104304-4501 ZEXEL 9 400 612 790 BOSCH INJECTION-PUMP ASSEMBLY 9400612790 1043044501 8943274931


 

Information injection-pump assembly

BOSCH 9 400 612 790 9400612790
ZEXEL 104304-4501 1043044501
ISUZU 8943274931 8943274931
104304-4501 INJECTION-PUMP ASSEMBLY
Rating:
84
Buy INJECTION-PUMP ASSEMBLY 104304-4501 zexel genuine, new aftermarket engine parts with delivery

Service parts 104304-4501 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 104300-4660
3. GOVERNOR
4. SUPPLY PUMP
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105141-2281
11. Nozzle and Holder 5-15300-117-1
12. Open Pre:MPa(Kqf/cm2) 11.8{120}
13. NOZZLE-HOLDER 105071-1380
14. NOZZLE 105000-1860
15. NOZZLE SET

Include in #1:

104304-4501 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 612 790 9400612790
ZEXEL 104304-4501 1043044501
ISUZU 8943274931 8943274931


Zexel num
Bosch num
Firm num
Name
104304-4501 
9 400 612 790 
8943274931  ISUZU
INJECTION-PUMP ASSEMBLY
4FE1 * K 14BX PES4K PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   2.1 2.05 2.15
Rack position
Point A
  R=A
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.2
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   25.6 23.6 27.6
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   7.8
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   26.4 25.4 27.4
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   -
Rack position   7+-0.5
Pump speed r/min   450 450 450
Average injection quantity mm3/st.   7.6 6.6 8.6
Max. variation between cylinders %   0 -14 14
Fixing the lever   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_04
Adjusting point   D
Rack position   13+1
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   34.4 34.4
Fixing the lever   *

Test data Ex:

Governor adjustment

Test data 104304-4501
N:Pump speed R:Rack position (mm) (1)Torque control stroke: L1 (2)Set the idle spring. (3)Main spring setting (4)Rack difference from N = N1
----------
L1=0.4mm N1=1250r/min
----------

Speed control lever angle

Test data 104304-4501
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=7deg+-3deg b=23deg+-6deg

Stop lever angle

Test data 104304-4501
N:Pump normal S:Stop the pump.
----------

----------
a=100deg+-5deg b=(38deg)

Timing setting

Test data 104304-4501
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------
aa=20deg
----------
a=(50deg)




Information:


PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Rework Procedure
Diesel Exhaust Fluid Pressure Line Removal Process:
1. Follow the Disassembly and Assembly, UENR4468, for Diesel Exhaust Fluid Lines ? Remove and Install, steps 1 to 9 to remove the DEF pressure line.
2. Remove p-clips (3) and (4) on the plate attached to the hydraulic tank and on the sound wall support leg. Keep the bolt and washer from p-clip (4) as it will be used to install the new pressure line (Image1.1.1).
Image1.1.1
3. Remove p-clip (8) from the inside of the frame and p-clips (10,12) inside of the DEF enclosure from the diesel exhaust fluid pressure line (11) (Image1.2.1).
4. Cut cable ties (9,13) near the PETU from the diesel exhaust fluid pressure line (11) (Image1.2.1).
5. Pull the diesel exhaust fluid pressure line (11) out of the machine (Image1.2.1).
Image1.2.1
DEF Injector Replacement ? Remove and Install:
1. Remove DEF injector and replace. Follow Disassembly and Assembly, UENR6559, for DEF Injector and Mounting - Remove and Install.
New Diesel Exhaust Fluid Pressure Line Preparation:
1. Lay the 3.65 m pressure line out straight on a flat surface
2. Measure 308 mm from the mating point of the line and the connector and mark the location
3. Measure 631 mm from the mating point of the line and the connector and mark the location
4. Measure 996 mm from the mating point of the line and the connector and mark the location
5. Measure 1386 mm from the mating point of the line and the connector and mark the location
6. Place p-clip (6D-4246) on the line with its edge on the 1st mark
7. Place p-clip (336-8614) on the line with its edge on the 2nd mark
8. Place p-clip (336-8614) on the line with its edge on the 3rd mark
9. Place p-clip (336-8614) on the line with its edge on the 4th mark
Note: Keep lines capped when measuring and placing the p-clips
Image1.4.1
Machine Preparation:
1. Remove bracket (1) from machine. Keep the bolt and washer as it will be used when installing the new pressure line (Image1.5.1).
2. Drill an 11 mm diameter hole in the hood support. Refer to Image1.5.2 for location and Image1.5.3 for dimensions.
3. Remove the bolt and washer on the hydraulic tank support plate and keep as it will be used when installing the new diesel exhaust fluid pressure line (Image1.5.4).
Image1.5.1
Image1.5.2
Image1.5.3
Image1.5.4
Installation Process:
1. Remove plugs from the new diesel exhaust fluid pressure line
2. Attach p-clip 6D-4246 (1) and hose to the newly drilled 11 mm hole in the hood support using hardware nut 344-5675 (qty. 1), washer 8T-4121 (qty. 2), and bolt 8T-4195 (qty. 1). Once attached, the p-clip should be oriented at 15 degrees from vertical pointing downwards. Torque hardware to 55 Nm (Image1.6.1).
Image1.6.1
3. Attach p-clip 336-8614 (2) to the hydraulic tank and secure using the removed hardware (bolt: 8T-4136 and washer: 7X-7729) from step 3 of the machine preparation. Once attached, the p-clip should be oriented at 30 degrees from vertical pointing upwards to maintain the upwards slope of the line towards the hydraulic tank. Torque hardware to 55 Nm once p-clip is oriented correctly (Image1.7.1.).
Image1.7.1
4. Connect the diesel exhaust fluid line to the DEF injector
5. Attach

Have questions with 104304-4501?





Group cross 104304-4501 ZEXEL

Isuzu 

 
8943274930 
INJECTION-PUMP ASSEMBLY
4FE1
104304-4501  
9 400 612 790 
8943274931 
INJECTION-PUMP ASSEMBLY
4FE1

Ishikawajima-S 

 
131017570 
INJECTION-PUMP ASSEMBLY
T854B
9 400 616 523 
131017571 
INJECTION-PUMP ASSEMBLY
T854B-2T
Back to top