106651-0450 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066510450


 

Information injection-pump assembly

ZEXEL 106651-0450 1066510450
106651-0450 INJECTION-PUMP ASSEMBLY
Rating:
56
Buy INJECTION-PUMP ASSEMBLY 106651-0450 zexel genuine, new aftermarket engine parts with delivery

Service parts 106651-0450 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106065-1020
3. GOVERNOR 105408-0210
4. SUPPLY PUMP 105217-4000
5. AUTOM. ADVANCE MECHANIS 105614-0350
6. COUPLING PLATE 105662-0680
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4050
11. Nozzle and Holder 16600-96001
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4270
14. NOZZLE 105015-2780
15. NOZZLE SET

Include in #1:

106651-0450 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106651-0450 1066510450


Zexel num
Bosch num
Firm num
Name
106651-0450 
106651-0452 
 
  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
PD6 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.65 3.6 3.7
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.2
Pump speed r/min   750 750 750
Average injection quantity mm3/st.   101.8 100.8 102.8
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   11.2
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   106.2 103.2 109.2
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   7.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   15 13.3 16.7
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Timer adjustment
Pump speed r/min   300+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   500
Advance angle deg.   1.35 0.7 1.6
Timer adjustment_03
Pump speed r/min   700
Advance angle deg.   2.85 2.1 3.1
Timer adjustment_04
Pump speed r/min   900
Advance angle deg.   4.4 3.6 4.6
Timer adjustment_05
Pump speed r/min   1150+50
Advance angle deg.   6.1 5.7 6.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106651-0450
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK LIMIT: RAL
----------
K=16 RAL=11.5+-0.1mm
----------

Speed control lever angle

Test data 106651-0450
F:Full speed I:Idle S:Stop
----------

----------
a=11deg+-5deg b=32deg+-3deg c=25deg+-5deg

Stop lever angle

Test data 106651-0450
N:Pump normal S:Stop the pump.
----------

----------
a=4deg+-5deg b=53deg+-5deg




Information:

1. Remove nuts (1), cover (2), and the gasket. 2. Put No. 1 piston at the top center compression position (TC) with the following procedure:a. Remove plug (3), two bolts and cover (2) from the flywheel housing. b. Install Tool (B) in the flywheel housing. Use Tool (B) to slowly rotate the engine in the direction of normal rotation, (counterclockwise as seen from the flywheel end of the engine), until timing bolt (4) can be installed in the flywheel housing and into the hole in the flywheel. c. Remove the valve cover from the valve cover base. Check to see if both rocker arms (5) for the No. 1 cylinder can be moved backward and forward. The No. 1 piston is at the top center compression position (TC) when the timing bolt is installed in the flywheel and both rocker arms for the No. 1 cylinder can be moved backward and forward. If both rocker arms cannot be moved, the No. 1 piston is not at the top center compression position (TC). Remove the timing bolt from the flywheel and rotate the engine in the direction for normal rotation, (counterclockwise as seen from the flywheel end of the engine one full turn 360 degrees, and install the timing bolt again.3. Remove the timing bolt, and use Tool (B) to rotate the engine in the opposite direction of normal rotation (clockwise as seen from the flywheel end of the engine) a minimum of 30 degrees. The timing is correct if Tool (A) and the timing bolt can be installed at the same time. The timing procedure in the Testing & Adjustment Manual must be done again if the timing bolt and Tool (A) can not be installed at the same time.4. Remove the plug from the timing pin hole in the fuel injection pump housing. Install Tool (A) in the timing pin hole. 5. Remove eight bolts (6) and automatic timing advance (7). 6. Remove gear (9) from fuel injection pump camshaft (8).The following steps are for the installation procedure.7. Install gear (9) on fuel injection pump camshaft (8). 8. Install two 3/8 in 16 NC x 6 in (152.4 mm) long guide bolts (10). Space the guide bolts evenly.
There is a light spring located beneath the flyweight cover (12). Hold cover (12) while removing last nut (11). Slowly remove flyweight cover (12) to avoid dropping the spring.
9. Remove four nuts (11) and remove flyweight cover (12). 10. Put automatic timing advance (13) in position on the fuel injection pump camshaft, and install four bolts (14). Tighten bolts (14) just past finger tight. Remove guide bolts (15). 11. Install four nuts (16). Install Tool (C). 12. Tighten four knurled nuts (17) finger tight.
Do not use any tools to tighten the knurled nuts.
13. Install all mounting bolts (14) and tighten to 55 10 N m (41 7 lb ft).14. Loosen knurled nuts (17). Remove four nuts (16) and remove Tool (C).15. Install the spring and flyweight cover

Have questions with 106651-0450?





Group cross 106651-0450 ZEXEL

Nissan-Diesel 

 
1670096519 
INJECTION-PUMP ASSEMBLY
PE6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1670096601 
INJECTION-PUMP ASSEMBLY
PE6
 
1671396519 
INJECTION-PUMP ASSEMBLY
PE6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 612 754 
1671396600 
INJECTION-PUMP ASSEMBLY
PE6
 
 
INJECTION-PUMP ASSEMBLY
PD6
 
1679096004 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY
PD604
9 400 610 825 
1671396062 
INJECTION-PUMP ASSEMBLY
PD604
 
 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 536 
1671396061 
INJECTION-PUMP ASSEMBLY
PD6
106651-0450  

106651-0452 
 
 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671596002 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096563 
INJECTION-PUMP ASSEMBLY
PE6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 537 
1670096607 
INJECTION-PUMP ASSEMBLY
PE6
 
1670096061 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 538 
1670096070 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY
PD605
 
1671296001 
INJECTION-PUMP ASSEMBLY
PD605
 
 
INJECTION-PUMP ASSEMBLY
PD606
 
1679096008 
INJECTION-PUMP ASSEMBLY
PD606
Back to top