101695-3600 ZEXEL F 019 Z10 184 BOSCH INJECTION-PUMP ASSEMBLY f019z10184 1016953600 6206711730


 

Information injection-pump assembly

BOSCH F 019 Z10 184 f019z10184
ZEXEL 101695-3600 1016953600
KOMATSU 6206711730 6206711730
101695-3600 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 101695-3600 zexel genuine, new aftermarket engine parts with delivery

Service parts 101695-3600 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101069-9520
3. GOVERNOR 105400-7560
4. SUPPLY PUMP 105220-5610
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4100
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105048-3010
14. NOZZLE 105017-0080
15. NOZZLE SET

Include in #1:

101695-3600 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101695-3600 
F 019 Z10 184 
6206711730  KOMATSU
INJECTION-PUMP ASSEMBLY
6D95L * K




Information:

Start By:a. remove rocker arm assemblies and push rods1. Disconnect the governor control linkage. See the 3114 & 3116 Engines Governor Service Manual, Form No. SENR6454.
Do not move the fuel control linkage or the injector racks with out the Injector Compressors [Tool (A)] installed. Damage to the fuel injectors can result. After installation of Tool (A), tap on the top of each fuel injector lightly with a rubber mallet to prevent any binding or side loading in the fuel injectors.
2. When removing the fuel control linkage with the fuel injectors in place, install Tool (A) on the fuel injectors, and slightly compress the injector springs.3. Remove four bolts (1) and fuel control linkage (2). The following steps are for the installation of the fuel control linkage.4. Be sure the two screws in each inboard bracket are loose.5. Put fuel control linkage in position on the cylinder head assembly. Be sure all injector racks are engaged and the small dowel in each mounting bracket is in the proper position before tightening bolts (1). Install four bolts (1), and tighten them as follows: a. Tighten the two outer bearing bracket mounting bolts.b. Tighten the inner bearing bracket(s) mounting bolt(s).c. Position the inner bearing(s) to allow free rotation of the rack control rod.d. Tighten the two screws in on each inner bracket(s) to a torque of 3.5 0.2 N m (31 2 lb in).e. The control rod must rotate when a force of 4.4 N (1 lb) or less is applied to control lever (3) in the direction indicated by arrows.6. Connect the governor control linkage. See the 3114 & 3116 Engines Governor Service Manual, Form No. SENR6454.7. After installation of the rocker arm assemblies and push rods, Check and/or adjust the following: Injector Synchronization, Fuel Setting, Fuel Timing, Valve Lash. See the 3114 & 3116 Diesel Truck Engines Systems Operation Testing & Adjusting module, Form No. SENR6437 to check and/or adjust the above items.End By:a. install rocker arm assemblies and push rods

Have questions with 101695-3600?





Group cross 101695-3600 ZEXEL

Komatsu 

101695-3600  
F 019 Z10 184 
6206711730 
INJECTION-PUMP ASSEMBLY
6D95L
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 616 120 
6206711530 
INJECTION-PUMP ASSEMBLY
6D95L
F 019 Z10 615 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 616 121 
6206711252 
INJECTION-PUMP ASSEMBLY
6D95L
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 610 338 
6206711540 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 611 834 
6206711921 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 616 122 
6206711912 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 616 123 
6207711812 
INJECTION-PUMP ASSEMBLY
S6D95L
9 400 611 612 
6207711911 
INJECTION-PUMP ASSEMBLY
S6D95L
9 400 611 269 
6207711931 
INJECTION-PUMP ASSEMBLY
S6D95L
 
6207711970 
INJECTION-PUMP ASSEMBLY
S6D95L
Back to top