104303-5200 ZEXEL 9 400 616 492 BOSCH INJECTION-PUMP ASSEMBLY 9400616492 1043035200 62156000460a


 

Information injection-pump assembly

BOSCH 9 400 616 492 9400616492
ZEXEL 104303-5200 1043035200
ISEKI 62156000460A 62156000460a
104303-5200 INJECTION-PUMP ASSEMBLY
Rating:
24
Buy INJECTION-PUMP ASSEMBLY 104303-5200 zexel genuine, new aftermarket engine parts with delivery

Service parts 104303-5200 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 104300-6480
3. GOVERNOR
4. SUPPLY PUMP
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4950
11. Nozzle and Holder 6215300-0041
12. Open Pre:MPa(Kqf/cm2) 20.6{210}
13. NOZZLE-HOLDER 105048-3490
14. NOZZLE 105017-0200
15. NOZZLE SET

Include in #1:

104303-5200 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 616 492 9400616492
ZEXEL 104303-5200 1043035200
ISEKI 62156000460A 62156000460a


Zexel num
Bosch num
Firm num
Name
104303-5200 
9 400 616 492 
62156000460A  ISEKI
INJECTION-PUMP ASSEMBLY
E3AD1 K 14BV INJECTION PUMP ASSY PES3K PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-2
Pre-stroke mm   2.8 2.75 2.85
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 2
Cyl.1-2
deg.   240 239.5 240.5
Injection quantity adjustment
Adjusting point   A
Rack position   9
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   35.8 34.8 36.8
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   9.7
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   32.6 31.6 33.6
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   -
Rack position   7.6+-0.5
Pump speed r/min   425 425 425
Average injection quantity mm3/st.   6.6 5.6 7.6
Max. variation between cylinders %   0 -14 14
Fixing the lever   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_04
Adjusting point   D
Rack position   11.7+-0. 5
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   50 46 54
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 104303-5200
N:Pump speed R:Rack position (mm) (1)RACK LIMIT (2)Torque control stroke (3)Rack difference from N = N1
----------
N1=1250r/min
----------

Speed control lever angle

Test data 104303-5200
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=12deg+-3deg b=21deg+-6deg

Stop lever angle

Test data 104303-5200
N:Pump normal S:Stop the pump.
----------

----------
a=10deg+-1deg b=(38deg)

Timing setting

Test data 104303-5200
(1)Pump vertical direction (2)Position of gear mark '00' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=18deg
----------
a=(110deg)




Information:

Start By:a. remove valve cover 1. Disconnect fuel line nut (1). Remove nut (2) and O-ring seal. Disconnect fuel line nut (4) and remove fuel line assembly (3).
Put protection caps on all fuel line openings.
2. Remove retainer (5) from fuel adapter with Tool (B). 3. Install Tooling (C) and remove fuel nozzle assembly from adapter. 4. Install Tool (D) and remove adapter (6). 5. Remove carbon seal stop (7) with Tool (E). 6. Remove washer (8) and bleed screw (9) from fuel nozzle assembly (10). The following steps are for the installation of the fuel injection nozzles and adapters. 7. Install new carbon seal stop (7) with Tool (E). 8. Make sure the correct washer (8) is used when the nozzle assembly (10) is installed. Always use a new washer anytime the bleed screw (9) is loosened or removed. Install fuel nozzle assembly (10) in adapter (6). Install retainer (5) to a torque of 48 7 N m (35 5 lb ft). 9. Put 5P-3931 Anti-Seize Compound on the threads of the adapter before installation. Install fuel adapter (6) with Tool (D). Torque for the adapter is 200 14 N m (150 10 lb ft).10. Install fuel injection line assembly (3) (finger tighten connections first). Install the O-ring seal and nut (2) to a torque of 30 7 N m (22 5 lb ft). Reconnect fuel line nut (1) to a torque of 40 7 N m (30 5 lb ft). Use Tool (A) to reconnect fuel line nut (4) to a torque of 40 7 N m (30 5 lb ft).End By:a. install valve cover

Have questions with 104303-5200?





Group cross 104303-5200 ZEXEL

Iseki 

104303-5200  
9 400 616 492 
62156000460A 
INJECTION-PUMP ASSEMBLY
E3AD1
9 400 616 493 
62156000470A 
INJECTION-PUMP ASSEMBLY
E3AD1
9 400 616 494 
62156000480A 
INJECTION-PUMP ASSEMBLY
E3AG1
 
62156000490A 
INJECTION-PUMP ASSEMBLY
E3AG1
 
62156000710 
INJECTION-PUMP ASSEMBLY
E3AG1
9 400 616 495 
62156000720 
INJECTION-PUMP ASSEMBLY
E3AG1
 
62156000770 
INJECTION-PUMP ASSEMBLY
E3AD1
 
62156000760 
INJECTION-PUMP ASSEMBLY
E3AD1
9 400 616 496 
62156000761A 
INJECTION-PUMP ASSEMBLY
E3AD1
9 400 616 497 
62156000900B 
INJECTION-PUMP ASSEMBLY
E3AG1
Back to top