106671-3411 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066713411 220201523a


 

Information injection-pump assembly

ZEXEL 106671-3411 1066713411
HINO 220201523A 220201523a
106671-3411 INJECTION-PUMP ASSEMBLY
Rating:
16
Buy INJECTION-PUMP ASSEMBLY 106671-3411 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
106671-3411 
106671-3413 
 
220201523A  HINO
INJECTION-PUMP ASSEMBLY
EK100 *




Information:

6. No or poor response to throttle
Active Diagnostic Codes: Troubleshoot any active diagnostic codes. ECM: Verify that ECM has completed its start-up self-checks and is out of cold mode. Throttle Position Signal: Check electrical connectors and wiring. Supply voltage to sensor should be between 22 and 27 V DC. Rack Controls: Check electrical connectors and wiring from ECM to rack position sensor and to rack BTM. Measure the signal output to the ECM. Also check for binding of servo or rack.7. Low power/Engine speed (rpm) restricted
Fuel Supply: Check for empty fuel tank, plugged fuel tank connections, obstructed or kinked fuel suction lines, plugged fuel filter, air in fuel system or kinked, leaking or broken fuel lines. Inlet Air System: Check for plugged air filter, aftercooler restrictions, aftercooler leaks, high inlet air temperature. Inspect all gaskets and piping for leaks. Exhaust System: Check for any restrictions. Fuel Injection Nozzle/Pump: If the engine is misfiring or engine speed (rpm) is restricted, run the engine at the speed where the problem is most pronounced. Momentarily loosen the fuel line nut on the injection pump to "cut out" that cylinder. Check each cylinder in this manner. If one is found where loosening makes no difference in irregular operation, the pump and nozzle for that cylinder should be inspected for damage, wear and proper operation. Inspect components for leaks and replace as needed. Fuel Injection Timing: See your authorized dealer. Valve Lash: Adjust valves to specified clearances. Turbocharger: Check for carbon buildup or restricted movement of turbo wheel. Replace if necessary. Auxiliary Attachments: Inspect, align, tighten and check for excessive parasitic loading. Active Diagnostic Codes: Troubleshoot any active diagnostic codes. Factory Parameters: Verify that Full Load Setting and Full Torque Setting are programmed to the values stamped on the engine information plate. Rack Controls: Check electrical connectors and wiring from ECM to rack position sensor and to rack BTM. Measure the signal output to the ECM. Also check for binding of servo or rack. Throttle Position Signal: Check electrical connectors and wiring. Supply voltage to sensor should be between 22 and 27 V DC.8. Intermittent engine shutdowns or power reduction
Fuel Supply: Check for empty fuel tank, plugged fuel tank connections, obstructed or kinked fuel suction lines, plugged fuel filter, air in fuel system or kinked, leaking or broken fuel lines. Shutoff Solenoid: Actuate the control that operates the shutoff solenoid and listen for a "clicking" sound. Power Supply to ECM: Check electrical connectors, wiring and voltage from battery to ECM. Power to ECM should measure 22 to 27 volts. Shutoff Solenoid: Check electrical connectors and wiring. Mechanically override the shutoff solenoid by attaching a lever to the fuel pump. Push lever backward to override the solenoid or forward to shutoff fuel supply. Rack Controls: Check electrical connectors and wiring from ECM to rack position sensor and to rack BTM. Measure the signal output to the ECM. Also check for binding of servo or rack. Engine Speed Signal: (Magnetic Pickup) Check electrical connectors and

Have questions with 106671-3411?





Group cross 106671-3411 ZEXEL

Hino 

 
220201520A 
INJECTION-PUMP ASSEMBLY
EK100
106671-3411  

106671-3413 
 
220201523A 
INJECTION-PUMP ASSEMBLY
EK100
 
 
INJECTION-PUMP ASSEMBLY

Hino 

 
220201524A 
INJECTION-PUMP ASSEMBLY
9 400 616 769 
220201524A 
INJECTION-PUMP ASSEMBLY
EK100
Back to top