Information injection-pump assembly
BOSCH
9 400 616 497
9400616497
ZEXEL
104303-5280
1043035280
ISEKI
62156000900B
62156000900b

Rating:
Service parts 104303-5280 INJECTION-PUMP ASSEMBLY:
1.
_
3.
GOVERNOR
4.
SUPPLY PUMP
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
12.
Open Pre:MPa(Kqf/cm2)
20.6{210}
15.
NOZZLE SET
Include in #1:
104303-5280
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 616 497
9400616497
ZEXEL
104303-5280
1043035280
ISEKI
62156000900B
62156000900b
Zexel num
Bosch num
Firm num
Name
104303-5280
9 400 616 497
62156000900B ISEKI
INJECTION-PUMP ASSEMBLY
E3AG1 * K 14BV INJECTION PUMP ASSY PES3K PE
E3AG1 * K 14BV INJECTION PUMP ASSY PES3K PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-2
Pre-stroke
mm
2.8
2.75
2.85
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 2
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Injection quantity adjustment
Adjusting point
A
Rack position
7.9
Pump speed
r/min
1250
1250
1250
Average injection quantity
mm3/st.
32.3
31.3
33.3
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
-
Rack position
6.8+-0.5
Pump speed
r/min
425
425
425
Average injection quantity
mm3/st.
6.6
5.6
7.6
Max. variation between cylinders
%
0
-14
14
Fixing the lever
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
C
Rack position
11.1+-0.
5
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
50
46
54
Fixing the lever
*
Rack limit
*
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)RACK LIMIT
(2)Rack difference from N = N1
(3)Torque control stroke: L2
----------
N1=1250r/min L2=1.3mm
----------
----------
N1=1250r/min L2=1.3mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=12deg+-3deg b=22deg+-6deg
----------
----------
a=12deg+-3deg b=22deg+-6deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=10deg+-1deg b=(38deg)
----------
----------
a=10deg+-1deg b=(38deg)
Timing setting

(1)Pump vertical direction
(2)Position of gear mark '00' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=18deg
----------
a=(110deg)
----------
aa=18deg
----------
a=(110deg)
Information:
(1) Cylinder head bolts and nuts tightening procedure:1. Put engine oil on the threads of bolts and nuts. Tighten all bolts and nuts in number sequence to a torque of ... 45 N m (35 lb ft)2. Tighten all bolts and nuts in number sequence to a torque of ... 95 N m (70 lb ft)3. Again tighten all bolts and nuts in number sequence to a final torque of ... 135 N m (100 lb ft).Retighten the cylinder head bolts and nuts after the engine has run under partial load for approximately thirty minutes. The rocker shaft assembly has to be removed and valve lash adjusted again.a. If the bolts and nuts move before the correct final torque is reached, retighten everything in the sequence again to the final torque of 135 N m (100 lb ft).b. If the bolts and nuts do not move before the correct final torque is reached, back each one off 30 to 60° (with an 8T3052 Degree Wheel) and retighten again, in the sequence shown, to the final torque. After all the bolts and nuts are retightened, check the first 10 positions to make sure they are tightened to the correct torque.c. After 25 to 50 hours of service for a new or rebuilt engine, retorque the cylinder head bolts as shown in Step a above and adjust the valves again.New cylinder blocks have been introduced on the 4.236 engine. The new cylinder blocks have deeper cylinder head bolt holes and longer bolts. The old and new sizes are shown. The change became effective at engine serial number LD----U027631M and up. See General Information in Systems Operation for the engine serial number location. The new cylinder head bolts are not interchangeable between old and new bolts.(2) Torque for nuts that hold injectors ... 19 N m (14 lb ft)Replace the copper washer and rubber seal between the head and the injector every time the injector is removed. See Fuel Injector Installation in Testing And Adjusting.(3) Torque for fuel line nuts ... 20 N m (15 lb ft)(4) Torque for nuts that hold rocker shaft to head ... 75 N m (54 lb ft)(5) Valve lash [clearance (cold)], between rocker arm and valve: Intake ... 0.30 mm (0.012 in)Exhaust ... 0.30 mm (0.012 in)(6) Maximum permissible nozzle projection below cylinder head face after resurfacing ... 4.44 mm (0.175 in) Resurfacing allowance (maximum) ... 0.30 mm (0.012 in)(7) Depth of cylinder head (new) ... 103.188 0.38 mm (4.0625 0.015 in) Minimum depth of cylinder head (after resurfacing) ... 102.502 mm (4.0355 in)Maximum permissible amount of bow (curve of cylinder head):Across width (transverse) ... 0.09 mm (0.003 in)Across length (longitudinal) ... 0.15 mm (0.006 in)(See Cylinder Head Check in Testing And Adjusting)
Have questions with 104303-5280?
Group cross 104303-5280 ZEXEL
Iseki
104303-5280
9 400 616 497
62156000900B
INJECTION-PUMP ASSEMBLY
E3AG1
E3AG1