106651-2041 ZEXEL F 019 Z10 024 BOSCH INJECTION-PUMP ASSEMBLY f019z10024 1066512041 me056024


 

Information injection-pump assembly

BOSCH F 019 Z10 024 f019z10024
ZEXEL 106651-2041 1066512041
MITSUBISHI ME056024 me056024
106651-2041 INJECTION-PUMP ASSEMBLY
Rating:
21
Buy INJECTION-PUMP ASSEMBLY 106651-2041 zexel genuine, new aftermarket engine parts with delivery

Service parts 106651-2041 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106065-5202
3. GOVERNOR 105487-0560
4. SUPPLY PUMP 105207-1031
5. AUTOM. ADVANCE MECHANIS 105636-0380
6. COUPLING PLATE 105662-0710
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4982
11. Nozzle and Holder ME056146
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105031-3642
14. NOZZLE 105015-4590
15. NOZZLE SET

Include in #1:

106651-2041 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 024 f019z10024
ZEXEL 106651-2041 1066512041
MITSUBISHI ME056024 me056024


Zexel num
Bosch num
Firm num
Name
106651-2041 
F 019 Z10 024 
ME056024  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D22T * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   5.1 5.05 5.15
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.8
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   134.4 131.4 137.4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   D
Rack position   6.2+-0.5
Pump speed r/min   250 250 250
Each cylinder's injection qty mm3/st.   18.6 15.9 21.3
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.8)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   134.4 133.4 135.4
Fixing the lever   *
Boost pressure kPa   53.3 53.3
Boost pressure mmHg   400 400 400
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(11.8)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   133.4 129.4 137.4
Difference in delivery mm3/st.   8 8 8
Fixing the lever   *
Boost pressure kPa   53.3 53.3
Boost pressure mmHg   400 400 400
Injection quantity adjustment_05
Adjusting point   C
Rack position   R2(10.9)
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   110.5 106.5 114.5
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_06
Adjusting point   E
Rack position   13.1+0.5
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   140 120 160
Fixing the lever   *
Remarks
After startup boost setting
 
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   R2(10.9)
Boost pressure kPa   12 12 12
Boost pressure mmHg   90 90 90
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   11.3
Boost pressure kPa   24 22.7 25.3
Boost pressure mmHg   180 170 190
Boost compensator adjustment_03
Pump speed r/min   600 600 600
Rack position   R1(11.8)
Boost pressure kPa   38.7 32 45.4
Boost pressure mmHg   290 240 340
Timer adjustment
Pump speed r/min   850+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   900
Advance angle deg.   0.8 0.3 1.3
Timer adjustment_03
Pump speed r/min   950
Advance angle deg.   1.7 1.2 2.2
Timer adjustment_04
Pump speed r/min   1050
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106651-2041
N:Pump speed R:Rack position (mm) (1)Beginning of damper spring operation: DL (2)Excess fuel for starting setting (at solenoid operation)
----------
DL=5.2-0.2mm
----------

Speed control lever angle

Test data 106651-2041
F:Full speed
----------

----------
a=4deg+-5deg

0000000901

Test data 106651-2041
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=21.5deg+-5deg b=36deg+-3deg

Stop lever angle

Test data 106651-2041
N:Pump normal S:Stop the pump.
----------

----------
a=25deg+-5deg b=64deg+-5deg

0000001101

Test data 106651-2041
N:Normal B:When boosted
----------

----------
a=(39deg) b=(12deg)

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=310r/min Ra=6.2mm
----------




Information:

1. Disconnect air line (1) at fitting. Remove two bolts (2). Pull up and toward the front of the engine to remove the bolt of the fuel ratio from the groove (slot) in the collar for the governor. Remove fuel ratio control (3). Remove gasket from fuel ratio control.2. Install a new gasket on fuel ratio control. Install fuel ratio control (3). Make sure bolt engages with stop collar in governor control.3. Install two bolts (2). Connect air line (1) at fitting.4. Make sure the fuel ratio control is in correct adjustment. See Systems Operation Testing & Adjusting Manual for this procedure.5. Install a new governor seal.Disassemble Fuel Ratio Control
Start By:a. remove fuel ratio control 1. Remove two bolts (1) and the housing (2). 2. Remove valve assembly (3).3. Remove seal (4) and O-ring seal from valve.4. Remove the retainer (5) and two springs (6). 5. Remove three bolts (9) and cover (10).6. Remove valve (7), diaphragm (8), retainer and spring. 7. Remove pin (12) from valve (7).8. Remove cover (11) from the valve.9. Remove the seal from the cover (11).Assemble Fuel Ratio Control
1. Put clean engine oil on lip of seal. Install the seal (1) in cover (2). Install seal so lip of seal is toward the inside of the cover. 2. Install the valve (3) into cover (2).3. Install the pin that holds cover on valve. 4. Install spring (7) and the retainer (6) in cover (8).5. Install diaphragm (5) on the valve assembly (4) and in the cover. 6. Install cover and three bolts (11) that hold covers together.7. Put clean engine oil on seal and ring seal. Install the seals (10) on valve.8. Install the two springs (13), retainer and valve assembly (12).9. Install housing (9) and two bolts.
Correct adjustment must be made to fuel ratio control before installation. See Systems Operation Testing & Adjusting for this procedure.
End By:a. install fuel ratio control

Have questions with 106651-2041?





Group cross 106651-2041 ZEXEL

Mitsubishi-Heav 

 
0429050022 

6DK

Mitsubishi 

106651-2041  
F 019 Z10 024 
ME056024 
INJECTION-PUMP ASSEMBLY
6D22T
 
3099573702 

6D22T
 
ME056018 

6D22T
 
3099586401 

6D22T
 
 
INJECTION-PUMP ASSEMBLY
6D22T
9 400 616 545 
ME056170 
INJECTION-PUMP ASSEMBLY
6D22T
 
 
INJECTION-PUMP ASSEMBLY
6D22T
 
ME056193 
INJECTION-PUMP ASSEMBLY
6D22T
Back to top