Information injection-pump assembly
BOSCH
9 400 610 823
9400610823
ZEXEL
106651-0262
1066510262
NISSAN-DIESEL
1671396063
1671396063

Rating:
Service parts 106651-0262 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
16600-96003
12.
Open Pre:MPa(Kqf/cm2)
22.6{230}
15.
NOZZLE SET
Include in #1:
106651-0262
as INJECTION-PUMP ASSEMBLY
Cross reference number
Zexel num
Bosch num
Firm num
Name
106651-0262
9 400 610 823
1671396063 NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
PD6 * K 14CA INJECTION PUMP ASSY PE6P,6PD PE
PD6 * K 14CA INJECTION PUMP ASSY PE6P,6PD PE
Information:
Start By:a. remove valve covers
Do not let the tops of the fuel injection nozzles turn when the fuel lines are loosened. The nozzles will be damaged if the top of the nozzles turn in the body.
1. Use Tooling (A) to loosen the nuts on the fuel injection line.2. Remove fuel injection lines (1).3. Disconnect fuel injection line nut (2) from head adapter nut (3).4. Remove adapter nut (3) and the O-ring seal. 5. Remove four bolts (4) that hold rocker arm assembly (5), and remove rocker arm assembly (5).Install Rocker Shaft Assemblies
1. Check the adjustment of the valve bridges. See the topic "Install Push Rods, Valve Lifters & Valve Bridges" in this module. 2. Loosen all the rocker arm adjusting screws on rocker shaft assembly (5).3. Install rocker shaft assembly (5).4. Clean the bolts that hold the rocker shaft assembly. Put 2P-2506 Thread Lubricant on the bolt threads, and install them.5. Be sure the rocker arms and push rods are in alignment before the rocker shaft assembly bolts are tightened.6. Tighten the rocker shaft bolts in the following sequence.a. Tighten bolts (1) through (4) in numerical sequence to a torque of 280 27 N m (210 20 lb ft).b. Tighten bolts (1) through (4) in numerical sequence to a torque of 440 20 N m (320 15 lb ft).c. Tighten bolts (1) through (4) in numerical sequence again to a final torque of 440 20 N m (320 15 lb ft). 7. Install a new O-ring seal on head adapter (7), and put clean engine oil on it.8. Put fuel injection line (8) in position, but do not tighten the nuts.9. Install adapters (7), and connect fuel injection lines (8).10. Connect fuel injection lines (6) to adapters (7).
Do not let the tops of the fuel injection nozzles turn when the fuel lines are tightened. The nozzles will be damaged if the top of the nozzles turn in the body.
11. Use Tooling (A) to tighten the fuel injection line nuts to a torque of 41 7 N m (30 5 lb ft).12. Adjust the valve clearance settings. The clearance for the intake valve is 0.38 mm (.015 in). The clearance for the exhaust valves is 0.76 mm (.030 in). See the topic "Valve Clearance Setting" in Testing & Adjusting.End By:a. install valve coversDisassemble Rocker Shaft Assemblies
Start By:a. remove rocker shaft assemblies 1. Remove retainer (1) from the end of the shaft.2. Remove the washers and rocker arm (2). 3. Use Tool (A) to remove the pin that holds bracket (3) to the rocker arm shaft.4. Remove bracket (3), rocker arm (4) and the spring.5. Remove the remainder of the rocker arms. The center brackets do not have pins.Assemble Rocker Shaft Assemblies
Make sure all parts of the rocker shaft assembly are clean before assembly. 1. Put clean engine oil on shaft (3).2. Install the center springs, rocker arms and bracket.3. Install spring (1), rocker arm (4) and bracket (2).4. Put tape
Do not let the tops of the fuel injection nozzles turn when the fuel lines are loosened. The nozzles will be damaged if the top of the nozzles turn in the body.
1. Use Tooling (A) to loosen the nuts on the fuel injection line.2. Remove fuel injection lines (1).3. Disconnect fuel injection line nut (2) from head adapter nut (3).4. Remove adapter nut (3) and the O-ring seal. 5. Remove four bolts (4) that hold rocker arm assembly (5), and remove rocker arm assembly (5).Install Rocker Shaft Assemblies
1. Check the adjustment of the valve bridges. See the topic "Install Push Rods, Valve Lifters & Valve Bridges" in this module. 2. Loosen all the rocker arm adjusting screws on rocker shaft assembly (5).3. Install rocker shaft assembly (5).4. Clean the bolts that hold the rocker shaft assembly. Put 2P-2506 Thread Lubricant on the bolt threads, and install them.5. Be sure the rocker arms and push rods are in alignment before the rocker shaft assembly bolts are tightened.6. Tighten the rocker shaft bolts in the following sequence.a. Tighten bolts (1) through (4) in numerical sequence to a torque of 280 27 N m (210 20 lb ft).b. Tighten bolts (1) through (4) in numerical sequence to a torque of 440 20 N m (320 15 lb ft).c. Tighten bolts (1) through (4) in numerical sequence again to a final torque of 440 20 N m (320 15 lb ft). 7. Install a new O-ring seal on head adapter (7), and put clean engine oil on it.8. Put fuel injection line (8) in position, but do not tighten the nuts.9. Install adapters (7), and connect fuel injection lines (8).10. Connect fuel injection lines (6) to adapters (7).
Do not let the tops of the fuel injection nozzles turn when the fuel lines are tightened. The nozzles will be damaged if the top of the nozzles turn in the body.
11. Use Tooling (A) to tighten the fuel injection line nuts to a torque of 41 7 N m (30 5 lb ft).12. Adjust the valve clearance settings. The clearance for the intake valve is 0.38 mm (.015 in). The clearance for the exhaust valves is 0.76 mm (.030 in). See the topic "Valve Clearance Setting" in Testing & Adjusting.End By:a. install valve coversDisassemble Rocker Shaft Assemblies
Start By:a. remove rocker shaft assemblies 1. Remove retainer (1) from the end of the shaft.2. Remove the washers and rocker arm (2). 3. Use Tool (A) to remove the pin that holds bracket (3) to the rocker arm shaft.4. Remove bracket (3), rocker arm (4) and the spring.5. Remove the remainder of the rocker arms. The center brackets do not have pins.Assemble Rocker Shaft Assemblies
Make sure all parts of the rocker shaft assembly are clean before assembly. 1. Put clean engine oil on shaft (3).2. Install the center springs, rocker arms and bracket.3. Install spring (1), rocker arm (4) and bracket (2).4. Put tape
Have questions with 106651-0262?
Group cross 106651-0262 ZEXEL
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
106651-0262
9 400 610 823
1671396063
INJECTION-PUMP ASSEMBLY
PD6
PD6