103662-3101 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1036623101 6162731571


 

Information injection-pump assembly

ZEXEL 103662-3101 1036623101
KOMATSU 6162731571 6162731571
103662-3101 INJECTION-PUMP ASSEMBLY
Rating:
73
Buy INJECTION-PUMP ASSEMBLY 103662-3101 zexel genuine, new aftermarket engine parts with delivery

Service parts 103662-3101 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 103066-8420
3. GOVERNOR 105455-1010
4. SUPPLY PUMP 105235-1781
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0200
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105111-4353
11. Nozzle and Holder 6162-13-3902
12. Open Pre:MPa(Kqf/cm2) 29.4{300}
13. NOZZLE-HOLDER 105041-7102
14. NOZZLE 105015-8330
15. NOZZLE SET

Include in #1:

103662-3101 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 103662-3101 1036623101
KOMATSU 6162731571 6162731571


Zexel num
Bosch num
Firm num
Name
103662-3101 
103662-3102 
 
6162731571  KOMATSU
INJECTION-PUMP ASSEMBLY
SA6D170 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-4-1500
Overflow valve   131425-2020
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.8 3.75 3.85
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   16.6
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   473 468 478
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Boost pressure kPa   50.7 50.7
Boost pressure mmHg   380 380
Injection quantity adjustment_02
Adjusting point   B
Rack position   9.2+-0.5
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   49 45 53
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   C
Rack position   18
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   482 477 487
Fixing the lever   *
Boost pressure kPa   50.7 50.7
Boost pressure mmHg   380 380
Boost compensator adjustment
Pump speed r/min   500 500 500
Rack position   14
Boost pressure kPa   9.3 9.3 9.3
Boost pressure mmHg   70 70 70
Boost compensator adjustment_02
Pump speed r/min   500 500 500
Rack position   18
Boost pressure kPa   41.3 38.6 44
Boost pressure mmHg   310 290 330

Test data Ex:

Governor adjustment

Test data 103662-3101
N:Pump speed R:Rack position (mm) (1)Notch: K (2)RACK LIMIT: RAL (3)Boost compensator stroke: BCL (4)Rack difference between N = N1 and N = N2
----------
K=11 RAL=20+0.2mm BCL=4+-0.1mm N1=1000r/min N2=700r/min
----------

Speed control lever angle

Test data 103662-3101
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=18deg+-5deg b=38deg+-5deg

Stop lever angle

Test data 103662-3101
N:Pump normal S:Stop the pump. (1)The clearance from the set screw must be aa. (2)Set screw at speed = bb, rack position = cc. (3)Use the pin above R = dd
----------
aa=2+1mm bb=100r/min cc=5mm dd=44mm
----------
a=20deg+-5deg b=40deg+-5deg

Timing setting

Test data 103662-3101
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(70deg)




Information:

1. Remove tachometer drive (3) from transfer pump cover (4).2. Remove bolts (1). Separate cover (4) and pump body (2). 3. Remove lip-type seal (6) from the cover. Remove plug (5), the seal, spring and plunger (bypass valve) from the cover. 4. Remove nut (10) from shaft (7). Remove gear (9) and key (11).5. Remove shaft (7) and gear (8) as a unit. Remove gear (8) from drive shaft (7) with a press.6. Remove idler gear (12). 7. Remove bushing (14), two lip-type seals and the bottom bearing from pump body (2).8. Remove check valve (13).Assemble Fuel Transfer Pump
1. Install bushing (4) in body (3) with Tooling (B). The bushing must be .80 .50 mm (.031 .020 in) below the (gear) surface of the body.2. Install the check valve in the body with Tooling (A).3. Install lip-type seal (5) with Tooling (C). Install the seal until it is 26.19 .13 mm (1.031 .005 in) from the bottom (drive gear) surface of body (3) and with the lip toward bushing (4) as shown.4. Install lip-type seal (6) with Tooling (D). Install the seal until it is 14.2 0.5 mm (.559 .020 in) from the bottom (drive gear) surface of body (3) and with the lip away from seal (5) as shown.5. Install bearing (7) in body (3) with Tooling (E). The bearing must be even with the bottom (drive gear) surface of the pump body. 6. Heat gear (8) to a maximum temperature of 315° C (600° F). Install gear (8) on shaft (11) until dimension (X) is 49.71 0.25 mm (1.957 .010 in).7. Install the drive shaft and gear in body (3). Install the key, gear (10) and nut (9). Tighten the nut to a torque of 30 7 N m (22 5 lb ft).8. Install idler gear (12) in body (3).9. Install lip-type seal (2) with Tooling (C). Install the seal until it is 22.61 .05 mm (.890 .002 in) from the top surface of cover (1) with the lip toward the inside as shown. 10. Install plunger (14) (bypass valve), spring (15) and seal and plug (13) in pump cover (1). Tighten plug (13) to a torque of 37 4 N m (27 3 lb ft).
Do not let the liquid gasket enter the pump during application or assembly.
11. Put 7M-7260 Liquid Gasket Material on the surface of cover (1). Install cover (1) on pump body (3). The drive shaft must turn freely after the bolts that hold the transfer pump together are tightened.12. Install the tachometer drive on cover (1).End By:a. install fuel transfer pump

Have questions with 103662-3101?





Group cross 103662-3101 ZEXEL

Komatsu 

 
6162731570 
INJECTION-PUMP ASSEMBLY
SA6D170
103662-3101  

103662-3102 
 
6162731571 
INJECTION-PUMP ASSEMBLY
SA6D170
9 400 610 289 
 
INJECTION-PUMP ASSEMBLY
SA6D170

Komatsu 

9 400 613 319 
6162731572 
INJECTION-PUMP ASSEMBLY
SA6D170
9 400 616 288 
6162731612 
INJECTION-PUMP ASSEMBLY
SA6D170A
F 019 Z10 617 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 618 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

 
6166711412 
INJECTION-PUMP ASSEMBLY
SA12V170
 
6166711413 
INJECTION-PUMP ASSEMBLY
SA12V170
 
 
INJECTION-PUMP ASSEMBLY
SA12V170

Komatsu 

9 400 616 289 
6166711414 
INJECTION-PUMP ASSEMBLY
SA12V170
 
6162731531 
INJECTION-PUMP ASSEMBLY
SA6D170A
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 616 290 
6162731632 
INJECTION-PUMP ASSEMBLY
SA6D160
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 616 291 
6162731634 
INJECTION-PUMP ASSEMBLY
SA6D160
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 516 
 
INJECTION-PUMP ASSEMBLY
SA6D170A

Komatsu 

9 400 613 462 
6162731491 
INJECTION-PUMP ASSEMBLY
SA6D170A
 
6162731640 
INJECTION-PUMP ASSEMBLY
SA6D170
 
 
INJECTION-PUMP ASSEMBLY
SA6D170

Komatsu 

9 400 616 292 
6162731641 
INJECTION-PUMP ASSEMBLY
SA6D170
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
SA6D170A

Komatsu 

9 400 612 537 
6162731510 
INJECTION-PUMP ASSEMBLY
SA6D170A
 
6162731460 
INJECTION-PUMP ASSEMBLY
SA6D170A
F 019 Z10 517 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

F 019 Z10 234 
6162731461 
INJECTION-PUMP ASSEMBLY
SA6D170A
9 400 616 293 
6162731462 
INJECTION-PUMP ASSEMBLY
SA6D170A
Back to top