106671-0642 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066710642


 

Information injection-pump assembly

ZEXEL 106671-0642 1066710642
106671-0642 INJECTION-PUMP ASSEMBLY
Rating:
25
Buy INJECTION-PUMP ASSEMBLY 106671-0642 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-0642 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106061-5300
3. GOVERNOR 105489-1261
4. SUPPLY PUMP 105217-1850
5. AUTOM. ADVANCE MECHANIS 105636-1810
6. COUPLING PLATE 105662-0751
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-5600
11. Nozzle and Holder 1660096520
12. Open Pre:MPa(Kqf/cm2) 22.6(230)
13. NOZZLE-HOLDER 105031-4370
14. NOZZLE 105015-6340
15. NOZZLE SET

Include in #1:

106671-0642 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106671-0642 
 
   
INJECTION-PUMP ASSEMBLY




Information:

start by: a) remove cylinder head1. Remove precombustion chambers and valve lifters. 2. Use tooling (A) to compress the valve spring. Remove locks that hold spring to valve stem.3. Remove tooling (A), the valve and spring assembly. 4. Inspect the valve seat insert. Measure the diameter of the valve stem. The minimum diameter of the stem is .3689 in. (9.37 mm). For 2M6402 and 2M6403 valves minimum diameter of valve stem is .3692 in. (9.378 mm). 5. Use tool (B) to measure valve spring force. Test force for valve springs is 55.0 3.5 lb. (244.65 15.57 N).6. The free length of spring is 2.31 in. (58.7 mm). The test length is 1.95 in. (49.5 mm). 7. Put clean engine oil on the valve stem. Install the washer, spring (1) and rotocoil (2). Install the valve through the valve guide.8. Install tooling (A) to put the valve spring under compression.
The valve spring must be put under compression just enough to permit the locks to be put in position on the valve stem.
9. Install the locks on the valve stem.
The locks can be thrown from the valve when the compressor is removed. Make certain the locks are in position before the valve compressor is removed.
10. Remove tooling (A) and hit the valve with a soft hammer to be sure that the locks make a seat on the valve stem.11. Install the valve lifters and precombustion chambers.end by: a) install cylinder head

Have questions with 106671-0642?





Group cross 106671-0642 ZEXEL

F 019 Z20 410 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 668 
1671396775 
INJECTION-PUMP ASSEMBLY
PE6TB
 
 
INJECTION-PUMP ASSEMBLY
PF6T
F 019 Z20 406 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 669 
1680096576 
INJECTION-PUMP ASSEMBLY
PF6T
F 019 Z20 398 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 670 
1680096577 
INJECTION-PUMP ASSEMBLY
PF6TB
F 019 Z20 407 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671396520 
INJECTION-PUMP ASSEMBLY
PE6TC
F 019 Z20 411 
 
INJECTION-PUMP ASSEMBLY
106671-0642  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 671 
1671396801 
INJECTION-PUMP ASSEMBLY
PE6TB
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 672 
1671396800 
INJECTION-PUMP ASSEMBLY
PE6TC
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 673 
1671396802 
INJECTION-PUMP ASSEMBLY
PF6T03
F 019 Z20 397 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

F 019 Z20 408 
1680096578 
INJECTION-PUMP ASSEMBLY
PF6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1680096579 
INJECTION-PUMP ASSEMBLY
PF6TB
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1680196578 
INJECTION-PUMP ASSEMBLY
PF6T
Back to top