104740-1300 ZEXEL 9 460 610 185 BOSCH INJECTION-PUMP ASSEMBLY 9460610185 1047401300 8944056382


 

Information injection-pump assembly

BOSCH 9 460 610 185 9460610185
ZEXEL 104740-1300 1047401300
ISUZU 8944056382 8944056382
104740-1300 INJECTION-PUMP ASSEMBLY
Rating:
31
Buy INJECTION-PUMP ASSEMBLY 104740-1300 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
104740-1300 
104740-1301 
9 460 610 185 
8944056382  ISUZU
INJECTION-PUMP ASSEMBLY
4FC1 *




Information:


MAIN BEARINGS
1. Bolt (partially hidden under oil pump). 2. Front cover. 3. Oil pump. 4. Bolts (two per cap). 5. Main bearing cap.
ADAPTER
6. 8S5131 Adpater.4. Use a commercially available bearing removal tool to roll out upper halves of main bearings.Install Main Bearings
1. Use a commercially available bearing removal tool to install the upper halves of the main bearings. Lubricate with clean engine oil (SAE 30) before installing. The main bearing half with the oil hole is the upper half. Be sure to install correctly.2. Lubricate lower halves of main bearings with engine oil (SAE 30). Install main bearing caps (5) so number on cap corresponds with number on saddle of cylinder block. Both numbers must be on same side of block.3. Put engine oil on the threads of the bolts and the face of the washers and install bolts (4) into the cylinder block.4. Use adapter (6) to install bolt (1) when front cover (2) and oil pump (3) are mounted on cylinder block. For 1140 (36B1-36B1923), 1145 (97B1-97B6154), 1150 (96B1-96B6580), 1160 (95B1-95B13691) Engines, install bolt (1) using a 9S7353 Torque Wrench with an 8S5131 Adapter. Do not tighten bolt (1) at this time. Tighten bolt (1) in the number sequence shown with the other bolts but tighten it to a first torque of 48 lb. ft. (6.6 mkg) and a last torque of 140 lb. ft. (19.4 mkg). See Step 5 for torque of the other bolts.For 1140 (36B1924-Up), 1145 (97B6155-Up), 1150 (96B6581-Up), 1160 (95B13692-Up) Engines, install bolt (1) using a 9S7353 Torque Wrench with an 8S5131 Adapter. Do not tighten bolt (1) at this time. Tighten bolt (1) in the number sequence shown with the other bolts but tighten it to a first torque of 24 lb. ft. (3.3 mkg). Put a mark on the bolt and cap. Tighten the bolt an added 120° 5° from the mark. See Step 6 for torque of the other bolts.
MAIN BEARINGS
1. Bolt (partially hidden under oil pump). 2. Front cover. 3. Oil pump. 4. Bolts (two per cap). 5. Main bearing cap.
ADAPTER
6. 8S5131 Adapter.5. Tighten the bolts for the main bearing caps in the number sequence shown to a first torque of 60 15 lb. ft. (8.3 2.1 mkg). Tighten all bolts in the number sequence shown (hand torque only) to a last torque of 175 10 lb. ft. (24.2 1.4 mkg).
BOLT TIGHTENING SEQUENCE6. Tighten the bolts for the main bearing caps in the number sequence shown to a first torque of 30 3 lb. ft. (4.1 0.4 mkg). Put a mark on each bolt and cap and tighten, in the number sequence shown, an added 120° 5° from the mark.

Have questions with 104740-1300?





Group cross 104740-1300 ZEXEL

Isuzu 

104740-1300  

104740-1301 
9 460 610 185 
8944056382 
INJECTION-PUMP ASSEMBLY
4FC1
 
8944056383 
INJECTION-PUMP ASSEMBLY
4FC1
9 460 610 186 
8944185232 
INJECTION-PUMP ASSEMBLY
4FC1
 
8944185233 
INJECTION-PUMP ASSEMBLY
4FC1
 
8944240821 
INJECTION-PUMP ASSEMBLY
C223T
9 460 615 019 
 
INJECTION-PUMP ASSEMBLY
9 460 613 556 
8944397800 
INJECTION-PUMP ASSEMBLY
4FC1
9 460 613 557 
8944397810 
INJECTION-PUMP ASSEMBLY
4FC1
9 460 611 068 
8944397820 
INJECTION-PUMP ASSEMBLY
4FC1
9 460 611 069 
8944397830 
INJECTION-PUMP ASSEMBLY
4FC1
9 460 611 070 
8944397840 
INJECTION-PUMP ASSEMBLY
4FC1
9 460 611 071 
8944397850 
INJECTION-PUMP ASSEMBLY
4FC1
9 460 615 044 
8944467961 
INJECTION-PUMP ASSEMBLY
4FC1
Back to top