104741-6400 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1047416400 8943616800


 

Information injection-pump assembly

ZEXEL 104741-6400 1047416400
ISUZU 8943616800 8943616800
104741-6400 INJECTION-PUMP ASSEMBLY
Rating:
19
Buy INJECTION-PUMP ASSEMBLY 104741-6400 zexel genuine, new aftermarket engine parts with delivery

Components :

0. INJECTION-PUMP ASSEMBLY 104741-6400
1. _
2. FUEL INJECTION PUMP
3. NUMBER PLATE
4. _
5. CAPSULE
6. ADJUSTING DEVICE
7. NOZZLE AND HOLDER ASSY 105118-4602
8. Nozzle and Holder
9. Open Pre:MPa(Kqf/cm2) 18.1(185)
10. NOZZLE-HOLDER 105048-3230
11. NOZZLE 105017-0490

Include in #2:

104741-6400 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
104741-6400 
104741-6401 
 
8943616800  ISUZU
INJECTION-PUMP ASSEMBLY
4JA1-EXP *




Information:

January 9, 2003
O-10
Priority PRODUCT IMPROVEMENT PROGRAM FOR INSTALLINGA NEW WIRE ASSEMBLY IN THE INJECTION ACTUATION PRESSURE CONTROL ON CERTAIN325C AND 325C L EXCAVATORS AND 950G II AND 962G II WHEEL LOADERS
1408 PI30431
This Program must be administered assoon as possible. When reporting the repair, use "PI30431" as the Partnumber and "7751" as the Group Number, "56" as the Warranty Claim DescriptionCode and "T" as the SIMS Description Code. Exception: If the repair isdone after failure, use "PI30431" as the Part Number, "7751" as the GroupNumber, "96" as the Warranty Claim Description Code, and "Z" as the SIMSDescription Code. The information supplied in this serviceletter may not be valid after the termination date of this program. Donot perform the work outlined in this Service Letter after the terminationdate without first contacting your Caterpillar product analyst.
COMPLETION DATE
TERMINATION DATE
July 31, 2003 January 31, 2004PROBLEM
A new wire assembly needs to be installed in theinjection actuation pressure control on certain 325C and 325C L Excavatorsand 950G II and 962G II Wheel Loaders. The injection actuation pressurecontrol valve connector may have been assembled incorrectly some 3126BEngine harness. This can lead to intermittent engine operation or can causethe engine to stop. The wire assembly must be replaced.AFFECTED PRODUCT
Model Identification Number
325C L CRB465, 466, 468, 469
325C CSJ571, 572, 574, 578, 582, 586
950G II AYL587, 591, 592, 598-601,610, 612, 615AYB486-491
962G AYE459
962G II BAB336, 338PARTS NEEDED
1 - 2324367 Wire AssemblyACTION REQUIRED
See the attached Rework Procedure.SERVICE CLAIM ALLOWANCES
Caterpillar Dealer Suggested Customer Suggested
Parts Labor Hrs. Parts Labor Hrs. Parts Labor Hrs.
100% 1 0 0 0 0
This is a 1-hour job.PARTS DISPOSITION
Handle the parts in accordance with your WarrantyBulletin on warranty parts handling.
MAKE EVERY EFFORT TO COMPLETE THIS PROGRAMAS SOON AS POSSIBLE.Attach. (1-Sample of Owner Notification)
(2-Rework Procedure)SAMPLE OF OWNER NOTIFICATION
XYZ Corporation
3240 Arrow Drive
Anywhere, YZ 99999PRIORITY - Install A New Wire Assembly In TheInjection Actuation Pressure ControlMODELS INVOLVED - 325C and 325C L Excavatorsand 950G II and 962G II Wheel LoadersDear Caterpillar Product Owner:A new wire assembly needs to be installed inthe injection actuation pressure control on certain 325C and 325C L Excavatorsand 950G II and 962G II Wheel Loaders. The injection actuation pressurecontrol valve connector may have been assembled incorrectly some 3126BEngine harness. This can lead to intermittent engine operation or can causethe engine to stop. The wire assembly must be replaced. A new wire assemblyneeds to be installed on the products listed below. You will not be chargedfor the service performed.Contact your local Caterpillar dealer immediatelyto schedule this service. The dealer will advise you of the time requiredto complete this service. Please refer the dealer to their Service Letterdated January 9, 2003 when scheduling this service.We regret the inconvenience this may causeyou, but urge you to have this service performed as soon as possible toprevent unscheduled downtime.Caterpillar Inc.
Identification #(s)Attached to January 9, 2003 Service Letter
Rework Procedure
Disconnect the IAP control valve connector (seeIllustration 1).
Cut the wires behind the connector.
Strip the ends of both wires.
Install 2324367 harness by crimping the strippedwires inside the splice. Take care to connect pink wire to pink wire onone hand, purple wire to purple wire on the other hand.
Heat both heat shrinkable tubes in order to insulateboth splices.
Reconnect the

Have questions with 104741-6400?





Group cross 104741-6400 ZEXEL

Isuzu 

104741-6400  

104741-6401 
 
8943616800 
INJECTION-PUMP ASSEMBLY
4JA1-EXP
9 460 611 541 
8943616801 
INJECTION-PUMP ASSEMBLY
4JA1-EXP
9 460 613 423 
8943618450 
INJECTION-PUMP ASSEMBLY
9 460 613 423 
8943616830 
INJECTION-PUMP ASSEMBLY
 
8943616840 
INJECTION-PUMP ASSEMBLY
4JB1
9 460 612 234 
8943616841 
INJECTION-PUMP ASSEMBLY
4JB1
9 460 614 469 
8943616850 
INJECTION-PUMP ASSEMBLY
4JB1
 
8943616860 
INJECTION-PUMP ASSEMBLY
4JB1
9 460 612 235 
8943616861 
INJECTION-PUMP ASSEMBLY
4JB1
9 460 611 361 
8943616870 
INJECTION-PUMP ASSEMBLY
4JB1
9 460 615 005 
8943616880 
INJECTION-PUMP ASSEMBLY
4JB1
 
8943421761 
INJECTION-PUMP ASSEMBLY
4JB1PTQ
9 460 612 236 
8943421762 
INJECTION-PUMP ASSEMBLY
4JB1PTQ
9 460 612 237 
8943625682 
INJECTION-PUMP ASSEMBLY
4JA1
9 460 613 663 
8943625692 
INJECTION-PUMP ASSEMBLY
4JA1
Back to top