104740-2651 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1047402651


 

Information injection-pump assembly

ZEXEL 104740-2651 1047402651
104740-2651 INJECTION-PUMP ASSEMBLY
Rating:
70
Buy INJECTION-PUMP ASSEMBLY 104740-2651 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
104740-2651 
 
   
INJECTION-PUMP ASSEMBLY




Information:

Cooling
Never add coolant to an overheated engine; allow the engine to cool first.Check specific gravity of antifreeze solution frequently in cold weather to assure adequate protection.Coolant should be drained and replaced "Every 2000 Service Meter Units." With additions of Caterpillar Cooling System Inhibitor or the use of Coolant Conditioner Elements as recommended, the drain period can be extended to "Every 4000 Service Meter Units."All water is corrosive at engine operating temperature. The cooling system should be protected with inhibitor at all times regardless of concentration of antifreeze. This can be done by maintaining a 3% concentration of liquid Caterpillar Cooling System Inhibitor or by using Coolant Conditioner Elements.Never use both the liquid cooling system inhibitor and coolant elements at the same time.Do not use Caterpillar Cooling System Inhibitor or Coolant Conditioner Elements with Dowtherm 209 Full-Fill Coolant.
Whenever draining and refilling cooling system, always recheck the coolant level when the engine reaches normal operating temperature.Filling at over 5 U.S. gallons (19 liters) per minute can cause air pockets in the cooling system.Premix antifreeze solution to provide protection to the lowest expected ambient temperature. Pure undiluted antifreeze will freeze at -10°F (-23°C).Operate with a thermostat in the cooling system all year-round. Cooling system problems can arise without a thermostat.Electrical
When using jumper cables to start the engine, be sure to connect in parallel: POSITIVE (+) to POSITIVE (+) and NEGATIVE (-) to NEGATIVE (-).
Scheduled Oil Sampling
Use Scheduled Oil Sampling to monitor the engine's condition and maintenance requirements.Each oil sample should be taken when the oil is hot, and well mixed, to insure a sample which is representative of the oil in the compartment.Consult your Caterpillar dealer for complete information, and assistance in establishing a Scheduled Oil Sampling program for your equipment.Fuel
Fill fuel tank at the end of each day of operation to drive out moisture laden air and to prevent condensation. Do not fill the tank to the brim. The fuel expands when it gets warm and may overflow.
Water and sediment should be drained from the fuel tank at the start of each shift or after the fuel tank has been filled and allowed to stand for 5 to 10 minutes.Drain fuel tank of moisture and sediment as required by prevailing conditions.After changing fuel filters, always bleed fuel system to remove air bubbles from system.Air Intake
Service air cleaners when RED band in indicator locks in visible position.

Have questions with 104740-2651?





Group cross 104740-2651 ZEXEL

Nissan 

9 460 610 703 
1670075J00 
INJECTION-PUMP ASSEMBLY
CD20
9 460 610 705 
1670075J01 
INJECTION-PUMP ASSEMBLY
CD20
9 460 610 682 
1670075J02 
INJECTION-PUMP ASSEMBLY
CD20
9 460 611 171 
1670066R03 
INJECTION-PUMP ASSEMBLY
CD17
9 460 611 172 
1670057J18 
INJECTION-PUMP ASSEMBLY
CD20
9 460 612 862 
 
INJECTION-PUMP ASSEMBLY
104740-2651  
 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 611 412 
167000M911 
INJECTION-PUMP ASSEMBLY
CD20
9 460 612 863 
1670059Y18 
INJECTION-PUMP ASSEMBLY
CD17
9 460 611 173 
1670087R11 
INJECTION-PUMP ASSEMBLY
CD17
9 460 611 174 
 
INJECTION-PUMP ASSEMBLY
9 460 611 175 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 611 413 
1670087R12 
INJECTION-PUMP ASSEMBLY
CD17
9 460 612 864 
1670088N21 
INJECTION-PUMP ASSEMBLY
CD20
9 460 612 865 
1670059Y02 
INJECTION-PUMP ASSEMBLY
CD17
Back to top