104748-0502 ZEXEL 9 460 614 629 BOSCH INJECTION-PUMP ASSEMBLY 9460614629 1047480502 r2f913800


 

Information injection-pump assembly

BOSCH 9 460 614 629 9460614629
ZEXEL 104748-0502 1047480502
MAZDA R2F913800 r2f913800
104748-0502 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 104748-0502 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
104748-0502 
9 460 614 629 
R2F913800  MAZDA
INJECTION-PUMP ASSEMBLY
R2 K




Information:

2. Turn the crankshaft until two pistons are at bottom center.3. Remove nuts (1) and the bearing caps. Push the rods and pistons up until the rings are out of the cylinder liners. 4. Remove pistons (2) and connecting rods from the cylinder liners.5. Do Steps 1 through 4 for the remainder of the pistons and connecting rods.Install Pistons And Connecting Rod Assemblies
1. Put clean engine oil on piston rings, connecting rod bearings and cylinder liners. 2. Use tool (A), and install piston (2) and the connecting rod in the cylinder liner. Be sure the number on the tab groove side of the connecting rod is on the opposite side from the camshaft.3. Install the bearing cap on the connecting rod with the number on the side of the bearing cap on the same side and same number as on the connecting rod.4a. For connecting rods with bolts and nuts, use the following torque procedure: Apply clean engine oil to the bolt threads, nuts, and seating faces of the bearing cap. Tighten each nut to a torque of 80 5 N m (60 4 lb.ft.). Tighten each nut an additional 120° 5°.4b. For connecting rods with only bolts, use the following torque procedure: Apply Molylube to the threads of the bolts and to the seating faces of the bearing cap and the bolt. Tighten each bolt to a torque of 90 8 N m (66 6 lb.ft.). Tighten each bolt an additional 90° 5°.5. Do Steps 1 through 4 for the remainder of the pistons and connecting rods.End By:a. install oil pumpb. install cylinder head assembly.Disassemble And Assemble Pistons And Connecting Rod Assemblies
Start By:a. remove pistons and connecting rod assemblies 1. Remove bearings (3) from the connecting rod and connecting rod cap.2. Remove retainer ring (1) and tool (A).3. Remove pin (2) and connecting rod (4) from the piston. 4. Remove piston rings (5) from the piston with tool (B). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See, Use Of Piston Pin Bearing Removal And Installation Tools, Special Instructions, Form No. SMHS7295.5. Heat connecting rod (4) in an oven to a temperature of 177° to 260° C (350° to 500° F). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (C). Put a new rod pin bearing (6) on the adapter part of tooling (C). The old bearing is pushed out by tooling (C) as the new bearing is installed.7. Use tooling (C) to push the new bearing into the connecting rod until the push adapter of tooling (C) makes full contact with the connecting rod surface.8. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 50.830 0.008 mm (2.0012 .0003 in.).9. Check the clearance between the ends of the piston rings. See

Have questions with 104748-0502?





Group cross 104748-0502 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
9 460 612 582 
 
INJECTION-PUMP ASSEMBLY

Mazda 

104748-0502  
9 460 614 629 
R2F913800 
INJECTION-PUMP ASSEMBLY
R2
9 460 613 752 
 
INJECTION-PUMP ASSEMBLY
9 460 610 834 
 
INJECTION-PUMP ASSEMBLY

Mazda 

9 460 614 630 
R2G313800 
INJECTION-PUMP ASSEMBLY
9 460 611 229 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 613 753 
16700HC310 
INJECTION-PUMP ASSEMBLY
R2

Mazda 

9 460 613 753 
R2G113800 
INJECTION-PUMP ASSEMBLY
R2
9 460 611 230 
 
INJECTION-PUMP ASSEMBLY

Mazda 

9 460 613 754 
R2G213800 
INJECTION-PUMP ASSEMBLY
R2
9 460 610 668 
RF7913800D 
INJECTION-PUMP ASSEMBLY
RF
9 460 611 231 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 613 309 
16700HC336 
INJECTION-PUMP ASSEMBLY
R2

Mazda 

9 460 613 309 
R2K313800 
INJECTION-PUMP ASSEMBLY
R2
9 460 611 232 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 613 755 
16700HC331 
INJECTION-PUMP ASSEMBLY
R2

Mazda 

9 460 613 755 
R2K413800 
INJECTION-PUMP ASSEMBLY
R2
9 460 611 233 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 614 631 
16700HC332 
INJECTION-PUMP ASSEMBLY
R2

Mazda 

9 460 614 631 
R2K713800 
INJECTION-PUMP ASSEMBLY
R2
9 460 611 234 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 614 632 
16700HC333 
INJECTION-PUMP ASSEMBLY
R2

Mazda 

9 460 614 632 
R2K813800 
INJECTION-PUMP ASSEMBLY
R2
Back to top