104302-6220 ZEXEL 9 400 616 414 BOSCH INJECTION-PUMP ASSEMBLY 9400616414 1043026220 2501250102


 

Information injection-pump assembly

BOSCH 9 400 616 414 9400616414
ZEXEL 104302-6220 1043026220
TOYO-SHA 2501250102 2501250102
104302-6220 INJECTION-PUMP ASSEMBLY
Rating:
51
Buy INJECTION-PUMP ASSEMBLY 104302-6220 zexel genuine, new aftermarket engine parts with delivery

Service parts 104302-6220 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 104300-0390
3. GOVERNOR
4. SUPPLY PUMP
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105141-2170
11. Nozzle and Holder 5701-1210-00
12. Open Pre:MPa(Kqf/cm2) 12.7{130}
13. NOZZLE-HOLDER 105071-0620
14. NOZZLE 105000-1130
15. NOZZLE SET

Include in #1:

104302-6220 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 616 414 9400616414
ZEXEL 104302-6220 1043026220
TOYO-SHA 2501250102 2501250102


Zexel num
Bosch num
Firm num
Name
104302-6220 
9 400 616 414 
2501250102  TOYO-SHA
INJECTION-PUMP ASSEMBLY
S111 K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2
Pre-stroke mm   1.95 1.9 2
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.2
Pump speed r/min   1150 1150 1150
Average injection quantity mm3/st.   37.5 36.5 38.5
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   5.4+-0.5
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   6 5 7
Max. variation between cylinders %   0 -14 14
Fixing the lever   *

Test data Ex:

Governor adjustment

Test data 104302-6220
N:Pump speed R:Rack position (mm) (1)Torque control stroke (2)Apply the torque control spring so that the fuel injection quantity passes through this point.
----------

----------

Speed control lever angle

Test data 104302-6220
F:Full speed I:Idle S:Stop (1)Set idling using the idle set spring.
----------

----------
a=27deg+-3deg b=30deg+-6deg c=(40deg)




Information:


Governor Linkage Adjustment
(1) Rod. (2) Nut. (3) Control lever. (4) Lever. (5) Pin. (6) High idle stop. (7) Locknut. (8) Low idle stop. (9) Locknut. (10) Decelerator treadle. (11) Floor plate. (12) Accelerator treadle. (13) Lever. (14) Rod. (15) Locknut. (16) Lever. (17) Locknut. (A) 9.7 1.5 mm (.38 .06 in). (B) 4.8 1.5 mm (.19 .06 in). (C) 38.1 1.5 mm (1.50 .06 in). (D) 60.5 3.0 mm (2.38 .12 in).Governor Linkage Adjustment
DO NOT USE control lever (3), or decelerator treadle (10) to shut OFF the engine.To shut engine OFF, pull up on accelerator treadle (12).1. Tighten nut (2) just enough so position of control lever (3) is not affected by the operation of the accelerator treadle (12) and decelerator treadle (10).2. With the parking brake ON and engine stopped, BE SURE disconnect switch is OFF.3. Remove pin (5).4. Loosen LOW IDLE stop (8) and HIGH IDLE stop (6) so they do not touch lever (13).5. Move control lever (3) to LOW IDLE position.6. Turn LOW IDLE stop (8) until it touches lever (13) and tighten locknut (9).7. Adjust length of rod (14) so distance from top of lever (16) to bottom of floor plate (11) is (C) 38.1 1.5 mm (1.50 .06 in) as shown.8. Loosen locknut (15) and adjust length of rod so top of decelerator treadle (10) is (B) 4.8 mm (.19 in) above floor plate (11) as shown. If machine is equipped with a thick floor insulation pad, (used with enclosed cab), adjust decelerator treadle (10) so top of treadle is (A) 9.7 1.5 mm (.38 .06 in) above top of floor plate and tighten locknut (15).9. Move control lever (3) to HIGH IDLE position.10. Turn HIGH IDLE stop (6) until it touches lever (13) and tighten locknut (7).11. Loosen locknut (17) and adjust accelerator treadle (12) so that distance from bottom of plate on treadle to top of floor plate (11) is (D) 60.5 3.0 mm (2.38 .12 in) as shown.12. Move lever (4) to HIGH IDLE position and adjust length of rod (1) so pin (5) can be installed.13. Install pin (5).
DO NOT adjust the linkage so the treadle can be used to shut off the engine. If the operator is in a standing position and places a foot on the treadle, the engine could be unexpectedly shut off, creating a situation where the machine can be difficult to control.
814B, 815B, 816B, 966D
1. Set governor shaft to the off position (approximately 35° right of twelve o'clock) and attach lever (1).2. Adjust cable assembly (2) to within 3 mm (.12 in) of the end of travel and tighten bulkhead (3) nuts to ... 100 15

Have questions with 104302-6220?





Group cross 104302-6220 ZEXEL

Isuzu 

 
 

2AB1

Toyo-Sha 

9 400 610 345 
3001250102 
INJECTION-PUMP ASSEMBLY
S88
104302-6220  
9 400 616 414 
2501250102 
INJECTION-PUMP ASSEMBLY
S111
 
2251250102 
INJECTION-PUMP ASSEMBLY
S126
 
 
INJECTION-PUMP ASSEMBLY
S100
 
3101250101 
INJECTION-PUMP ASSEMBLY
S100
 
 
INJECTION-PUMP ASSEMBLY
S135
Back to top