106671-3281 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066713281 220002173a


 

Information injection-pump assembly

ZEXEL 106671-3281 1066713281
HINO 220002173A 220002173a
106671-3281 INJECTION-PUMP ASSEMBLY
Rating:
82
Buy INJECTION-PUMP ASSEMBLY 106671-3281 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-3281 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-5490
3. GOVERNOR 105488-7480
4. SUPPLY PUMP 105217-1300
5. AUTOM. ADVANCE MECHANIS 105635-0110
6. COUPLING PLATE 105662-0500
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4540
11. Nozzle and Holder 23600-1220
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105031-5300
14. NOZZLE 105015-4140
15. NOZZLE SET

Include in #1:

106671-3281 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106671-3281 1066713281
HINO 220002173A 220002173a


Zexel num
Bosch num
Firm num
Name
106671-3281 
106671-3282 
 
220002173A  HINO
INJECTION-PUMP ASSEMBLY
EK100 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-0920
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.3 3.24 3.3
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   A
Rack position   9.9
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   125.5 122.5 128.5
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   10.4
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   141.2 139.2 143.2
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   10.9
Pump speed r/min   1150 1150 1150
Average injection quantity mm3/st.   149.7 146.7 152.7
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   D
Rack position   5.5+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   16 13 19
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Timer adjustment
Pump speed r/min   950
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   1000
Advance angle deg.   1.5
Timer adjustment_03
Pump speed r/min   1050
Advance angle deg.   1.9 1.4 2.4
Timer adjustment_04
Pump speed r/min   1150
Advance angle deg.   4.5 4.2 4.8
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106671-3281
N:Pump speed R:Rack position (mm) (1)Beginning of damper spring operation: DL (2)RACK LIMIT: RAL
----------
DL=5.9-0.2mm RAL=11.4+0.2mm
----------

Speed control lever angle

Test data 106671-3281
F:Full speed
----------

----------
a=15deg+-5deg

0000000901

Test data 106671-3281
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=29deg+-3deg

Stop lever angle

Test data 106671-3281
N:Pump normal S:Stop the pump.
----------

----------
a=15deg+-5deg b=64deg+-5deg

0000001501 MICRO SWITCH

Switch adjustment Adjust the bolt so that the lower lever position is obtained when the switch is turned ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325-25r/min Ra=5.6mm
----------




Information:

Replace:
Thrust, Main and Rod Bearings, Valve Rotators, Thermostat and Throttle Position SensorIn most probability, these components will not last until the second overhaul. Therefore, Caterpillar recommends the installation of these components new at each overhaul period.Inspect:
Crankshaft, Camshaft, Camshaft Followers, Vibration Damper, Spacer Block, Oil Pump and Fuel Transfer PumpThe ideal time for inspecting your crankshaft, camshaft and vibration damper is while the engine is disassembled for overhaul. Inspect each component for potential damage as follows:Crankshaft - Inspect for bend, journal damage and bearing material seized to the journal. At the same time, check the taper and profile of the crankshaft journals by interpreting your main and rod bearing wear patterns. In case of an out-of-frame overhaul, use the magnetic particle inspection process to check the crankshaft for cracks.* Camshaft - Inspect the camshaft for journal damage. In case of an out-of-frame overhaul, use the magnetic particle inspection process to check the camshaft for cracks.* Camshaft Followers - For out-of-frame overhaul, inspect the cam bearing for fatigue and wear.* Vibration Damper - Inspect the damper for rubber deterioration and movement of the outer ring relative to the inner hub.* Spacer Block - Inspect the spacer block for excessive wear or warping. For additional information regarding these components, contact your local Caterpillar dealer for assistance.Test:
Electronic Unit Injectors For additional information regarding this component, contact your local Caterpillar dealer for assistance.Clean/Test:
Oil Cooler Core and Aftercooler CoreCaterpillar recommends that the oil cooler core and the air-to-air aftercooler core be cleaned and pressure tested at each overhaul. For additional specifications and/or pressure test information, contact your local Caterpillar dealer.Cleaning Procedure for Air-to-Air Aftercooler
Caterpillar recommends that the air-to-air aftercooler core be removed, cleaned, and tested at overhaul time, if a turbocharger failure has occurred, or if at any time the turbocharger develops an oil leak.To clean the air-to-air aftercooler system:1. Remove the air-to-air aftercooler core. Turn the core upside down to remove debris from the inlet tank.
Do not use caustic cleaners to clean the air-to-air aftercooler core. Caustic cleaners will attack the internal metals of the core and cause leakage.
2. Back flush internally with a solvent to loosen foreign substances and to remove oil.Caterpillar recommends the use of Caterpillar Hydrosolv 4165 or Hydrosolv 100 Liquid Cleaners. For more information see "General Instructions and Application Guide" Form LEHQ6101 or contact your Caterpillar dealer.3. Shake the core vigorously to eliminate any trapped debris.4. Wash the core with hot, soapy water. Rinse thoroughly with clean water.
The maximum air pressure must not be above 30 psi (205 kPa) for cleaning purposes.
5. Dry the core with compressed air. Blow air in reverse direction of normal flow. Use all necessary safety equipment while using compressed air.6. Inspect the system to ensure cleanliness and install the air-to-air aftercooler core.Caterpillar Recommendation
The "repair before failure" concept makes sense. It saves money, lowers operating costs and minimizes downtime.As previously illustrated, it is not cheaper to operate the truck until an engine component fails, since failing components may increase fuel costs and upon failure, could

Have questions with 106671-3281?





Group cross 106671-3281 ZEXEL

Hino 

 
220001591A 
INJECTION-PUMP ASSEMBLY
EK100
9 400 610 094 
220001593A 
INJECTION-PUMP ASSEMBLY
EK100
 
220201121A 
INJECTION-PUMP ASSEMBLY
EK100
 
220201123A 
INJECTION-PUMP ASSEMBLY
EK100
 
220001911A 
INJECTION-PUMP ASSEMBLY
EK100
 
220001912A 
INJECTION-PUMP ASSEMBLY
EK100
 
220002111A 
INJECTION-PUMP ASSEMBLY
EK100
 
220002112A 
INJECTION-PUMP ASSEMBLY
EK100
 
220001491A 
INJECTION-PUMP ASSEMBLY
EK100
 
220001493A 
INJECTION-PUMP ASSEMBLY
EK100
9 400 610 084 
220001494A 
INJECTION-PUMP ASSEMBLY
EK100
 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 616 767 
220001494B 
INJECTION-PUMP ASSEMBLY
EK100
9 400 619 432 
220001495A 
INJECTION-PUMP ASSEMBLY
EK100
 
220002170A 
INJECTION-PUMP ASSEMBLY
EK100
 
220002180A 
INJECTION-PUMP ASSEMBLY
 
220002580A 
INJECTION-PUMP ASSEMBLY
EK200
 
220002581A 
INJECTION-PUMP ASSEMBLY
EK200
 
220002171A 
INJECTION-PUMP ASSEMBLY
106671-3281  

106671-3282 
 
220002173A 
INJECTION-PUMP ASSEMBLY
EK100
9 400 610 110 
220002175A 
INJECTION-PUMP ASSEMBLY
EK100
 
220002350A 
INJECTION-PUMP ASSEMBLY
EK100
 
220002351A 
INJECTION-PUMP ASSEMBLY
EK100
Back to top