106662-2000 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066622000 0429050180


 

Information injection-pump assembly

ZEXEL 106662-2000 1066622000
MITSUBISHI-HEAV 0429050180 0429050180
106662-2000 INJECTION-PUMP ASSEMBLY
Rating:
83
Buy INJECTION-PUMP ASSEMBLY 106662-2000 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 106662-2000 1066622000
MITSUBISHI-HEAV 0429050180 0429050180


Zexel num
Bosch num
Firm num
Name
106662-2000 
106662-2181 
 
0429050180  MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
6DH *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   2.05 2 2.1
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   16.6
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   324 316 332
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   34.5 31 38
Max. variation between cylinders %   0 -10 10
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 106662-2000
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Idle sub spring setting: L1.
----------
K=10 L1=6.5-0.5mm
----------

Speed control lever angle

Test data 106662-2000
F:Full speed S:Stop
----------

----------
a=(18deg) b=32deg+-3deg

0000000901

Test data 106662-2000
F:Full load I:Idle S:Stop (1)Stop side boss position
----------

----------
a=7deg+-5deg b=31deg+-5deg c=30deg+-5deg




Information:


Illustration 13 g02915447
Plugged DOC
The DOC utilizes a “pass-through” technology, which is different from the “wall flow” design of a DPF. When a light is shined through the DOC, a visible light should be able to pass through. Utilize a flashlight to check for a plugged DOC face. Aim the flashlight into the DOC inlet, visible light should be seen through the DOC. A plugged DOC can be caused by high oil consumption, not recommended fuel additives, or wrong engine oil types. Refer to the Operation and Maintenance Manual for recommended fluids to use. If light cannot be seen on the outlet of the DOC, then replace the DOC.CRS Bodies
Illustration 14 g06342815
Combustion Group
(1) Head Group - Combustion
(2) Gasket
(3) Tube
(4) Body Assembly - Exhaust CombustionCRS Combustion Body (4) contains the flame necessary for CRS Regeneration. There are two combustion stages that occur within the CRS Body: the primary and secondary combustion. The primary combustion of air and fuel occur within Tube (3) to create the CRS flame immediately following Head Group (1). The secondary combustion of the CRS flame and exhaust gas from the turbocharger occur within Body Assembly (4).The body assembly is the only salvageable part of the combustion group. The body assembly must be cleaned, inspected, and pressure tested prior to reuse.Cleaning
Start by isolating the CRS body from all other CRS exhaust components. Remove the head group, the mounting studs, the tube, and the two gaskets.The gasket area and the bellows joints are the two areas of the CRS body that must be cleaned thoroughly to make a proper seal.Cleaning the remainder of the CRS body is not required. If cleaning the CRS body is desired, then first perform the visual inspection, vacuum inspection, and welding procedures prior to washing the CRS body. This step is to ensure that the CRS body is salvageable, not cracked, and to keep water from getting trapped behind the heat shield.If washing is preferred, then use soap and water as a cleaning solution. Do not submerge the CRS body to prevent water from becoming trapped between the heat shield and the CRS body. A cylinder washing brush, a wire brush with handle, and a greenScotch Brite pads are all acceptable cleaning equipment. Removal of all diesel particulates is not required for inspection.
Do not use any combustible solvents to clean the CRS body.
Visual Inspection
A visual inspection of the CRS body must be completed, special equipment or crack detecting solution is not required. Visually inspect the exterior of the CRS body. Small cracks and/or punctures found on the stainless steel heat shield is normal and should be expected. Inspect the bellows sealing joints and the CRS head mating surface for visual damage.Light surface rust is typically not a problem unless rust is found on a bellows joint or the CRS gasket mating surface. Light rust in these two areas must be removed using a Scotch Brite pad.Serviceability
All bolts, studs, and clamps are not reusable and must be replaced with new components.Any thread damage in the mounting

Have questions with 106662-2000?





Group cross 106662-2000 ZEXEL

Mitsubishi-Heav 

106662-2000  

106662-2181 
 
0429050180 
INJECTION-PUMP ASSEMBLY
6DH
 
0429050550 

12DH

Mitsubishi-Heav 

 
0429050150 

6DH
 
0429050580 

12DH

Mitsubishi-Heav 

 
0429050191 

6DH
 
0429050100 

6DH

Mitsubishi-Heav 

 
0429050590 
INJECTION-PUMP ASSEMBLY
12DH
Back to top