103682-0528 ZEXEL F 019 Z20 055 BOSCH INJECTION-PUMP ASSEMBLY f019z20055 1036820528 6166711623


 

Information injection-pump assembly

BOSCH F 019 Z20 055 f019z20055
ZEXEL 103682-0528 1036820528
KOMATSU 6166711623 6166711623
103682-0528 INJECTION-PUMP ASSEMBLY
Rating:
83
Buy INJECTION-PUMP ASSEMBLY 103682-0528 zexel genuine, new aftermarket engine parts with delivery

Service parts 103682-0528 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 103068-1174
3. GOVERNOR 105955-0095
4. SUPPLY PUMP 105235-1930
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0490
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2)
13. NOZZLE-HOLDER
14. NOZZLE
15. NOZZLE SET

Include in #1:

103682-0528 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
103682-0528 
103682-0529 
F 019 Z20 055 
6166711623  KOMATSU
INJECTION-PUMP ASSEMBLY
SDA12V17 * K 14BS INJECTION PUMP ASSY PE4-8Z PE




Information:


Install the pump cover onto the pump housing. Tighten the four middle bolts. Then, tighten the end bolts in a crisscross pattern. Tighten the bolts to a torque of 10.2 N m (90 lb in).Note: Make sure that the gasket is in place between the housing and the cover.
Repeat Step 1 and Step 2 in order to confirm the electrical connection for the pump coil was not damaged during the removal of the pump cover.
Install the oil inlet line adapter, inlet line, and harness connector to the pump.Note: After the HEUI pump is replaced or reassembled, the engine must be cranked for an extended length of time to fill the pump with oil.Note: Clear any diagnostic or event codes that activated during the initial start-up.
If the engine would not start before inspecting for debris and no debris was found in the HEUI pump, return to Step D in the diagnostic flow chart.If the engine would start before inspecting for debris and no debris was found in the HEUI pump, return to Step L in the diagnostic flow chart.If the pump is to be replaced, complete the checklist form in Special Instruction, REHS5031 that is provided with the service replacement part and insert the completed form back into the box containing the part that is being returned. Proceed to the section of this instruction titled "Oil Rail Cleaning Procedure" for the correct engine size that is being serviced.Oil Rail Cleaning Procedure For the C7 Engine
Illustration 12 g02702636
C7 Cylinder Head
Illustration 13 g02708256
The oil and fuel passages are the same for both the C7 and C9.
(6) Oil Rail for a HEUI fuel system
(7) Oil passage to injector bore
(8) Fuel passage
(9) Injector bore Note: Contain any oil and cleaner that will flow from the cylinder and the lines during the following process. Properly dispose of the oil and contaminated cleaner when work is complete.
Remove fuel injectors. Refer to Disassembly and Assembly for specific machine.
Install six plugs 9U-7080 Tapered Cap/Plug into the lower injector bores. The plugs will prevent oil, cleaners, and debris from entering the cylinders.
Remove the plugs from the front and rear of the cylinder head main oil gallery
Remove the pressure sensor from the cylinder head. Protect the sensor.
Clean out the two rail drain holes by removing their plugs and using the brake cleaner and long squirting straw to flush these passages to the oil rail.
Using the solvent gun with and without the

Have questions with 103682-0528?





Group cross 103682-0528 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 619 854 
6166711620 
INJECTION-PUMP ASSEMBLY
SDA12V17
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

 
6166711621 
INJECTION-PUMP ASSEMBLY
SDA12V17
9 400 616 368 
6166711622 
INJECTION-PUMP ASSEMBLY
SDA12V17
103682-0528  

103682-0529 
F 019 Z20 055 
6166711623 
INJECTION-PUMP ASSEMBLY
SDA12V17
 
6166711623 
INJECTION-PUMP ASSEMBLY
SDA12V170
Back to top