104769-2240 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1047692240


 

Information injection-pump assembly

ZEXEL 104769-2240 1047692240
104769-2240 INJECTION-PUMP ASSEMBLY
Rating:
10
Buy INJECTION-PUMP ASSEMBLY 104769-2240 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
104769-2240 
 
   
INJECTION-PUMP ASSEMBLY




Information:

Start By:a. remove exhaust manifoldsb. remove push rods and valve liftersc. remove water temperature regulators Put protection caps on all fuel openings. 1. Remove the bolts and valve cover base (1) from the cylinder head assembly.2. Disconnect hose (2) from the cylinder head assembly. 3. Put identification marks on wires (3), and disconnect them from the sending unit. 4. Remove six head bolts (4), and install Tooling (A). 5. Fasten a hoist to Tooling (A), and remove the remainder of the bolts that fasten the head assembly.6. Remove cylinder head assembly (5). The weight of the head assembly is 102 kg (224 lb). A new spacer plate gasket must be installed when the cylinder head is removed. See Remove & Install Spacer Plate.Install Cylinder Head Assemblies
1. Thoroughly clean the spacer plates and bottom surface of the cylinder head assemblies. Install a new head gasket and seals. Do not use any adhesives. A new spacer plate gasket must be installed when the cylinder head assembly is removed. See Remove And Install Spacer Plate. 2. Fasten Tooling (A) to the cylinder head assembly, and put cylinder head assembly (1) into position on the spacer plate. The use of guide bolts will help put the cylinder head assembly in alignment with the spacer plate.
(1) Large bolts (3/4 in). Put 6V-4876 Molycoat Paste Lubricant on the threads and between washer and underside of the cylinder head bolts. (2) Small bolts (3/8 in). See Step 3h.3. Install cylinder head bolts and washers. Tighten the bolts in the following sequence:a. Tighten bolts 1 through 10 in number sequence to 270 25 N m (200 20 lb ft)b. Tighten bolts 1 through 10 in number sequence to 470 20 N m (345 15 lb ft)c. Tighten bolts 1 through 10 in number sequence again to 470 20 N m (345 15 lb ft).d. Install the rocker arm shafts for the engine valves.e. Tighten bolts 11 through 18 in number sequence to 270 25 N m (200 20 lb ft).f. Tighten bolts 11 through 18 in number sequence to 450 20 N m (330 15 lb ft).g. Tighten bolts 11 through 18 in number sequence again to 450 20 N m (330 15 lb ft).h. Tighten the nine small bolts (2) to 45 7 N m (33 5 lb ft). 4. Connect hose (3) and the wire assembly to the cylinder head. 5. Install valve cover base (2) to the cylinder head. Tighten the bolts to a torque of 14 4 N m (10 3 lb ft) and the sequence as shown.End By:a. install water temperature regulatorsb. install push rods and valve liftersc. install exhaust manifolds

Have questions with 104769-2240?





Group cross 104769-2240 ZEXEL

Nissan 

9 460 614 772 
167000Y800 
INJECTION-PUMP ASSEMBLY
RD28-T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 460 611 196 
 
INJECTION-PUMP ASSEMBLY
9 460 610 968 
 
INJECTION-PUMP ASSEMBLY
9 460 610 969 
 
INJECTION-PUMP ASSEMBLY
9 460 611 151 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 611 323 
167000Y810 
INJECTION-PUMP ASSEMBLY
RD28T
9 460 612 010 
167000Y200 
INJECTION-PUMP ASSEMBLY
RD28-T
104769-2240  
 
 
INJECTION-PUMP ASSEMBLY
9 460 610 851 
 
INJECTION-PUMP ASSEMBLY
9 460 610 720 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 611 162 
1670022J22 
INJECTION-PUMP ASSEMBLY
RD28-T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 460 611 197 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 460 611 394 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 611 324 
167000Y815 
INJECTION-PUMP ASSEMBLY
RD28T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 460 611 198 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 611 325 
167000Y820 
INJECTION-PUMP ASSEMBLY
RD28T
Back to top