106671-2595 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066712595 3626520140


 

Information injection-pump assembly

ZEXEL 106671-2595 1066712595
MITSUBISHI-HEAV 3626520140 3626520140
106671-2595 INJECTION-PUMP ASSEMBLY
Rating:
77
Buy INJECTION-PUMP ASSEMBLY 106671-2595 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-2595 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106060-5214
3. GOVERNOR 105407-2762
4. SUPPLY PUMP 105217-1331
5. AUTOM. ADVANCE MECHANIS 105636-1920
6. COUPLING PLATE 105662-0780
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5171
11. Nozzle and Holder 36261-11070
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105031-4441
14. NOZZLE 105015-4350
15. NOZZLE SET

Include in #1:

106671-2595 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106671-2595 
106671-2596 
 
3626520140  MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
S6B * K




Information:

Start By:a. remove timing gear coverb. remove fuel injection pump housing and rack actuator package 1. Remove four bolts (2), plate (3) and idler gear (1). 2. If the camshaft is not going to be removed, use tooling (A) to remove camshaft gear (4).
Do not turn the crankshaft with the camshaft gear removed. Damage can be caused to the pistons and valves, or both.
3. Remove bolts (5) that hold timing gear plate (6) to the cylinder block.4. Remove timing gear plate (6). 5. Use tooling (B) to remove the bearing from the idler gear. The following steps are for the installation of the timing gears and plate.6. Install a new gasket on the timing gear plate.7. Put timing gear plate (6) in position on the cylinder block, and install the bolts that hold the timing gear plate to the cylinder block.8. Heat camshaft gear (4) to a maximum temperature of 315° C (600° F), and install it on the camshaft.9. Use tooling (B), and install the bearing in the idler gear. Set the gear on the front face, (face with timing marks). Drive the bearing from the rear face toward the front face of the gear. Install the bearing to a depth of 1.5 0.5 mm (.06 .02 in.) below the rear face of the idler gear.10. Install the idler gear, plate and bolts. Be sure No. 1 cylinder is at top center on the compression stroke. Install the idler gear so "V" mark (7) on the idler gear is in alignment with the "V" mark on the crankshaft gear. "K" marks (8) of the camshaft gear can be seen at the outer edges of the idler gear.End By:a. install fuel injection pump housing and rack actuator packageb. install timing gear cover

Have questions with 106671-2595?





Group cross 106671-2595 ZEXEL

Mitsubishi-Heav 

 
3629820300 
INJECTION-PUMP ASSEMBLY
S6B
 
3626500120 
INJECTION-PUMP ASSEMBLY
S6B
 
3626510120 
INJECTION-PUMP ASSEMBLY
S6B
 
3626510121 
INJECTION-PUMP ASSEMBLY
S6B
9 400 619 766 
3626510140 
INJECTION-PUMP ASSEMBLY
S6B
106671-2595  

106671-2596 
 
3626520140 
INJECTION-PUMP ASSEMBLY
S6B
 
3626530140 
INJECTION-PUMP ASSEMBLY
S6B
9 400 616 754 
3626540140 
INJECTION-PUMP ASSEMBLY
S6B
Back to top