101696-9741 ZEXEL 9 400 616 155 BOSCH INJECTION-PUMP ASSEMBLY 9400616155 1016969741 16713z6772


 

Information injection-pump assembly

BOSCH 9 400 616 155 9400616155
ZEXEL 101696-9741 1016969741
NISSAN-DIESEL 16713Z6772 16713z6772
101696-9741 INJECTION-PUMP ASSEMBLY
Rating:
32
Buy INJECTION-PUMP ASSEMBLY 101696-9741 zexel genuine, new aftermarket engine parts with delivery

Service parts 101696-9741 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101069-5050
3. GOVERNOR 105921-9430
4. SUPPLY PUMP 105220-7010
5. AUTOM. ADVANCE MECHANIS 105672-0290
6. COUPLING PLATE 105662-1380
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6740
11. Nozzle and Holder 16600-Z5607
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4650
14. NOZZLE 105017-9170
15. NOZZLE SET

Include in #1:

101696-9741 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 616 155 9400616155
ZEXEL 101696-9741 1016969741
NISSAN-DIESEL 16713Z6772 16713z6772


Zexel num
Bosch num
Firm num
Name
101696-9741 
9 400 616 155 
16713Z6772  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6T K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   134424-1520
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   13.6
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   92.5 90.5 94.5
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.7+-0.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   17 15.2 18.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(13.6)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   92.5 91.5 93.5
Basic   *
Fixing the lever   *
Boost pressure kPa   42 42
Boost pressure mmHg   315 315
Injection quantity adjustment_04
Adjusting point   B
Rack position   (R1+0.3) +0.05-0. 15
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   99.5 96.3 102.7
Fixing the lever   *
Boost pressure kPa   42 42
Boost pressure mmHg   315 315
Injection quantity adjustment_05
Adjusting point   C
Rack position   R2(R1-0. 2)
Pump speed r/min   420 420 420
Average injection quantity mm3/st.   80 76.8 83.2
Fixing the lever   *
Boost pressure kPa   42 42
Boost pressure mmHg   315 315
Injection quantity adjustment_06
Adjusting point   D
Rack position   R2-2
Pump speed r/min   420 420 420
Average injection quantity mm3/st.   43.4 41.4 45.4
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_07
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   105 105 125
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   420 420 420
Rack position   R2-2
Boost pressure kPa   12 10.7 13.3
Boost pressure mmHg   90 80 100
Boost compensator adjustment_02
Pump speed r/min   420 420 420
Rack position   R2(R1-0. 2)
Boost pressure kPa   28.7 28.7 28.7
Boost pressure mmHg   215 215 215
Timer adjustment
Pump speed r/min   1170--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1120
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   3 2.5 3.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101696-9741
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Boost compensator stroke: BCL
----------
T1=M68 BCL=2+-0.1mm
----------

Speed control lever angle

Test data 101696-9741
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=36mm
----------
a=26deg+-5deg b=39deg+-3deg

Stop lever angle

Test data 101696-9741
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa
----------
aa=42mm
----------
a=40deg+-5deg b=27deg+-5deg

Timing setting

Test data 101696-9741
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(60deg)




Information:


Install Tooling (E). Tighten Tooling (E) to a torque of 9 1 N m (80 9 lb in).Note: The pump will not function while Tooling (E) is installed. Running the fuel injection pump with the tooling installed will result in pump damage and system contamination.
Illustration 6 g02025176
Disconnect harness assemblies (3).
Remove nut (5) and remove the clamp assembly. Discard the clamp assembly.
Loosen nuts (4) and (7). Remove the fuel line and discard the fuel line.
Disconnect hose assembly (6).
Illustration 7 g02029098
Disconnect tube assemblies (9).
Disconnect hose assemblies (10) and (11).
Remove bolts (8).
Illustration 8 g02029093
Disconnect tube assembly (12).
Illustration 9 g02025262
Remove bolts (13) and remove fuel pump (14).Installing the Fuel Injection Pump
Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.
Illustration 10 g02385860
Service replacement pump
Note: Service replacement pump is shipped pinned with warning tag (Z) installed under pinch bolt (E).
Illustration 11 g02025262
Position fuel pump (14) and install bolts (13).
Illustration 12 g02029093
Connect tube assembly (12).
Illustration 13 g02029098
Install bolts (8).
Connect tube assembly (9) and connect both hose assemblies (10) and (11).
Illustration 14 g02025176Note: During installation, make sure that the fuel line caps remain in position until the fuel line is positioned near the corresponding ports in order to prevent contamination. Ensure that the areas around the rail and fuel lines are thoroughly clean before continuing this procedure. If any parts are worn or damaged, use new parts for replacement. Cleanliness is an important factor. Ensure that no debris gets introduced into the fuel system during the installation procedure. If any parts are worn or damaged, use new parts for replacement.
Connect harness assemblies (3).
Install a new fuel line. Hand tighten nuts (4) and (7).
Position the clamp assembly and install nut (5). Hand tighten the nut. Failure to place the grommet correctly on the fuel line could result in a failed fuel line.Note: Ensure that the fuel lines are centered in the nuts prior to tightening. Do not use excessive force or bending in order to assemble the fuel lines.
Tighten nut (4) at the fuel rail to a torque of 27 3 N m (239 27 lb in).
Tighten nut (7) to a torque of 27 3 N m (239 27 lb in).
Tighten nut (5) to a torque of 12 3 N m (105 27 lb in).
Illustration 15 g02351995
Remove Tooling (E) and warning tag (Z).Note: The pump will not function while Tooling (E) is installed. Running the fuel injection pump with the tooling installed will result in pump damage and system contamination.
Illustration 16 g02351981
Install O-ring seal (2) and plug (1). Tighten the plug to a torque of 9 1 N m (80 9 lb in).
Illustration 17 g02112896
Remove all tooling. Reinstall plug (X) into the timing hole that is located in the flywheel housing.
Connect Caterpillar Electronic Technician (ET). Perform a “Fuel System Functional Test ”and a “Fuel System Verification Test”.

Have questions with 101696-9741?





Group cross 101696-9741 ZEXEL

Nissan-Diesel 

 
16713Z6703 
INJECTION-PUMP ASSEMBLY
FE6TA
 
16713Z6704 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 610 817 
16713Z6705 
INJECTION-PUMP ASSEMBLY
FE6TB
 
16713Z6706 
INJECTION-PUMP ASSEMBLY
FE6TB
 
16713Z6711 
INJECTION-PUMP ASSEMBLY
FE6T
101696-9741  
9 400 616 155 
16713Z6772 
INJECTION-PUMP ASSEMBLY
FE6T
 
16713Z6712 
INJECTION-PUMP ASSEMBLY
FE6T
9 400 610 818 
 
INJECTION-PUMP ASSEMBLY
FE6T

Nissan-Diesel 

9 400 612 213 
16713Z6775 
INJECTION-PUMP ASSEMBLY
FE6T

China 

9 400 612 193 
 
INJECTION-PUMP ASSEMBLY
6102BQ

Nissan-Diesel 

9 400 610 819 
16713Z6719 
INJECTION-PUMP ASSEMBLY
FE6TA
 
16713Z6760 
INJECTION-PUMP ASSEMBLY
FE6TA
F 019 Z20 485 
16713Z6761 
INJECTION-PUMP ASSEMBLY
FE6TB
Back to top