104740-2362 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1047402362


 

Information injection-pump assembly

ZEXEL 104740-2362 1047402362
104740-2362 INJECTION-PUMP ASSEMBLY
Rating:
10
Buy INJECTION-PUMP ASSEMBLY 104740-2362 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
104740-2362 
 
   
INJECTION-PUMP ASSEMBLY




Information:

Start By:a. remove radiator
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Loosen bolt (4), bolt (5), and bolt (6). Remove belts (3).2. Remove bolts (2) and fan (1). 3. Remove bolt (7) and washer (8). Put enough spacers (10) on bolt (7) to get approximately 3.18 mm (.125 in) of clearance between washer (8) and vibration damper and pulley assembly (9). Install bolt (7), washer (8), and spacers (10).
If spacers (10) are not used, damage to the bolt and/or crankshaft can result when the vibration damper and pulley are removed from the crankshaft.
4. Install tool (A) as shown, and loosen vibration damper and pulley assembly (9).5. Remove tool (A), bolt (7), washer (8), spacers (10), and vibration damper and pulley assembly (9). 6. If necessary, remove bolts (11) and vibration damper (12). The following steps are to install the crankshaft vibration damper and pulley. Inspect the vibration damper housing for leakage or dents (damage housing). If either condition exists, a replacement of the vibration damper must be made.7. Install vibration damper (12) on pulley (13). Install bolts (11).8. Install vibration damper and pulley assembly (9) and install bolt (7), spacers (10) and washer (8).
The flat side of washer (8) must be installed toward vibration damper and pulley assembly (9).
9. Tighten bolt (7) to a torque of 284 to 340 N m (210 to 250 lb ft). Hit bolt (7) with a hammer and retighten to a torque of 284 to 340 N m (210 to 250 lb ft).10. Position belts (3). Tighten bolts (4), (5), and (6). Use a belt tension gauge and make an adjustment of the belts. Measure the belt farthest from the engine. Tighten new belts until the gauge indication is 534 22 N (120 5 lb ft). Operate the engine at high idle for a minimum of 30 minutes after installing radiator and guards. Make another adjustment of the belt tension. The correct gauge indication for a used belt is 400 44 N (90 10 lb.). Tighten bolt (4), bolt (5), and bolt (6).11. Install fan (1) and bolt (2).End By:a. install radiator

Have questions with 104740-2362?





Group cross 104740-2362 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
9 460 612 826 
 
INJECTION-PUMP ASSEMBLY
104740-2362  
 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 612 827 
167001C300 
INJECTION-PUMP ASSEMBLY
XM3-T
9 460 613 581 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 460 612 828 
167001C301 
INJECTION-PUMP ASSEMBLY
CD20-T
Back to top