Information injection-pump assembly
ZEXEL
104740-2490
1047402490

Rating:
Cross reference number
ZEXEL
104740-2490
1047402490
Zexel num
Bosch num
Firm num
Name
104740-2490
INJECTION-PUMP ASSEMBLY
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113orSAEJ967d
1404 Test oil ISO4113orSAEJ967d
Test oil temperature
degC
45
45
50
Nozzle
105780-0060
Bosch type code
NP-DN0SD1510
Nozzle holder
105780-2150
Opening pressure
MPa
13
13
13.3
Opening pressure
kgf/cm2
133
133
136
Injection pipe
157805-7320
Injection pipe
Inside diameter - outside diameter - length (mm) mm 2-6-450
Inside diameter - outside diameter - length (mm) mm 2-6-450
Joint assembly
157641-4720
Tube assembly
157641-4020
Transfer pump pressure
kPa
20
20
20
Transfer pump pressure
kgf/cm2
0.2
0.2
0.2
Direction of rotation (viewed from drive side)
Left L
Left L
(Solenoid timer adjustment condition)
With S/T O-ring; S/T ON. ON
With S/T O-ring; S/T ON. ON
Injection timing adjustment
Pump speed
r/min
700
700
700
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
33.5
33.1
33.9
Difference in delivery
mm3/st.
3
Basic
*
Oil temperature
degC
50
48
52
Remarks
Full
Full
Injection timing adjustment_02
Pump speed
r/min
900
900
900
Boost pressure
kPa
44
42.7
45.3
Boost pressure
mmHg
330
320
340
Average injection quantity
mm3/st.
45
44.6
45.4
Difference in delivery
mm3/st.
3
Basic
*
Oil temperature
degC
50
48
52
Remarks
CBS
CBS
Injection timing adjustment_03
Pump speed
r/min
500
500
500
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
38.2
33.7
42.7
Oil temperature
degC
48
46
50
Injection timing adjustment_04
Pump speed
r/min
600
600
600
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
33.4
30.9
35.9
Oil temperature
degC
50
48
52
Injection timing adjustment_05
Pump speed
r/min
700
700
700
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
33.5
32.5
34.5
Difference in delivery
mm3/st.
3.5
Basic
*
Oil temperature
degC
50
48
52
Remarks
Full
Full
Injection timing adjustment_06
Pump speed
r/min
900
900
900
Boost pressure
kPa
44
42.7
45.3
Boost pressure
mmHg
330
320
340
Average injection quantity
mm3/st.
45
44
46
Difference in delivery
mm3/st.
3.5
Basic
*
Oil temperature
degC
50
48
52
Remarks
CBS
CBS
Injection timing adjustment_07
Pump speed
r/min
1200
1200
1200
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Average injection quantity
mm3/st.
54.8
51.8
57.8
Oil temperature
degC
50
48
52
Injection timing adjustment_08
Pump speed
r/min
1800
1800
1800
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Average injection quantity
mm3/st.
52.6
49.6
55.6
Oil temperature
degC
50
48
52
Injection timing adjustment_09
Pump speed
r/min
2200
2200
2200
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Average injection quantity
mm3/st.
48
44.5
51.5
Oil temperature
degC
52
50
54
Injection timing adjustment_10
Pump speed
r/min
2400
2400
2400
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Average injection quantity
mm3/st.
45.6
42.1
49.1
Oil temperature
degC
52
50
54
Injection quantity adjustment
Pump speed
r/min
2550
2550
2550
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Average injection quantity
mm3/st.
37.5
36.5
38.5
Basic
*
Oil temperature
degC
55
52
58
Injection quantity adjustment_02
Pump speed
r/min
2550
2550
2550
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Average injection quantity
mm3/st.
37.5
35
40
Basic
*
Oil temperature
degC
55
52
58
Injection quantity adjustment_03
Pump speed
r/min
2700
2700
2700
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Average injection quantity
mm3/st.
23.9
16.4
31.4
Difference in delivery
mm3/st.
5.5
Oil temperature
degC
55
52
58
Injection quantity adjustment_04
Pump speed
r/min
2950
2950
2950
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Average injection quantity
mm3/st.
7.5
Oil temperature
degC
55
52
58
Governor adjustment
Pump speed
r/min
400
400
400
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
10.5
9.5
11.5
Difference in delivery
mm3/st.
2
Basic
*
Oil temperature
degC
48
46
50
Governor adjustment_02
Pump speed
r/min
400
400
400
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
10.5
8.5
12.5
Difference in delivery
mm3/st.
2.5
Basic
*
Oil temperature
degC
48
46
50
Governor adjustment_03
Pump speed
r/min
600
600
600
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
5
Oil temperature
degC
50
48
52
Timer adjustment
Pump speed
r/min
100
100
100
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
68
63
73
Basic
*
Oil temperature
degC
48
46
50
Remarks
IDLE
IDLE
Timer adjustment_02
Pump speed
r/min
100
100
100
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
68
63
73
Oil temperature
degC
48
46
50
Speed control lever angle
Pump speed
r/min
400
400
400
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Average injection quantity
mm3/st.
0
0
0
Oil temperature
degC
48
46
50
Remarks
Magnet OFF at idling position
Magnet OFF at idling position
0000000901
Pump speed
r/min
900
900
900
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Overflow quantity with S/T OFF
cm3/min
380
250
510
Oil temperature
degC
50
48
52
Remarks
MEASURE
MEASURE
Stop lever angle
Pump speed
r/min
900
900
900
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Pressure with S/T ON
kPa
412
392
432
Pressure with S/T ON
kgf/cm2
4.2
4
4.4
Pressure with S/T OFF
kPa
353
324
382
Pressure with S/T OFF
kgf/cm2
3.6
3.3
3.9
Basic
*
Oil temperature
degC
50
48
52
Remarks
ON
ON
Stop lever angle_02
Pump speed
r/min
600
600
600
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Pressure with S/T ON
kPa
343
304
382
Pressure with S/T ON
kgf/cm2
3.5
3.1
3.9
Oil temperature
degC
50
48
52
Stop lever angle_03
Pump speed
r/min
900
900
900
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Pressure with S/T ON
kPa
411.5
382
441
Pressure with S/T ON
kgf/cm2
4.2
3.9
4.5
Basic
*
Oil temperature
degC
50
48
52
Stop lever angle_04
Pump speed
r/min
1400
1400
1400
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Pressure with S/T ON
kPa
520
481
559
Pressure with S/T ON
kgf/cm2
5.3
4.9
5.7
Oil temperature
degC
50
48
52
Stop lever angle_05
Pump speed
r/min
2200
2200
2200
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Pressure with S/T ON
kPa
696
647
745
Pressure with S/T ON
kgf/cm2
7.1
6.6
7.6
Oil temperature
degC
52
50
54
0000001101
Pump speed
r/min
900
900
900
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Timer stroke with S/T ON
mm
2.2
2
2.4
Timer stroke with S/T OFF
mm
1
0.5
1.5
Basic
*
Oil temperature
degC
50
48
52
Remarks
ON
ON
_02
Pump speed
r/min
600
600
600
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Timer stroke with S/T ON
mm
0.7
Oil temperature
degC
50
48
52
_03
Pump speed
r/min
900
900
900
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Timer stroke with S/T ON
mm
2.2
1.9
2.5
Timer stroke with S/T OFF
mm
1
0.4
1.6
Basic
*
Oil temperature
degC
50
48
52
_04
Pump speed
r/min
1400
1400
1400
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Timer stroke with S/T ON
mm
5.1
4.7
5.5
Oil temperature
degC
50
48
52
_05
Pump speed
r/min
2200
2200
2200
Boost pressure
kPa
66.7
65.4
68
Boost pressure
mmHg
500
490
510
Timer stroke with S/T ON
mm
8.15
7.7
8.6
Oil temperature
degC
52
50
54
0000001201
Max. applied voltage
V
8
8
8
Test voltage
V
13
12
14
Timing setting
K dimension
mm
3.3
3.2
3.4
KF dimension
mm
6.29
6.19
6.39
MS dimension
mm
0.9
0.8
1
BCS stroke
mm
4.6
4.4
4.8
Control lever angle alpha
deg.
25
21
29
Control lever angle beta
deg.
42
37
47
Test data Ex:
0000001801 POTENTIOMETER ADJUSTMENT

Potentiometer adjustment (dummy bolt type)
N:Pump speed
Q:Injection quantity
V:Output voltage
Vi:Applied voltage
A:Standard point
B:Check.
C/L: control lever angle
I:Idling lever position
F:Full speed lever position
E:Conversion point
C:Lever position
G:From idle
H:ON-->OFF
M:OFF-->ON
J:Connecting diagram for the potentiometer
K:Output
O:Output when (2) and (3) connected.
P:When (4) or (6) connected: switch OFF to ON.
R:When (4) or (5) connected: switch ON to OFF.
----------
----------
N1=700r/min Q1=15.9+-1.0mm3/st V1=2.83+-0.03V V2=(1.02+-0.4V) V3=(8.02+-1.47V) C1=(10.8deg) C2=0deg C3=42+-5deg Vi=10V C4=(7.5+-3deg) C5=(24.0++deg)
----------
----------
N1=700r/min Q1=15.9+-1.0mm3/st V1=2.83+-0.03V V2=(1.02+-0.4V) V3=(8.02+-1.47V) C1=(10.8deg) C2=0deg C3=42+-5deg Vi=10V C4=(7.5+-3deg) C5=(24.0++deg)
0000001901 STARTING I/Q ADJUSTMENT

Starting injection quantity adjustment
Adjust adjusting bolt so that the starting injection quantity is within the standard.
Fix using nut.
(A): Lock nut.
(B): Stopping lever
(C): Adjustment bolt
----------
----------
L=5.9~8.2mm
----------
----------
L=5.9~8.2mm
0000002001 M-CSD ADJUSTMENT

M-CSD adjustment
1. Fixing intermediate lever screw (A) [roller (E) must not contact intermediate lever (D)]
(1)Hold the control lever (C) in the idling position.
(2)With intermediate lever (D) and bracket (K)'s stopper contacting, fix nut (B) at the position where the clearance between the intermediate lever screw (A) and the control lever (C) is L1.
2. Fixing the stopper (I)
(1)Pull the CSD lever F in the direction X until it contacts the stopper I.
(2)With these types of timers, tighten the socket head bolt (J) at the position where the advance angle is L2.
3. Screw (G) adjustment
(1)Pull the CSD lever F in the direction X until it contacts the stopper I and adjust using screw G so that the control lever shim thickness is L3. Then fix using nut H. Pin E is fully above the elongated hole (R).
(2)When the CSD lever (F) is returned, there can be a clearance between (E)'s pin and (D)'s intermediate lever. Also, to fine adjust the lever position, use screw (A) (but you must maintain clearance L1).
----------
L1=1~2mm L2=1.64+-0.2mm L3=11.0+-0.05mm R=45.5mm
----------
T1=6~9N-m(0.6~0.9kgf-m) T2=4.9~7N-m(0.5~0.7kgf-m) T3=2~2.9N-m(0.2~0.3kgf-m) R=45.5mm L1=1~2mm L2=1.64+-0.2mm L3=11.0+-0.05mm
----------
L1=1~2mm L2=1.64+-0.2mm L3=11.0+-0.05mm R=45.5mm
----------
T1=6~9N-m(0.6~0.9kgf-m) T2=4.9~7N-m(0.5~0.7kgf-m) T3=2~2.9N-m(0.2~0.3kgf-m) R=45.5mm L1=1~2mm L2=1.64+-0.2mm L3=11.0+-0.05mm
Information:
Start By:a. remove valve covers 1. Remove bolts (1) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (2). 2. Use tool (A) to loosen fuel injection line (3) from fuel injection nozzle (4). 3. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (3). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (5) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (6). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (7). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (8) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (8) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20 ° to 30 ° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (7). 4. Put rocker shaft assemblies (6) in position on the cylinder head assembly.5. Put clean engine oil on the threads of bolts (5) that hold the shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (3). Tighten the fuel injection line adapter nuts (9) to a torque of 40 7 N m (30 5 lb.ft.) with tool (B).7. Tighten fuel injection line nut (10) to a torque of 40 7 N m (30 5 lb.ft.) with tool (A).8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.76 mm (.030 in.). See Valve Clearance Setting in Testing And Adjusting. Tighten the locknut to a torque of 30 4 N m (22 3
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (8) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20 ° to 30 ° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (7). 4. Put rocker shaft assemblies (6) in position on the cylinder head assembly.5. Put clean engine oil on the threads of bolts (5) that hold the shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (3). Tighten the fuel injection line adapter nuts (9) to a torque of 40 7 N m (30 5 lb.ft.) with tool (B).7. Tighten fuel injection line nut (10) to a torque of 40 7 N m (30 5 lb.ft.) with tool (A).8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.76 mm (.030 in.). See Valve Clearance Setting in Testing And Adjusting. Tighten the locknut to a torque of 30 4 N m (22 3
Have questions with 104740-2490?
Group cross 104740-2490 ZEXEL
Nissan
Nissan
Nissan
Nissan
Nissan
Nissan
Nissan
Nissan
Nissan
Nissan
104740-2490
INJECTION-PUMP ASSEMBLY