106651-2080 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066512080


 

Information injection-pump assembly

ZEXEL 106651-2080 1066512080
106651-2080 INJECTION-PUMP ASSEMBLY
Rating:
25
Buy INJECTION-PUMP ASSEMBLY 106651-2080 zexel genuine, new aftermarket engine parts with delivery

Service parts 106651-2080 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106065-5241
3. GOVERNOR 105487-0710
4. SUPPLY PUMP 105207-1031
5. AUTOM. ADVANCE MECHANIS 105636-0380
6. COUPLING PLATE 105662-0710
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4982
11. Nozzle and Holder ME056146
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105031-3642
14. NOZZLE 105015-4590
15. NOZZLE SET

Include in #1:

106651-2080 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106651-2080 1066512080


Zexel num
Bosch num
Firm num
Name
106651-2080 
106651-2081 
 
  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D22T *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   5.1 5.05 5.15
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.8
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   134.4 131.4 137.4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.2+-0.5
Pump speed r/min   250 250 250
Each cylinder's injection qty mm3/st.   18.6 15.9 21.3
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.8)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   134.4 133.4 135.4
Fixing the lever   *
Boost pressure kPa   53.3 53.3
Boost pressure mmHg   400 400
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(11.8)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   133.4 129.4 137.4
Difference in delivery mm3/st.   8 8 8
Fixing the lever   *
Boost pressure kPa   53.3 53.3
Boost pressure mmHg   400 400
Injection quantity adjustment_05
Adjusting point   D
Rack position   R2(10.9)
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   110.5 106.5 114.5
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_06
Adjusting point   E
Rack position   12.5+-0. 5
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   140 120 160
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   R2(10.9)
Boost pressure kPa   12 12 12
Boost pressure mmHg   90 90 90
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   11.3
Boost pressure kPa   24 22.7 25.3
Boost pressure mmHg   180 170 190
Boost compensator adjustment_03
Pump speed r/min   600 600 600
Rack position   R1(11.8)
Boost pressure kPa   38.7 32 45.4
Boost pressure mmHg   290 240 340
Timer adjustment
Pump speed r/min   850+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   900
Advance angle deg.   0.8 0.3 1.3
Timer adjustment_03
Pump speed r/min   950
Advance angle deg.   1.7 1.2 2.2
Timer adjustment_04
Pump speed r/min   1050
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106651-2080
N:Pump speed R:Rack position (mm) (1)Beginning of damper spring operation: DL
----------
DL=5.2-0.2mm
----------

Speed control lever angle

Test data 106651-2080
F:Full speed
----------

----------
a=4deg+-5deg

0000000901

Test data 106651-2080
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=21.5deg+-5deg b=36deg+-3deg

Stop lever angle

Test data 106651-2080
N:Pump normal S:Stop the pump.
----------

----------
a=5deg+-5deg b=48deg+-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=310r/min Ra=6.2mm
----------




Information:

1. Turn the engine counterclockwise (as seen from the flywheel end of the engine) with Tool (A) until the No. 1 piston is at top center (TC) on the compression stroke. Install the timing bolt. Install 6V-2112 Timing Pin through the hole in the injection pump housing. See the topic "Finding Top Center Compression Position for NO. 1 Piston" in SENR6577 Testing & Adjusting. Tool (B), 6V-2112 Timing Pin, replaces 6V-6019 Timing Pin. 2. Remove two bolts (1).3. Remove eleven bolts (2) and cover (3). 4. Remove four bolts (5), retainer (6) and automatic timing advance (4).Install Automatic Timing Advance
1. Install automatic timing advance (4). Install retainer (6) and four bolts (5).2. Tighten the bolts (5) with fingers until there is a small amount of friction (slight drag) between the retainer and automatic timing advance (4). This friction will hold the unit against the timing gears. This prevents play (backlash) when gears are turned to the correct position.3. Remove the timing bolt. Turn the flywheel until the timing pin will go into the groove in the injection pump camshaft.4. With the timing pin installed, turn the flywheel clockwise (opposite the direction of engine rotation) a minimum of 30 degrees. The reason for this step is to be sure the play is removed from the timing gears when the engine is put on top center (TC).5. Turn the flywheel in the direction of engine rotation until the No. 1 piston of the engine is on top center compression stroke. Then turn the timing bolt into the threaded hole in the flywheel.6. Tighten bolts (5) to 25 N m (20 lb ft). Then remove the timing pin from the injection pump housing.7. Tighten bolts (5) to 135 7 N m (100 5 lb ft). Then remove the timing bolt from the flywheel.8. Turn the crankshaft two complete revolutions and check the timing again to see that timing pin will go into the groove in the injection pump camshaft with bolt in flywheel.9. If timing is not correct, do the procedure of Steps 1 through 7 again. If the timing is correct, be sure to remove the timing pin and the timing bolt. 5. Install eleven bolts (2) and cover (3).6. Install two bolts (1). Disassemble Automatic Timing Advance
Start By:a. remove automatic timing advance 1. Remove flange assembly (1). 2. Remove two springs (2) and two weights (3) from drive gear assembly (4). 3. Remove two slides (5) from pistons (6).4. Separate drive gear assembly (4) from advance sleeve (7).Assemble Automatic Timing Advance
1. Put weights (3) in position in flange assembly (1) as shown.2. Install springs (2) in flange assembly (1). 4. Use 1P-008 General Purpose Lubricant to hold slides (5) in position on drive gear assembly (4). Install slides (5) on pistons (6).5. Install advance sleeve (7) to drive gear assembly (4). 6. Install drive gear assembly (4) on flange assembly (1). Make sure slides (5) fit in grooves of the weights.End By:a. install automatic timing advance

Have questions with 106651-2080?





Group cross 106651-2080 ZEXEL

Mitsubishi-Heav 

 
0429050022 

6DK

Mitsubishi 

F 019 Z10 024 
ME056024 
INJECTION-PUMP ASSEMBLY
6D22T
 
3099573702 

6D22T
 
ME056018 

6D22T
 
3099586401 

6D22T
106651-2080  

106651-2081 
 
 
INJECTION-PUMP ASSEMBLY
6D22T
9 400 616 545 
ME056170 
INJECTION-PUMP ASSEMBLY
6D22T
 
 
INJECTION-PUMP ASSEMBLY
6D22T
 
ME056193 
INJECTION-PUMP ASSEMBLY
6D22T
Back to top