101696-9830 ZEXEL 9 400 616 157 BOSCH INJECTION-PUMP ASSEMBLY 9400616157 1016969830 16713z6710


 

Information injection-pump assembly

BOSCH 9 400 616 157 9400616157
ZEXEL 101696-9830 1016969830
NISSAN-DIESEL 16713Z6710 16713z6710
101696-9830 INJECTION-PUMP ASSEMBLY
Rating:
43
Buy INJECTION-PUMP ASSEMBLY 101696-9830 zexel genuine, new aftermarket engine parts with delivery

Include in #1:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101696-9830 
9 400 616 157 
16713Z6710  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6T K




Information:


Illustration 1 g00564355
7W-2743 Electronic Speed Switch (ESS)
(1) Push button for Overspeed Verification
(2) Reset button
(3) Overspeed indicator lamp
(4) Seal screw plug for adjusting the engine overspeed
(5) Seal screw plug for adjusting the crank terminate speed
(6) Seal screw plug for adjusting the oil step pressure speed setting The procedure for the magnetic pickup test will determine if the operation of the magnetic pickup is correct.
Connect a 6V-7070 Digital Multimeter to the "COM" terminal and the "SIG" terminal. The terminals are (ESS-3)and (ESS-4) of the ESS. Set the meter voltage scale to a scale that is greater than 1.5 VAC. Start the engine. Run the engine at low idle or 600 rpm. Choose the one that is larger. If the voltage that is measured is 1.5 VAC or more, the operation of the magnetic pickup is correct. If the voltage is less than 1.5 VAC, go to Step 2.
Stop the engine. Disconnect the wiring for the magnetic pickup at the plug-in connector. Connect the voltmeter to the connector terminals of the magnetic pickup. Start the engine. Run the engine at low idle or 600 rpm. Choose the one that is larger. If the voltage that is measured is 1.5 VAC or more, repair the wiring that is between the magnetic pickup and the ESS. If the voltage is less than 1.5 VAC, go to Step 3.
Illustration 2 g00564913
Magnetic pickup
(1) Clearance
(2) Magnetic pickup
(3) Wires to the connector
(4) Locknut
(5) Flywheel housing
(6) Ring gear
Loosen locknut (4) and turn magnetic pickup (2) in the counterclockwise direction in order to remove magnetic pickup (2) from flywheel housing (5). Turn the flywheel until a gear tooth of ring gear (6) is directly in the center of the threaded hole for magnetic pickup (2). Install magnetic pickup (2) in flywheel housing (5).
Turn magnetic pickup (2) in the clockwise direction until the end of magnetic pickup (2) slightly touches the gear tooth. Turn the magnetic pickup for one-half turn in the counterclockwise direction in order to set correct clearance (1). Tighten locknut (4) to a torque of 45 7 N m (33 5 lb ft). Note: Do not allow the magnetic pickup to turn while the locknut is tightened.
Repeat Step 2. If the voltage is still less than 1.5 VAC, replace the magnetic pickup.

Have questions with 101696-9830?





Group cross 101696-9830 ZEXEL

Nissan-Diesel 

 
16713Z6762 
INJECTION-PUMP ASSEMBLY
FE6TB

China 

9 400 616 156 
 
INJECTION-PUMP ASSEMBLY
6102BQ

Nissan-Diesel 

9 400 610 820 
16713Z6709 
INJECTION-PUMP ASSEMBLY
FE6T
101696-9830  
9 400 616 157 
16713Z6710 
INJECTION-PUMP ASSEMBLY
FE6T
F 01G 09U 06L 
16713Z6768 
INJECTION-PUMP ASSEMBLY
FE6TA
 
16713Z6769 
INJECTION-PUMP ASSEMBLY
FE6TA
F 01G 09U 06M 
16713Z6770 
INJECTION-PUMP ASSEMBLY
FE6TB
 
16713Z6771 
INJECTION-PUMP ASSEMBLY
FE6TB
F 01G 09U 06N 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 619 954 
16713Z6800 
INJECTION-PUMP ASSEMBLY
FE6TA
F 01G 09U 06P 
16713Z6866 
INJECTION-PUMP ASSEMBLY
FE6TA
F 01G 09U 06R 
 
INJECTION-PUMP ASSEMBLY
FE6TA

Nissan-Diesel 

9 400 616 158 
16713Z6962 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 619 955 
16713Z6801 
INJECTION-PUMP ASSEMBLY
FE6TA
F 01G 09U 06S 
16713Z6867 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 616 159 
16713Z6963 
INJECTION-PUMP ASSEMBLY
FE6TA
Back to top