106661-5580 ZEXEL 9 400 616 632 BOSCH INJECTION-PUMP ASSEMBLY 9400616632 1066615580 1671396075


 

Information injection-pump assembly

BOSCH 9 400 616 632 9400616632
ZEXEL 106661-5580 1066615580
NISSAN-DIESEL 1671396075 1671396075
106661-5580 INJECTION-PUMP ASSEMBLY
Rating:
74
Buy INJECTION-PUMP ASSEMBLY 106661-5580 zexel genuine, new aftermarket engine parts with delivery

Service parts 106661-5580 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106066-1300
3. GOVERNOR 105427-0470
4. SUPPLY PUMP 105217-6010
5. AUTOM. ADVANCE MECHANIS 105614-4320
6. COUPLING PLATE 105662-0761
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4570
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 22.6(230)
13. NOZZLE-HOLDER 105031-4370
14. NOZZLE 105015-4170
15. NOZZLE SET

Include in #1:

106661-5580 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 616 632 9400616632
ZEXEL 106661-5580 1066615580
NISSAN-DIESEL 1671396075 1671396075


Zexel num
Bosch num
Firm num
Name
106661-5580 
9 400 616 632 
1671396075  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
PE6T04 K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.5
Pump speed r/min   750 750 750
Average injection quantity mm3/st.   149.6 147.6 151.6
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Boost pressure kPa   33.3 33.3
Boost pressure mmHg   250 250
Injection quantity adjustment_02
Adjusting point   D
Rack position   6.1+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   11 10 12
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   500 500 500
Rack position   10.3
Boost pressure kPa   6.7 4.7 8.7
Boost pressure mmHg   50 35 65
Boost compensator adjustment_02
Pump speed r/min   500 500 500
Rack position   (11.5)
Boost pressure kPa   20 13.3 26.7
Boost pressure mmHg   150 100 200
Timer adjustment
Pump speed r/min   350
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   900
Advance angle deg.   2.5 2 3
Timer adjustment_03
Pump speed r/min   1100
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106661-5580
N:Pump speed R:Rack position (mm) (1)Load control lever's full position (2)Speed control lever full position (3)Target notch: K (4)Boost compensator excessive fuel lever at operation: L1 (at 0 boost pressure) (5)Boost compensator stroke: BCL (6)Set the load lever at the stop position.
----------
K=17 L1=12.1+-0.1mm BCL=(1.2)mm
----------

Speed control lever angle

Test data 106661-5580
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=12deg+-5deg b=27deg+-5deg

0000000901

Test data 106661-5580
F:Full load I:Idle S:Stop (1)Rack position aa or less, pump speed bb (2)Use the hole above R = cc (3)Without return spring
----------
aa=5.6mm bb=0r/min cc=55mm
----------
a=23deg+-5deg b=24deg+-5deg c=32deg+-3deg

0000001101

Test data 106661-5580
N:Normal B:When boosted (1)Rack position = aa at boost pressure 0. (2)Drive side
----------
aa=12.1+-0.1mm
----------
a=10deg+-5deg b=(20deg)

0000001501 GOV FULL LOAD ADJUSTMENT

Test data 106661-5580
Title1:Full load stopper adjustment Title2:Governor set speed LABEL1:Distinguishing LABEL2:Pump speed (r/min) LABEL3:Ave. injection quantity (mm3/st) LABEL4:Max. var. bet. cyl. LABEL5:Remarks LABEL6:Distinguishing LABEL7:Governor set speed (r/min) LABEL8:Maximum no-load speed (r/min) LABEL9:Remarks (1)Adjustment conditions are the same as those for measuring injection quantity. (2)At high idle rack position L
----------
L=6.1mm
----------
a1=A a2=B a3=C a4=D a5=- a6=- r1=750r/min r2=750r/min r3=750r/min r4=750r/min r5=- r6=- Q1=152+-2mm3/st Q2=149.6+-2mm3/st Q3=139+-2mm3/st Q4=120.1+-2mm3/st Q5=- Q6=- c1=+-4% c2=+-4% c3=+-4% c4=+-4% c5=- c6=- a7=23 a8=22 a9=21 a10=20 a11=19 a12=18 a13=17 a14=16 a15=15 a16=14 a17=13 a18=12 a19=- a20=- r7=1150r/min r8=1100r/min r9=1050r/min r10=1000r/min r11=950r/min r12=900r/min r13=850r/min r14=800r/min r15=750r/min r16=700r/min r17=650r/min r18=600r/min r19=- r20=- R7=1235+-28r/min R8=1180+-27r/min R9=1130+-26r/min R10=1075+-25r/min R11=1020+-23r/min R12=965+-22r/min R13=915+-22r/min R14=860+-20r/min R15=805+-18r/min R16=750+-17r/min R17=695+-16r/min R18=645+-15r/min R19=- R20=-

Timing setting

Test data 106661-5580
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(30deg)




Information:


Illustration 5 g06198951
70-Pin connector
(5) Pin 4
(6) Pin 24
Illustration 6 g06198953
40-Pin connector
(7) Pin 4
(8) Pin 24
Using the appropriate terminal extraction tool, remove the red and black wires from positions 4 and 24 of the connector. Refer to Illustration 5 and 6.
Route the extracted wires out of the engine harness and insert the wires into 3E-3370 Connector Receptacle As supplied with 517-0586 Engine Harness As. Red wire in position 1 and Black wire in position 2.Note: Minor cutting of the boot may be required.
Install the Red wire from 517-0586 Engine Harness As into position 4 of the Machine Interface Connector and install the Black wire into position 24 of the connector.
Illustration 7 g06237613
70 Pin Harness
(A) Pin 4 From Machine Interface Harness Connector
(B) Pin 24 From Machine Interface Harness Connector
(C) Pyrometer Harness Interface Connector
(D) Machine Interface Connector
Illustration 8 g06237606
40 Pin Harness
(A) Pin 4 From Machine Interface Harness Connector
(B) Pin 24 From Machine Interface Harness Connector
(E) Flying Power Leads from 514-3813 Harness As to 2 Pin Connector
(F) Machine Interface Connector
If the Pyrometer Interface Harness connector is a 70 pin, Route 517-0586 Engine Harness As to the Pyrometer Harness Interface connector and install Red wire into position 70 and the Black wire into position 69. If the Pyrometer Interface Harness connector is a 40 pin, install the Red wire into pin 1 of a 2-pin receptacle and the Black wire into pin 2. This connector will then connect to G-C3 of 514-3813 Engine Harness As.
With the engine powered, use a digital multimeter to verify that 24V power is present at the Pyrometer Harness Interface connector.Installation of 510-4068 Electronic Control Gp (Pyrometer)
Attach 489-3081 Harness As to 510-4068 Electronic Control Gp (Pyrometer) and the Pyrometer Interface Connector. Using 489-3081 Engine Harness As as a gauge, temporarily install the module on an appropriate place as per the choice of installer.Installation of 505-1731 Engine Harness As
If the engine under test is a 16 cylinder instead of a 20 cylinder, 505-1731 Engine Harness As can be installed between 489-3081 Engine Harness As and 510-4068 Electronic Control Gp.Installation of 489-3081 Engine Harness As
Perform the following procedure to install 489-3081 Engine Harness As:
Install 504-3341 Engine Harness As on the service port connector of 489-3081 Engine Harness As.
Route 504-3341 Engine Harness As to a safe location before performing tests.Note: Attach 140-9442 "Y" Adapter Cable As in order to see all the machine ECMs. Connect 504-3341 Monitor Harness As to "Y", connect other leg to Machine Service port and the third leg to Communication Adapter.Overview and Configuration On Caterpillar Electronic Technician (Cat ET)
This section will describe the overview and configuration setting on Cat ET.Cat ET Screen - Standard View
Perform the following instructions once the system is installed:
Connect to communications adapter and launch Cat ET.
Illustration 9 g06198935
After connecting, under "Available ECM(s)" select "Digital Pyrometer #1".
Illustration 10 g06199349
(9) Status button
Select the "Status" (9) button in the toolbar and then the parameters of "Digital Pyrometer #1" will appear.
Selecting "Engine Cylinder Temperature - 1"

Have questions with 106661-5580?





Group cross 106661-5580 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 628 
1671396864 
INJECTION-PUMP ASSEMBLY
PE6
F 019 Z10 625 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 629 
1671396900 
INJECTION-PUMP ASSEMBLY
PE6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 630 
1671396901 
INJECTION-PUMP ASSEMBLY
PE6
 
1671296505 
INJECTION-PUMP ASSEMBLY
PE6T05
9 400 619 764 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 831 
1671396902 
INJECTION-PUMP ASSEMBLY
PE6T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 631 
1671396911 
INJECTION-PUMP ASSEMBLY
PE6H
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 612 462 
1671396912 
INJECTION-PUMP ASSEMBLY
PE6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 612 003 
1671396962 
INJECTION-PUMP ASSEMBLY
PE6
106661-5580  
9 400 616 632 
1671396075 
INJECTION-PUMP ASSEMBLY
PE6T04
9 400 616 633 
1671496507 
INJECTION-PUMP ASSEMBLY
PE6
Back to top