104302-6470 ZEXEL 9 400 610 024 BOSCH INJECTION-PUMP ASSEMBLY 9400610024 1043026470 2811250100


 

Information injection-pump assembly

BOSCH 9 400 610 024 9400610024
ZEXEL 104302-6470 1043026470
TOYO-SHA 2811250100 2811250100
104302-6470 INJECTION-PUMP ASSEMBLY
Rating:
70
Buy INJECTION-PUMP ASSEMBLY 104302-6470 zexel genuine, new aftermarket engine parts with delivery

Service parts 104302-6470 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 104300-0560
3. GOVERNOR
4. SUPPLY PUMP 105248-0150
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105141-1900
11. Nozzle and Holder 2251-1210-01
12. Open Pre:MPa(Kqf/cm2) 12.7{130}
13. NOZZLE-HOLDER 105071-0570
14. NOZZLE 105000-1650
15. NOZZLE SET

Include in #1:

104302-6470 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
104302-6470 
9 400 610 024 
2811250100  TOYO-SHA
INJECTION-PUMP ASSEMBLY
S148 * K




Information:

The cylinder head is either water-cooled or air-cooled by fins in order to prevent overheating by the compression heat of the air compressor.The water-cooled type has coolant led from the oil cooler to cool cylinder head valves. Coolant is then returned to the rear end of the engine cylinder head.1.2 Pressure Governor
The pressure governor controls compressor operation to keep the air tank pressure within specified limits.To the high pressure valve of the diaphragm, the same air pressure as in the air tank acts always through the filter, thereby balancing with the adjusting spring force. When the pressure in the air tank increases to exceed that opening pressure of the high pressure valve, the air forces up the high pressure valve seat of the diaphragm. This causes increase of acting area so that the diaphragm moves up quickly to close the seat of the low pressure valve.When the low pressure valve is closed, air now flows through the valve body to force down the unloader valve of the air compressor, thereby stopping air supply to the air tank.As the air pressure in the air tank gradually drops, the diaphragm is forced down by the adjusting spring and the low pressure valve opens and the high pressure one closes. As a result, the air on the unloader side is exhausted through the exhaust hole and air supply to the air tank is resumed.2. Specifications
3. Service Standards
3.1 Service Standards Table
(1) Air Compressor (2) Pressure Governor 3.2 Tightening Torque Table
(1) Air compressor (2) Pressure governor 4. Special Tool
5. Service Procedure
5.1 Air Compressor
Removal and installation
The removal and installation procedures of the air compressor are same as those of the pump drive case. See Group 13 Fuel and Engine Control.Disassembly
Disassembly(1) Removal of suction valve holder Using special tool, Air Compressor Suction Valve Tool, remove the suction valve holder.(2) Removal of delivery valve holder (Air-cooled type only) Using special tool, Air Compressor Delivery Valve Tool, remove the delivery valve holder.(3) Removal of piston ring Using special tool, Piston Ring Tool, remove the piston ring.Inspection
Inspection(1) Piston to cylinder liner clearance Calculate the clearance and if it exceeds the limit, replace the piston or cylinder liner.(2) Piston ring to ring groove clearance Measure the clearance and if it exceeds the limit, replace the piston ring or piston. Measure over entire circumference of the piston.(3) Piston ring open end gap Fit the piston ring to a new cylinder liner or gauge and measure the open end gap. If the gap exceeds the limit, replace the ring. Push in the piston ring flat by the piston and measure.(4) Piston to piston pin clearance Calculate the clearance and if it exceeds the limit, replace the piston or piston pin.(5) Piston to connecting rod clearance Calculate the clearance and if it exceeds the limit, replace the piston pin or connecting rod.(6) Crankshaft pin to connecting rod bearing clearance Calculate the clearance and if it exceeds the limit, replace the bearing.(7) Connecting rod end play If the end play exceeds the limit,

Have questions with 104302-6470?





Group cross 104302-6470 ZEXEL

Ishikawajima-S 

 
131016460 
INJECTION-PUMP ASSEMBLY
LET852

Isuzu 

 
5156004610 
INJECTION-PUMP ASSEMBLY
2AB1

Toyo-Sha 

9 400 610 086 
22512501020 
INJECTION-PUMP ASSEMBLY
S126
9 400 616 416 
2801250103 
INJECTION-PUMP ASSEMBLY
S148
 
2711250103 
INJECTION-PUMP ASSEMBLY
S135
 
 

S148
104302-6470  
9 400 610 024 
2811250100 
INJECTION-PUMP ASSEMBLY
S148
9 400 610 302 
2281510101 
INJECTION-PUMP ASSEMBLY
S126
9 400 616 417 
2881510100 
INJECTION-PUMP ASSEMBLY
S148
Back to top