106651-0620 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066510620


 

Information injection-pump assembly

ZEXEL 106651-0620 1066510620
106651-0620 INJECTION-PUMP ASSEMBLY
Rating:
10
Buy INJECTION-PUMP ASSEMBLY 106651-0620 zexel genuine, new aftermarket engine parts with delivery

Service parts 106651-0620 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106065-1250
3. GOVERNOR 105407-3530
4. SUPPLY PUMP 105217-1730
5. AUTOM. ADVANCE MECHANIS 105614-0730
6. COUPLING PLATE 105662-0761
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4050
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105031-4270
14. NOZZLE 105015-2780
15. NOZZLE SET

Include in #1:

106651-0620 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106651-0620 1066510620


Zexel num
Bosch num
Firm num
Name
106651-0620 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.65 3.6 3.7
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11
Pump speed r/min   750 750 750
Average injection quantity mm3/st.   108.6 107.6 109.6
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   9.6
Pump speed r/min   750 750 750
Average injection quantity mm3/st.   81 79.5 82.5
Max. variation between cylinders %   0 -4 4
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   7+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   15 13.9 16.1
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Timer adjustment
Pump speed r/min   500
Remarks
Measure the actual advance angle.
 
Timer adjustment_02
Pump speed r/min   700
Remarks
Measure the actual advance angle.
 
Timer adjustment_03
Pump speed r/min   900
Remarks
Measure the actual advance angle.
 
Timer adjustment_04
Pump speed r/min   -
Advance angle deg.   2.5 1.9 2.7
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 106651-0620
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Idle sub spring setting: L1.
----------
K=15 L1=7-0.5mm
----------

Speed control lever angle

Test data 106651-0620
F:Full speed I:Idle S:Stop (1)Speed set at aa (setting at shipping) (2)Set the pump speed at bb.
----------
aa=900r/min bb=750r/min
----------
a=25deg+-5deg b=9deg+-5deg c=32deg+-3deg d=7deg+-5deg

Stop lever angle

Test data 106651-0620
N:Pump normal S:Stop the pump.
----------

----------
a=26deg+-5deg b=53deg+-5deg

0000001501 GOV FULL LOAD ADJUSTMENT

Test data 106651-0620
Title1:Full load stopper adjustment Title2:Governor set speed LABEL1:Distinguishing LABEL2:Pump speed (r/min) LABEL3:Ave. injection quantity (mm3/st) LABEL4:Max. var. bet. cyl. LABEL5:Remarks LABEL6:Distinguishing LABEL7:Governor set speed (r/min) LABEL8:Remarks (1)Adjustment conditions are the same as those for measuring injection quantity. (2)-
----------

----------
a1=A a2=E r1=750r/min r2=750r/min Q1=108.6+-1mm3/st Q2=- c1=+-2.5% c2=+-2.5% a3=18 a4=15 r3=900r/min r4=750r/min




Information:

Start By:a. remove valve covers1. Turn the flywheel with Tool (C) until there is clearance between the rocker arms and valve bridges. 2. Engage Tool (A) with the rocker arm, and move Tool (A) against the valve spring force until push rod (1) can be removed.3. Remove the other push rod for the same cylinder. Mark each push rod so it can be installed in its original position. 4. Use Tool (B) to remove valve lifter (2).5. Remove the other valve lifter for the same cylinder. Mark each valve lifter so it can be installed in its original position. 6. Remove spring (3) from lifter (2).7. Inspect spring (3). See Guideline For Reusable Parts, SEBF8066. 8. Identify the location of each valve bridge (4), then remove them.Install Push Rods, Valve Lifters & Valve Bridges
1. Put clean engine oil on each bridge dowel and the bore of each bridge. Install bridges (1) in their original position.2. Use the following procedure to adjust the valve bridges.a. Put clean SAE 30 Engine Oil in the lubrication passage of the bridge.b. Press straight down on the top contact surface of the bridge with a force of 4.45 to 44.50 N (1 to 10 lb).c. Turn the adjusting screw clockwise until the oil film in the lubrication passage of the bridge moves inward.d. Turn the adjusting screw an additional 20 to 30 degrees (1/3 to 1/2 of a flat on the hex nut).e. Hold the adjusting screw in position, and tighten the locknut to a torque of 26 to 34 N m (19 to 25 lb ft).f. Do this procedure for both bridges. Put clean engine oil on the top contact surface of both bridges. 3. Install spring (3) on valve lifter (2). 4. Fasten Tool (A) to valve lifter (2).5. Immerse valve lifter (2) in clean engine oil; then install it in its original position.6. Install the other valve lifter for the same cylinder. 7. Engage Tool (B) with the rocker arm, and move Tool (B) against the valve spring force until push rods (4) can be installed in their original position.8. Use Tool (C) to turn the flywheel so the remaining push rods can be installed. Be sure there is clearance at the rocker arms and valve bridges before compressing the valve pump.9. Check the valve clearance settings. The clearance for the intake valves is 0.38 mm (.015 in). The clearance for the exhaust valve is 0.76 mm (.030 in). See the topic "Valve Clearance Setting" in Testing & Adjusting.End By:a. install valve covers

Have questions with 106651-0620?





Group cross 106651-0620 ZEXEL

Nissan-Diesel 

 
1671396071 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 542 
1671296003 
INJECTION-PUMP ASSEMBLY
PD605
106651-0620  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671296005 
INJECTION-PUMP ASSEMBLY
PD605
9 400 610 826 
1671396073 
INJECTION-PUMP ASSEMBLY
PD6
F 019 Z20 400 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671596004 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396074 
INJECTION-PUMP ASSEMBLY
PD6
9 400 616 543 
1671296504 
INJECTION-PUMP ASSEMBLY
PE6H05
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 544 
1670096667 
INJECTION-PUMP ASSEMBLY
PE6
Back to top