106651-0362 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066510362


 

Information injection-pump assembly

ZEXEL 106651-0362 1066510362
106651-0362 INJECTION-PUMP ASSEMBLY
Rating:
33
Buy INJECTION-PUMP ASSEMBLY 106651-0362 zexel genuine, new aftermarket engine parts with delivery

Service parts 106651-0362 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106065-1081
3. GOVERNOR 105306-0601
4. SUPPLY PUMP 105217-1730
5. AUTOM. ADVANCE MECHANIS 105614-4210
6. COUPLING PLATE 105662-0761
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4500
11. Nozzle and Holder 1660096501
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105031-4370
14. NOZZLE 105015-4090
15. NOZZLE SET

Include in #1:

106651-0362 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106651-0362 
 
   
INJECTION-PUMP ASSEMBLY




Information:

2. Remove three nuts and washers (1).3. Move Peec unit (2) out of the way. (If so equipped). 4. Remove elbows (5) and pipes (7).5. Remove fuel line brackets (4).6. Remove bolts (6). Remove cover (3). 7. Remove elbows (10). Remove adapters (8) and adapters (9) from the aftercooler core. Remove bolts (11). 8. Move aftercooler core (12) toward the front of the engine and use two people to remove the aftercooler core from the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). Remove the O-ring seals from the aftercooler core extensions.Install Aftercooler
1. Install O-ring seals (13) on the aftercooler core extensions. Put clean engine oil or glycerin on the seals.2. Use two people to put aftercooler core (12) into position in the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). 3. Install bolts (11). Put clean engine oil or glycerin on O-ring seal (14) and in bores (15) and (16). 4. Put clean engine oil or glycerin on O-ring seals (17) and adapters (8) and (9). Install adapters (8) and (9) in the aftercooler core. 5. Install elbows (10). 6. Put cover (3) into position on the engine. Install bolts (6).7. Install fuel injection line brackets (4). Tighten bolts (20) to a torque of 4.5 1.1 N m (40 10 lb in).8. Put clean engine oil or glycerin on pipes (7). Install pipes (7) and elbows (5).9. Fill the cooling system with coolant. See Operation & Maintenance Manual for the proper procedure and levels.

Have questions with 106651-0362?





Group cross 106651-0362 ZEXEL

Nissan-Diesel 

 
1671396101 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671796006 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396105 

PD6
 
1671396107 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096110 

PD6
 
1670096112 
INJECTION-PUMP ASSEMBLY
PD6
9 400 616 535 
1670096068 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096516 
INJECTION-PUMP ASSEMBLY
PE6
106651-0362  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 611 836 
1670096602 
INJECTION-PUMP ASSEMBLY
PE6
 
1671396518 
INJECTION-PUMP ASSEMBLY
PE6
 
1671396601 
INJECTION-PUMP ASSEMBLY
PE6
 
1670096518 
INJECTION-PUMP ASSEMBLY
PE6
 
1670096606 
INJECTION-PUMP ASSEMBLY
PE6
 
1670096618 
INJECTION-PUMP ASSEMBLY
PE6
 
1670096021 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1670096063 
INJECTION-PUMP ASSEMBLY
PD6
Back to top