106651-0022 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066510022


 

Information injection-pump assembly

ZEXEL 106651-0022 1066510022
106651-0022 INJECTION-PUMP ASSEMBLY
Rating:
85
Buy INJECTION-PUMP ASSEMBLY 106651-0022 zexel genuine, new aftermarket engine parts with delivery

Service parts 106651-0022 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106065-1250
3. GOVERNOR 105306-0071
4. SUPPLY PUMP 105217-6010
5. AUTOM. ADVANCE MECHANIS 105614-0350
6. COUPLING PLATE 105662-0761
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4050
11. Nozzle and Holder 16600-96001
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4270
14. NOZZLE 105015-2780
15. NOZZLE SET

Include in #1:

106651-0022 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106651-0022 
 
   
INJECTION-PUMP ASSEMBLY




Information:

1. Remove bolts (1) and the washers that hold rocker shaft assembly (2) in position.2. Remove rocker shaft assembly (2). Remove the O-ring seal from the rear rocker arm support bracket.3. Put identification marks on push rods (3) as to their location in the engine. Remove the push rods.Install Rocker Shaft Assembly & Push Rods
1. Install push rods (1). Make sure they are in their original location in the engine and in position in the valve lifters.
Loosen the adjusting screws on the rocker arms. This will prevent a bent valve or push rod during installation of the rocker shaft assembly.
2. Install a new O-ring seal in the rear rocker arm support bracket. Put 2P2506 Thread Lubricant on all of the bolts that hold the rocker shaft assembly in position except for the bolt that goes through the rear rocker arm support bracket.3. Put rocker shaft assembly (2) in position on the engine. Make sure the dowels in the support bracket are in alignment with the dowel holes in the cylinder head. Make sure the rocker arms are engaged with the push rods.4. Install the bolts and washers that hold the rocker shaft assembly in position. Tighten them until they are finger tight.
3304 Engine Sequence
3306 Engine Sequence5. Tighten the bolts that hold the rocker shaft as follows:a. Tighten the bolts in number sequence to a torque of 156 N m (115 lb ft).b. Tighten the bolts in number sequence to a torque of 250 17 N m (185 13 lb ft).c. Tighten the bolts again in number sequence to a torque of 250 17 N m (185 13 lb ft).6. See "Valve Clearance Setting" in Testing & Adjusting. Make an adjustment to the valves so the intake valves have 0.38 mm (.015 in) clearance and the exhaust valves have 0.64 mm (.025 in) clearance. Tighten the locknuts for the adjusting screws to a torque of 29 7 N m (21 5 lb ft).End By:a. install valve cover

Have questions with 106651-0022?





Group cross 106651-0022 ZEXEL

Nissan-Diesel 

 
1670096007 
INJECTION-PUMP ASSEMBLY
PD6
9 400 610 135 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 532 
1670096015 
INJECTION-PUMP ASSEMBLY
PD6
 
1670096016 
INJECTION-PUMP ASSEMBLY
PD6
106651-0022  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 611 617 
1670096062 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671396008 
INJECTION-PUMP ASSEMBLY
PD6
 
1679096000 

PD6
 
1671596000 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY
PD6
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671796001 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396006 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396011 
INJECTION-PUMP ASSEMBLY
PD6
 
1671396010 
INJECTION-PUMP ASSEMBLY
PD6
Back to top