106651-0261 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066510261


 

Information injection-pump assembly

ZEXEL 106651-0261 1066510261
106651-0261 INJECTION-PUMP ASSEMBLY
Rating:
16
Buy INJECTION-PUMP ASSEMBLY 106651-0261 zexel genuine, new aftermarket engine parts with delivery

Service parts 106651-0261 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106065-1250
3. GOVERNOR 105427-0110
4. SUPPLY PUMP 105217-6010
5. AUTOM. ADVANCE MECHANIS 105614-0350
6. COUPLING PLATE 105662-0761
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4500
11. Nozzle and Holder 16600-96501
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4370
14. NOZZLE 105015-4090
15. NOZZLE SET

Include in #1:

106651-0261 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106651-0261 
 
   
INJECTION-PUMP ASSEMBLY




Information:

Start By:a. remove valve covers1. Turn the flywheel with Tool (C) until there is clearance between the rocker arms and valve bridges. 2. Engage Tool (A) with the rocker arm, and move Tool (A) against the valve spring force until push rod (1) can be removed.3. Remove the other push rod for the same cylinder. Mark each push rod so it can be installed in its original position. 4. Use Tool (B) to remove valve lifter (2).5. Remove the other valve lifter for the same cylinder. Mark each valve lifter so it can be installed in its original position. 6. Remove spring (3) from lifter (2).7. Inspect spring (3). See Guideline For Reusable Parts, SEBF8066. 8. Identify the location of each valve bridge (4), then remove them.Install Push Rods, Valve Lifters & Valve Bridges
1. Put clean engine oil on each bridge dowel and the bore of each bridge. Install bridges (1) in their original position.2. Use the following procedure to adjust the valve bridges.a. Put clean SAE 30 Engine Oil in the lubrication passage of the bridge.b. Press straight down on the top contact surface of the bridge with a force of 4.45 to 44.50 N (1 to 10 lb).c. Turn the adjusting screw clockwise until the oil film in the lubrication passage of the bridge moves inward.d. Turn the adjusting screw an additional 20 to 30 degrees (1/3 to 1/2 of a flat on the hex nut).e. Hold the adjusting screw in position, and tighten the locknut to a torque of 26 to 34 N m (19 to 25 lb ft).f. Do this procedure for both bridges. Put clean engine oil on the top contact surface of both bridges. 3. Install spring (3) on valve lifter (2). 4. Fasten Tool (A) to valve lifter (2).5. Immerse valve lifter (2) in clean engine oil; then install it in its original position.6. Install the other valve lifter for the same cylinder. 7. Engage Tool (B) with the rocker arm, and move Tool (B) against the valve spring force until push rods (4) can be installed in their original position.8. Use Tool (C) to turn the flywheel so the remaining push rods can be installed. Be sure there is clearance at the rocker arms and valve bridges before compressing the valve pump.9. Check the valve clearance settings. The clearance for the intake valves is 0.38 mm (.015 in). The clearance for the exhaust valve is 0.76 mm (.030 in). See the topic "Valve Clearance Setting" in Testing & Adjusting.End By:a. install valve covers

Have questions with 106651-0261?





Group cross 106651-0261 ZEXEL

Nissan-Diesel 

 
1670096020 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096017 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096018 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 533 
1670096069 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096104 
INJECTION-PUMP ASSEMBLY
PD6
F 019 Z10 621 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 534 
1670096064 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396017 
INJECTION-PUMP ASSEMBLY
PD6
106651-0261  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 823 
1671396063 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396018 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396019 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 824 
1671396064 
INJECTION-PUMP ASSEMBLY
PD6
 
 

PD6
Back to top