104303-5060 ZEXEL 9 400 616 489 BOSCH INJECTION-PUMP ASSEMBLY 9400616489 1043035060 62156000290a


 

Information injection-pump assembly

BOSCH 9 400 616 489 9400616489
ZEXEL 104303-5060 1043035060
ISEKI 62156000290A 62156000290a
104303-5060 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 104303-5060 zexel genuine, new aftermarket engine parts with delivery

Service parts 104303-5060 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 104300-6230
3. GOVERNOR
4. SUPPLY PUMP 105248-1090
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4950
11. Nozzle and Holder 6215300-0041
12. Open Pre:MPa(Kqf/cm2) 20.6{210}
13. NOZZLE-HOLDER 105048-3490
14. NOZZLE 105017-0200
15. NOZZLE SET

Include in #1:

104303-5060 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 616 489 9400616489
ZEXEL 104303-5060 1043035060
ISEKI 62156000290A 62156000290a


Zexel num
Bosch num
Firm num
Name
104303-5060 
104303-5200 
9 400 616 489 
62156000290A  ISEKI
INJECTION-PUMP ASSEMBLY
E3AD1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-2
Pre-stroke mm   2.8 2.75 2.85
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 2
Cyl.1-2
deg.   240 239.5 240.5
Injection quantity adjustment
Adjusting point   A
Rack position   9
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   35.8 34.8 36.8
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   7.6+-0.5
Pump speed r/min   425 425 425
Average injection quantity mm3/st.   6.6 5.6 7.6
Max. variation between cylinders %   0 -14 14
Fixing the lever   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   C
Rack position   11.7+-0. 5
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   50 46 54
Fixing the lever   *
Rack limit   *
Injection quantity adjustment_04
Adjusting point   D
Rack position   9.7
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   32.6 31.6 33.6
Max. variation between cylinders %   0 -4 4
Fixing the lever   *

Test data Ex:

Governor adjustment

Test data 104303-5060
N:Pump speed R:Rack position (mm) (1)Torque control stroke: L1 (2)RACK LIMIT (3)Rack difference from N = N1
----------
L1=1.1mm N1=1250r/min
----------

Speed control lever angle

Test data 104303-5060
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=12deg+-3deg b=21deg+-6deg

Timing setting

Test data 104303-5060
(1)Pump vertical direction (2)Position of gear mark '00' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=18deg
----------
a=(110deg)




Information:

Do not put oil on the bearings until the bearing clearance has been checked.1. Install bearings (1) in the connecting rods they were removed from. Make sure the tab in each bearing is in alignment with the notch in each connecting rod.2. Install bearings (2) in the cylinder block. Make sure the tab in each bearing is in alignment with the notch in the cylinder block. 3. Install pin (3) in the end of the crankshaft. Install the pin so that it extends a maximum of 6.4 mm (.252 in) above the surface. 4. Install the dowel in the crankshaft that puts gear (4) in the correct position. Install the dowel so that it extends 4.1 0.5 mm (.161 .020 in) above the surface of the crankshaft.5. Heat gear (4) to a maximum temperature of 233° C (451° F). Gear (4) must be installed on the crankshaft with the "V" timing mark toward the outside.6. Install gear (4) on the crankshaft. Make sure the notch in the gear is in alignment with the dowel on the crankshaft. The dimension from the rear face of the gear to the front face of the crankshaft must be 45.54 0.25 mm (1.793 .010 in). 7. Fasten Tooling (A) and a hoist to the crankshaft (5) as shown. Install the crankshaft in the engine. The weight of the crankshaft is approximately 131 kg (290 lb). 8. Make sure that "V" mark (6) on the crankshaft is in alignment with "V" mark (7) on the idler gear. The side of each thrust plate (8) with the words "BLOCK SIDE" must be installed with this side toward the cylinder block.9. Put clean oil on thrust plates (8). Install thrust plates (8) next to the center main bearings. Do not put oil on bearings (9) until the bearing clearances have been checked.10. Put bearings (9) in their original position in crankshaft main bearing caps (10).11. Check the crankshaft main bearing clearance with Plastigage as follows:a. Put a piece of Plastigage between the crankshaft bearing journal surface and bearing (9).b. Install the crankshaft main bearing caps (10) with the arrow on each cap toward the front of cylinder block. Each crankshaft main bearing cap has a number on the bottom surface and must be installed in the same position as the correct number on the left side of the cylinder block.c. Put 2P-2506 Thread Lubricant on the threads of the cap bolts. Install the cap bolts finger tight.d. Tighten the bolts on the tab end of the caps first to a torque of 258 14 N m (190 10 lb ft).e. Tighten the bolts on the other end of the caps to a torque of 258 14 N m (190 10 lb ft).
Do not use an impact wrench to tighten the bolts the additional 120 degrees.
f. Put a mark across the bolt head and cap. Tighten the bolts opposite the tab end of the cap

Have questions with 104303-5060?





Group cross 104303-5060 ZEXEL

Iseki 

 
62156000190B 
INJECTION-PUMP ASSEMBLY
E3AE1
 
62156000192D 
INJECTION-PUMP ASSEMBLY
E3AE1
 
62156000193E 
INJECTION-PUMP ASSEMBLY
E3AE1
 
62156000200B 
INJECTION-PUMP ASSEMBLY
E3AE1
 
62156000202D 
INJECTION-PUMP ASSEMBLY
E3AE1
 
62156000210A 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000212C 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000213D 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000220A 
INJECTION-PUMP ASSEMBLY
E3AF1
 
62156000222C 
INJECTION-PUMP ASSEMBLY
E3AF1
9 400 616 487 
62156000270A 
INJECTION-PUMP ASSEMBLY
E3AG1
9 400 616 488 
62156000280A 
INJECTION-PUMP ASSEMBLY
E3AG1
104303-5060  

104303-5200 
9 400 616 489 
62156000290A 
INJECTION-PUMP ASSEMBLY
E3AD1
9 400 616 490 
62156000300A 
INJECTION-PUMP ASSEMBLY
E3AD1
 
62156000193F 
INJECTION-PUMP ASSEMBLY
E3AE1
 
62156000203F 
INJECTION-PUMP ASSEMBLY
E3AE1
Back to top