Information injection-pump assembly
BOSCH
9 400 616 632
9400616632
ZEXEL
106661-5580
1066615580
NISSAN-DIESEL
1671396075
1671396075

Rating:
Service parts 106661-5580 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
12.
Open Pre:MPa(Kqf/cm2)
22.6(230)
15.
NOZZLE SET
Include in #1:
106661-5580
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 616 632
9400616632
ZEXEL
106661-5580
1066615580
NISSAN-DIESEL
1671396075
1671396075
Zexel num
Bosch num
Firm num
Name
106661-5580
9 400 616 632
1671396075 NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
PE6T04 K
PE6T04 K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
132424-0620
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-4-2-6-
3-5
Pre-stroke
mm
3.2
3.15
3.25
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-4 deg. 60 59.5 60.5
Cal 1-4 deg. 60 59.5 60.5
Difference between angles 2
Cyl.1-2 deg. 120 119.5 120.5
Cyl.1-2 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cal 1-3 deg. 240 239.5 240.5
Cal 1-3 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-5 deg. 300 299.5 300.5
Cal 1-5 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
11.5
Pump speed
r/min
750
750
750
Average injection quantity
mm3/st.
149.6
147.6
151.6
Max. variation between cylinders
%
0
-4
4
Basic
*
Fixing the lever
*
Boost pressure
kPa
33.3
33.3
Boost pressure
mmHg
250
250
Injection quantity adjustment_02
Adjusting point
D
Rack position
6.1+-0.5
Pump speed
r/min
225
225
225
Average injection quantity
mm3/st.
11
10
12
Max. variation between cylinders
%
0
-10
10
Fixing the rack
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Boost compensator adjustment
Pump speed
r/min
500
500
500
Rack position
10.3
Boost pressure
kPa
6.7
4.7
8.7
Boost pressure
mmHg
50
35
65
Boost compensator adjustment_02
Pump speed
r/min
500
500
500
Rack position
(11.5)
Boost pressure
kPa
20
13.3
26.7
Boost pressure
mmHg
150
100
200
Timer adjustment
Pump speed
r/min
350
Advance angle
deg.
0.5
Timer adjustment_02
Pump speed
r/min
900
Advance angle
deg.
2.5
2
3
Timer adjustment_03
Pump speed
r/min
1100
Advance angle
deg.
4
3.5
4.5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Load control lever's full position
(2)Speed control lever full position
(3)Target notch: K
(4)Boost compensator excessive fuel lever at operation: L1 (at 0 boost pressure)
(5)Boost compensator stroke: BCL
(6)Set the load lever at the stop position.
----------
K=17 L1=12.1+-0.1mm BCL=(1.2)mm
----------
----------
K=17 L1=12.1+-0.1mm BCL=(1.2)mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=12deg+-5deg b=27deg+-5deg
----------
----------
a=12deg+-5deg b=27deg+-5deg
0000000901

F:Full load
I:Idle
S:Stop
(1)Rack position aa or less, pump speed bb
(2)Use the hole above R = cc
(3)Without return spring
----------
aa=5.6mm bb=0r/min cc=55mm
----------
a=23deg+-5deg b=24deg+-5deg c=32deg+-3deg
----------
aa=5.6mm bb=0r/min cc=55mm
----------
a=23deg+-5deg b=24deg+-5deg c=32deg+-3deg
0000001101

N:Normal
B:When boosted
(1)Rack position = aa at boost pressure 0.
(2)Drive side
----------
aa=12.1+-0.1mm
----------
a=10deg+-5deg b=(20deg)
----------
aa=12.1+-0.1mm
----------
a=10deg+-5deg b=(20deg)
0000001501 GOV FULL LOAD ADJUSTMENT

Title1:Full load stopper adjustment
Title2:Governor set speed
LABEL1:Distinguishing
LABEL2:Pump speed (r/min)
LABEL3:Ave. injection quantity (mm3/st)
LABEL4:Max. var. bet. cyl.
LABEL5:Remarks
LABEL6:Distinguishing
LABEL7:Governor set speed (r/min)
LABEL8:Maximum no-load speed (r/min)
LABEL9:Remarks
(1)Adjustment conditions are the same as those for measuring injection quantity.
(2)At high idle rack position L
----------
L=6.1mm
----------
a1=A a2=B a3=C a4=D a5=- a6=- r1=750r/min r2=750r/min r3=750r/min r4=750r/min r5=- r6=- Q1=152+-2mm3/st Q2=149.6+-2mm3/st Q3=139+-2mm3/st Q4=120.1+-2mm3/st Q5=- Q6=- c1=+-4% c2=+-4% c3=+-4% c4=+-4% c5=- c6=- a7=23 a8=22 a9=21 a10=20 a11=19 a12=18 a13=17 a14=16 a15=15 a16=14 a17=13 a18=12 a19=- a20=- r7=1150r/min r8=1100r/min r9=1050r/min r10=1000r/min r11=950r/min r12=900r/min r13=850r/min r14=800r/min r15=750r/min r16=700r/min r17=650r/min r18=600r/min r19=- r20=- R7=1235+-28r/min R8=1180+-27r/min R9=1130+-26r/min R10=1075+-25r/min R11=1020+-23r/min R12=965+-22r/min R13=915+-22r/min R14=860+-20r/min R15=805+-18r/min R16=750+-17r/min R17=695+-16r/min R18=645+-15r/min R19=- R20=-
----------
L=6.1mm
----------
a1=A a2=B a3=C a4=D a5=- a6=- r1=750r/min r2=750r/min r3=750r/min r4=750r/min r5=- r6=- Q1=152+-2mm3/st Q2=149.6+-2mm3/st Q3=139+-2mm3/st Q4=120.1+-2mm3/st Q5=- Q6=- c1=+-4% c2=+-4% c3=+-4% c4=+-4% c5=- c6=- a7=23 a8=22 a9=21 a10=20 a11=19 a12=18 a13=17 a14=16 a15=15 a16=14 a17=13 a18=12 a19=- a20=- r7=1150r/min r8=1100r/min r9=1050r/min r10=1000r/min r11=950r/min r12=900r/min r13=850r/min r14=800r/min r15=750r/min r16=700r/min r17=650r/min r18=600r/min r19=- r20=- R7=1235+-28r/min R8=1180+-27r/min R9=1130+-26r/min R10=1075+-25r/min R11=1020+-23r/min R12=965+-22r/min R13=915+-22r/min R14=860+-20r/min R15=805+-18r/min R16=750+-17r/min R17=695+-16r/min R18=645+-15r/min R19=- R20=-
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(30deg)
----------
----------
a=(30deg)
Information:
Illustration 5 g06198951
70-Pin connector
(5) Pin 4
(6) Pin 24
Illustration 6 g06198953
40-Pin connector
(7) Pin 4
(8) Pin 24
Using the appropriate terminal extraction tool, remove the red and black wires from positions 4 and 24 of the connector. Refer to Illustration 5 and 6.
Route the extracted wires out of the engine harness and insert the wires into 3E-3370 Connector Receptacle As supplied with 517-0586 Engine Harness As. Red wire in position 1 and Black wire in position 2.Note: Minor cutting of the boot may be required.
Install the Red wire from 517-0586 Engine Harness As into position 4 of the Machine Interface Connector and install the Black wire into position 24 of the connector.
Illustration 7 g06237613
70 Pin Harness
(A) Pin 4 From Machine Interface Harness Connector
(B) Pin 24 From Machine Interface Harness Connector
(C) Pyrometer Harness Interface Connector
(D) Machine Interface Connector
Illustration 8 g06237606
40 Pin Harness
(A) Pin 4 From Machine Interface Harness Connector
(B) Pin 24 From Machine Interface Harness Connector
(E) Flying Power Leads from 514-3813 Harness As to 2 Pin Connector
(F) Machine Interface Connector
If the Pyrometer Interface Harness connector is a 70 pin, Route 517-0586 Engine Harness As to the Pyrometer Harness Interface connector and install Red wire into position 70 and the Black wire into position 69. If the Pyrometer Interface Harness connector is a 40 pin, install the Red wire into pin 1 of a 2-pin receptacle and the Black wire into pin 2. This connector will then connect to G-C3 of 514-3813 Engine Harness As.
With the engine powered, use a digital multimeter to verify that 24V power is present at the Pyrometer Harness Interface connector.Installation of 510-4068 Electronic Control Gp (Pyrometer)
Attach 489-3081 Harness As to 510-4068 Electronic Control Gp (Pyrometer) and the Pyrometer Interface Connector. Using 489-3081 Engine Harness As as a gauge, temporarily install the module on an appropriate place as per the choice of installer.Installation of 505-1731 Engine Harness As
If the engine under test is a 16 cylinder instead of a 20 cylinder, 505-1731 Engine Harness As can be installed between 489-3081 Engine Harness As and 510-4068 Electronic Control Gp.Installation of 489-3081 Engine Harness As
Perform the following procedure to install 489-3081 Engine Harness As:
Install 504-3341 Engine Harness As on the service port connector of 489-3081 Engine Harness As.
Route 504-3341 Engine Harness As to a safe location before performing tests.Note: Attach 140-9442 "Y" Adapter Cable As in order to see all the machine ECMs. Connect 504-3341 Monitor Harness As to "Y", connect other leg to Machine Service port and the third leg to Communication Adapter.Overview and Configuration On Caterpillar Electronic Technician (Cat ET)
This section will describe the overview and configuration setting on Cat ET.Cat ET Screen - Standard View
Perform the following instructions once the system is installed:
Connect to communications adapter and launch Cat ET.
Illustration 9 g06198935
After connecting, under "Available ECM(s)" select "Digital Pyrometer #1".
Illustration 10 g06199349
(9) Status button
Select the "Status" (9) button in the toolbar and then the parameters of "Digital Pyrometer #1" will appear.
Selecting "Engine Cylinder Temperature - 1"
Have questions with 106661-5580?
Group cross 106661-5580 ZEXEL
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
106661-5580
9 400 616 632
1671396075
INJECTION-PUMP ASSEMBLY
PE6T04
PE6T04