106671-0572 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066710572


 

Information injection-pump assembly

ZEXEL 106671-0572 1066710572
106671-0572 INJECTION-PUMP ASSEMBLY
Rating:
21
Buy INJECTION-PUMP ASSEMBLY 106671-0572 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
106671-0572 
 
   
INJECTION-PUMP ASSEMBLY




Information:

2. Remove bolts (1). 3. Disconnect air hose (2) from the cylinder head to the air compressor.4. Remove air compressor inlet tube (3).5. Disconnect the air tube from the inlet manifold to the fuel ratio control. 6. Remove oil inlet tube (4).7. Remove two bolts (5). 8. Remove the bolts that hold the cylinder head to the cylinder block.9. Fasten a hoist to the cylinder head. Carefully remove the head from the block. Weight is 164 lb. (74.4 kg).Install Cylinder Head
1. Install a new, dry cylinder head gasket.2. Fasten a hoist to the cylinder head and put the cylinder head in position on the cylinder block.3. Install the push rods. Put the rocker shaft in position on the engine.
Dowel pins (A) on each end of the rocker shaft assembly must be in alignment with holes (B). If the pins and holes are not in alignment during installation of the rocker shaft assembly, damage to the rocker shaft assembly will be the result.
4. Put 5P3931 Anti-Seize Compound on the threads of cylinder head and rocker shaft bolts. Install the bolts in the following step sequence: 1. Tighten all bolts in number sequence to a torque of 115 lb. ft. (155 N m).2. Tighten all bolts in number sequence to a torque of 185 13 lb. ft. (250 17 N m).3. Tighten all bolts in number sequence (hand turn only) to a torque of 185 13 lb. ft. (250 17 N m) again.4. Tighten all bolts (hand turn only) in letter sequence to a torque of 32 5 lb. ft. (43 7 N m). 5. Make an adjustment to the valves to get a clearance of .015 in. (0.38 mm) for the intake valves and .025 in. (0.64 mm) for the exhaust valves.6. Install the turbocharger oil inlet tube. Install the two bolts that connect the oil outlet tube to the turbocharger.7. Connect the air tube from the fuel ratio control to the inlet manifold.8. Connect the air hose from the air compressor to the cylinder head.9. Install the two bolts removed from the temperature regulator.10. Fill the cooling system with coolant to the correct level.end by:a) install fan driveb) install fuel injection lines

Have questions with 106671-0572?





Group cross 106671-0572 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1680196567 
INJECTION-PUMP ASSEMBLY
PF6T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 665 
1671396769 
INJECTION-PUMP ASSEMBLY
PE6TB
F 019 Z20 404 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 666 
1680096575 
INJECTION-PUMP ASSEMBLY
PF6TB
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1680196571 
INJECTION-PUMP ASSEMBLY
PF6TB
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 667 
1680096574 
INJECTION-PUMP ASSEMBLY
PF6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1680196570 
INJECTION-PUMP ASSEMBLY
PF6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z0001 
INJECTION-PUMP ASSEMBLY
GD6TA
 
 
INJECTION-PUMP ASSEMBLY
PE6TC
106671-0572  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1680196572 
INJECTION-PUMP ASSEMBLY
PE6TC
 
 
INJECTION-PUMP ASSEMBLY
PE6TB
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1680196573 
INJECTION-PUMP ASSEMBLY
PE6TB
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 612 425 
 
INJECTION-PUMP ASSEMBLY
PE6T

Nissan-Diesel 

9 400 613 475 
1671396774 
INJECTION-PUMP ASSEMBLY
PE6T
Back to top