106651-0252 ZEXEL F 019 Z10 621 BOSCH INJECTION-PUMP ASSEMBLY f019z10621 1066510252


 

Information injection-pump assembly

BOSCH F 019 Z10 621 f019z10621
ZEXEL 106651-0252 1066510252
106651-0252 INJECTION-PUMP ASSEMBLY
Rating:
13
Buy INJECTION-PUMP ASSEMBLY 106651-0252 zexel genuine, new aftermarket engine parts with delivery

Service parts 106651-0252 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106065-1250
3. GOVERNOR 105306-0381
4. SUPPLY PUMP 105217-1730
5. AUTOM. ADVANCE MECHANIS 105614-0350
6. COUPLING PLATE 105662-0761
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4050
11. Nozzle and Holder 1660096001
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105031-4270
14. NOZZLE 105015-2780
15. NOZZLE SET

Include in #1:

106651-0252 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106651-0252 
106651-0253 
F 019 Z10 621 
   
INJECTION-PUMP ASSEMBLY
* K




Information:

Start By:a. remove automatic timing advanceb. remove oil panc. remove water pumpd. remove crankshaft front seal and wear sleeve 1. Disconnect clip (1) for the wiring harness.2. Remove connector (2) from the clip. 3. Fasten Tooling (A) and a hoist to the timing gear cover. The weight of the timing gear cover is 18 kg (40 lb).4. Use Tooling (B) to remove studs (3).5. Move fuel overflow tube (4) out of the way.6. Remove cover (5) and the gasket.7. Disconnect all wiring harness clips from the timing gear housing, and move the wiring harness out of the way.8. Remove the bolts that hold the timing gear cover to the cylinder block, and remove the timing gear cover.9. Remove the gasket for the timing gear cover.10. Thoroughly clean the gasket surface of the cylinder block and the timing gear cover. Be careful not to scratch or mar the gasket surface of the aluminum timing gear cover.Install Timing Gear Cover
1. Install new O-ring seal (1) on the fuel injection pump housing. Put clean engine oil on the O-ring seal.2. Put new gasket (2) in position on the cylinder block. Engage the gasket with the two dowels. Use clean 2S-3230 Bearing Lubricant to hold the gasket in place on the cylinder block. 3. Put the timing gear cover in position on the dowels. Install the bolts that hold the timing gear cover to the cylinder block.4. Install cover (6), and a new gasket.5. Connect the wiring harness clips to the timing gear housing.6. Connect the clip that holds fuel overflow tube (5).7. Use Tooling (B) to install studs (3).8. Remove Tooling (A).9. Put 5P-3413 Pipe Sealant with "Teflon" on the threads of stud (4). Use Tool (B) to install stud (4) to a height of 28.96 mm (1.140 in).10. Install the clip that holds the wiring harness.11. Install the connector in the clip.12. Trim gasket (2) even with the oil pan surface of the cylinder block and timing gear cover.End By:a. install crankshaft front seal and wear sleeveb. install water pumpc. install oil pand. install automatic timing advance

Have questions with 106651-0252?





Group cross 106651-0252 ZEXEL

Nissan-Diesel 

 
1670096020 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096017 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096018 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 533 
1670096069 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096104 
INJECTION-PUMP ASSEMBLY
PD6
106651-0252  

106651-0253 
F 019 Z10 621 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 534 
1670096064 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396017 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 823 
1671396063 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396018 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396019 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 824 
1671396064 
INJECTION-PUMP ASSEMBLY
PD6
 
 

PD6
Back to top