Loosen the clamp (2) fastening the air cleaner element (1) to the air inlet, and remove the dirty element and clamp.2. Install the clamp on a new element.3. Install the new element to the air inlet and tighten the clamp.

Have questions with 106671-3841?





Group cross 106671-3841 ZEXEL

Hino 

 
220004510A 
INJECTION-PUMP ASSEMBLY
EP100
 
220004511A 
INJECTION-PUMP ASSEMBLY
EP100
 
220004512A 
INJECTION-PUMP ASSEMBLY
EP100
9 400 616 782 
220004513A 
INJECTION-PUMP ASSEMBLY
EP100
 
220004540A 
INJECTION-PUMP ASSEMBLY
EK100
 
220004520A 
INJECTION-PUMP ASSEMBLY
EK100
9 400 610 840 
220004521A 
INJECTION-PUMP ASSEMBLY
EK100
 
220202620A 
INJECTION-PUMP ASSEMBLY
EP100T
 
220004590A 
INJECTION-PUMP ASSEMBLY
EK200
106671-3841  

106671-8030 
 
220004591A 
INJECTION-PUMP ASSEMBLY
EK200
9 400 610 841 
220004560A 
INJECTION-PUMP ASSEMBLY
EK100
9 400 610 842 
220004600A 
INJECTION-PUMP ASSEMBLY
EK100
 
220004740A 
INJECTION-PUMP ASSEMBLY
EK100
 
220004741A 
INJECTION-PUMP ASSEMBLY
EK100
 
220004790A 
INJECTION-PUMP ASSEMBLY
EK100
9 400 616 783 
220004810A 
INJECTION-PUMP ASSEMBLY
EK100
Back to top