106671-2301 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066712301 3626107290


 

Information injection-pump assembly

ZEXEL 106671-2301 1066712301
MITSUBISHI-HEAV 3626107290 3626107290
106671-2301 INJECTION-PUMP ASSEMBLY
Rating:
18
Buy INJECTION-PUMP ASSEMBLY 106671-2301 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
106671-2301 
 
3626107290  MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
S6B * K




Information:

Start By:a. remove pistons
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Remove the coolant from the cylinder block.2. Put covers on journals of crankshaft to protect from dirt or water. 3. Remove cylinder liners (1) with tooling (A).Install Cylinder Liners
1. Clean the cylinder liners (1) and the liner bores in the cylinder block.2. Install the cylinder liners in the block without the O-ring seals or filler bands.3. Check the cylinder liner projection as follows:a. Install the S1589 Bolts (2) and 1S379 Washers of tooling (B) on the cylinder block next to each liner. Tighten the bolts evenly, in four steps: 14 N m (10 lb ft), 35 N m (25 lb ft), 70 N m (50 lb ft) and 95 N m (70 lb ft).b. Put adapter plate on top of the liner and install the remainder of tooling (B). Tighten the 1D4595 Bolts (3) evenly in four steps: 7 N m (5 lb ft), 20 N m (15 lb ft), 35 N m (25 lb ft) and 70 N m (50 lb).c. Check to be sure the distance from the bottom edge of the crossbar to the top of the cylinder block is the same on both sides of the liner.d. Check the cylinder liner projection with tool group (C) at four locations around the liner.e. Liner projection must be 0.033 to 0.175 mm (.0013 to .0069 in). Measurements on the same liner must not be different by more than 0.05 mm (.002 in). Average measurements between liners next to each other must not be different by more than 0.05 mm (.002 in). If the liner is turned in the bore, it can make a difference in the liner projection.4. If the liner projection is not 0.033 to 0.175 mm (.0013 to .0069 in), check the thickness of the following parts: spacer plate, spacer plate gasket and cylinder liner flange. The thickness of the spacer plate must be 9.970 0.025 mm (.3925 .0020 in). The thickness of the spacer plate gasket must be 0.208 0.025 mm (.0082 .0010 in). The thickness of the cylinder liner flange must be 10.282 0.020 mm (.4048 .0008 in). Cylinder liner projection can be adjusted by the removal of material from (machining) the contact face of the cylinder block with the use of the 8S3140 Cylinder Block Counterboring Tool Arrangement. Machine to a minimum depth of 0.76 mm (.030 in) and to a maximum depth of 1.14 mm (.045 in). The instructions for the use of the tool group are in Special Instruction, Form No. FM055228. Shims are available for the adjustment of the liner projection. See the topic, Cylinder Liner Projection in Testing And Adjusting, for the shim thickness and part number.5. Remove tooling (B) and (C). Remove the liner. 6. Put liquid soap on bottom liner bore in block, on grooves in lower liner and on O-ring seals on the liner.7. Put filler

Have questions with 106671-2301?





Group cross 106671-2301 ZEXEL

Mitsubishi-Heav 

106671-2301  
 
3626107290 
INJECTION-PUMP ASSEMBLY
S6B
 
3256500060 
INJECTION-PUMP ASSEMBLY
S6A
 
3256510060 
INJECTION-PUMP ASSEMBLY
S6A
 
3256510061 
INJECTION-PUMP ASSEMBLY
S6A
9 400 616 748 
3256500180 
INJECTION-PUMP ASSEMBLY
S6A
 
3256502060 
INJECTION-PUMP ASSEMBLY
S6A
 
3256502061 
INJECTION-PUMP ASSEMBLY
S6A
 
3256502160 
INJECTION-PUMP ASSEMBLY
S6A
 
3256502161 
INJECTION-PUMP ASSEMBLY
S6A

Mitsubishi 

9 400 616 749 
ME059510 
INJECTION-PUMP ASSEMBLY
6D22CT

Mitsubishi-Heav 

 
3256500020 
INJECTION-PUMP ASSEMBLY
S6A
 
 
INJECTION-PUMP ASSEMBLY
S6A
 
3256510051 
INJECTION-PUMP ASSEMBLY
S6A
 
3256500080 

S6A
 
3266510160 
INJECTION-PUMP ASSEMBLY
S12A
 
3266510161 
INJECTION-PUMP ASSEMBLY
S12A
 
3266510162 
INJECTION-PUMP ASSEMBLY
S12A
9 400 613 476 
3266520160 
INJECTION-PUMP ASSEMBLY
S12A
Back to top