104303-5160 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1043035160 62156000341b


 

Information injection-pump assembly

ZEXEL 104303-5160 1043035160
ISEKI 62156000341B 62156000341b
104303-5160 INJECTION-PUMP ASSEMBLY
Rating:
18
Buy INJECTION-PUMP ASSEMBLY 104303-5160 zexel genuine, new aftermarket engine parts with delivery

Service parts 104303-5160 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 104300-6460
3. GOVERNOR
4. SUPPLY PUMP
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4940
11. Nozzle and Holder 6215300-0022
12. Open Pre:MPa(Kqf/cm2) 20.6{210}
13. NOZZLE-HOLDER 105048-3480
14. NOZZLE 105017-0190
15. NOZZLE SET

Include in #1:

104303-5160 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
104303-5160 
 
62156000341B  ISEKI
INJECTION-PUMP ASSEMBLY
E3AE1 * K




Information:

3. Remove turbo supply and drain lines (1). 4. Remove bolts (3) that holds bonnet (2) to engine block and torque converter oil cooler.5. Remove bolts (5), (6) and (7) (not shown) and remove cooler. Install in the reverse order. Fill cooling system with coolant. See the Operation & Maintenance Manual for the proper procedure and levels. Check the engine oil level. See the Operation & Maintenance Manual for the proper procedure and levels.End By:a. install oil filters and baseDisassemble Engine Oil Cooler & Bypass Valves
Start By:a. remove engine oil cooler and bypass valves 1. Remove bolts (1) to remove bypass valve assembly (3) from oil cooler (2). 2. Remove adapter (6) from the engine oil cooler. Remove O-ring seals (5) from the adapter.3. Remove bolts (4) to remove cover (7). Remove valves (9) and springs (8) from water line.4. Remove tube (10) from water lines. Remove O-ring seals (11) from the tube. 5. Clean the engine oil cooler tubes with a 3.2 mm (.125 in) diameter rod as shown.Assemble Engine Oil Cooler & Bypass Valves
1. Install new O-ring seals (1) on adapter (2). Install adapter (2) in the engine oil cooler.2. Install new O-ring seals (7) on tube (6). Install tube in water lines.3. Install valves (5) and springs (4) in the water line. Install cover (3) with the bolts (9) that hold it. 4. Install the bypass valve assembly on the engine oil cooler with the bolts (8) that hold it. Install the cover and bolts (9).End By:a. install engine oil cooler and bypass valves

Have questions with 104303-5160?





Group cross 104303-5160 ZEXEL

Iseki 

 
62156000213E 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000223E 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000340A 
INJECTION-PUMP ASSEMBLY
E3AE1
 
62156000350A 
INJECTION-PUMP ASSEMBLY
E3AE1
 
62156000360A 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000370A 
INJECTION-PUMP ASSEMBLY
E3AF1
104303-5160  
 
62156000341B 
INJECTION-PUMP ASSEMBLY
E3AE1
9 400 616 491 
62156000351B 
INJECTION-PUMP ASSEMBLY
E3AE1
 
 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000361B 
INJECTION-PUMP ASSEMBLY
E3AF1
 
 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000371B 
INJECTION-PUMP ASSEMBLY
E3AF1
Back to top