101693-9930 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016939930 16713z6117


 

Information injection-pump assembly

ZEXEL 101693-9930 1016939930
NISSAN-DIESEL 16713Z6117 16713z6117
101693-9930 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 101693-9930 zexel genuine, new aftermarket engine parts with delivery

Service parts 101693-9930 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101069-3990
3. GOVERNOR 105921-7070
4. SUPPLY PUMP 105220-7010
5. AUTOM. ADVANCE MECHANIS 105672-0300
6. COUPLING PLATE 105662-1380
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7120
11. Nozzle and Holder 16600-Z5578
12. Open Pre:MPa(Kqf/cm2) 16.7{170}/21.6{220}
13. NOZZLE-HOLDER 105030-4140
14. NOZZLE 105015-8680
15. NOZZLE SET

Include in #1:

101693-9930 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101693-9930 1016939930
NISSAN-DIESEL 16713Z6117 16713z6117


Zexel num
Bosch num
Firm num
Name
101693-9930 
101693-9990 
 
16713Z6117  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6TA * K 14BF PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   134424-1520
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   13
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   96.7 94.7 98.7
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   8.6 6.8 10.4
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(13)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   96.7 95.7 97.7
Basic   *
Fixing the lever   *
Boost pressure kPa   29.3 29.3
Boost pressure mmHg   220 220
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.05
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   102.5 99.3 105.7
Fixing the lever   *
Boost pressure kPa   29.3 29.3
Boost pressure mmHg   220 220
Injection quantity adjustment_05
Adjusting point   C
Rack position   R2(R1+1)
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   101.9 98.7 105.1
Fixing the lever   *
Boost pressure kPa   29.3 29.3
Boost pressure mmHg   220 220
Injection quantity adjustment_06
Adjusting point   D
Rack position   R2-2.1
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   58 54.8 61.2
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_07
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   89 89 109
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   350 350 350
Rack position   R2-2.1
Boost pressure kPa   4 2.7 5.3
Boost pressure mmHg   30 20 40
Boost compensator adjustment_02
Pump speed r/min   350 350 350
Rack position   R2(R1+1)
Boost pressure kPa   16 16 16
Boost pressure mmHg   120 120 120
Timer adjustment
Pump speed r/min   1170--
Advance angle deg.   0 0 0
Load   3/4
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1120
Advance angle deg.   0.5
Load   3/4
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   3 2.5 3.5
Load   4/4
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101693-9930
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Boost compensator stroke: BCL
----------
T1=H81 BCL=2.1+-0.1mm
----------

Speed control lever angle

Test data 101693-9930
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=39mm
----------
a=20deg+-5deg b=39deg+-3deg

Stop lever angle

Test data 101693-9930
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa
----------
aa=42mm
----------
a=40deg+-5deg b=25deg+-5deg

0000001501 RACK SENSOR

Test data 101693-9930
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack limit adjustment (1)Fix the rack at the rack limit position Ra. (2)Install the shim (D) to the rod (C) and tighten nut (E). (3)Select a shim (D) so that the distance between the end surface of the pump and the nut (E) is L. (4)Release the rack fixing and mount the joint (B) and fix. (5)At this time, confirm that the shim (D) does not interfere with the joint (B). 2. Rack sensor adjustment (-0420) (1)Screw in the bobbin (A) until it contacts the joint (B). (2)Fix the speed control lever at the full side. (3)Set the speed to N1 r/min. (4)Adjust the depth that the bobbin (A) is screwed in so that the control unit's rack sensor output voltage is VR+-0.02 V, then tighten the nut (F). (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
L=33-0.2mm N1=700r/min Ra=R1(13)mm
----------

0000001601 LEVER

Test data 101693-9930
(a) Speed lever (B) Accelerator lever (C) Accelerator lever stopper bolt 1. Accelerator lever setting method With the speed lever in the idling position, back off the accelerator lever stopper bolt L1 from where it contacts point a. (Back off 1+0.5 turns and set.)
----------
L1=1+0.5mm
----------

Timing setting

Test data 101693-9930
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(60deg)




Information:

Start By:a. remove fuel injection linesb. remove rack actuator package
Out Of Chassis
In Chassis1. Remove the plug, and move the rack until tool (A) can be installed to hold the rack in the center position. The rack must be in the center position to remove the fuel injection pumps.
To prevent possible personal injury carefully follow the steps below.
2. Put tooling (B), except for the 8S4613 Wrench, in position on the fuel pump housing as shown. Lower the handle to center the adjusting screw with the fuel line seat. With the handle down in the locked position, the adjusting screw must just be in contact with fuel line seat (1). If force is needed to lower the handle or there is a gap, remove the tooling, and make an adjustment to the screw.3. Loosen bushing (2) 1/4 of a turn.4. Put tooling (B) in position on the pump housing with the handle down in the locked position as shown.5. Remove bushing (2) from the pump housing.6. Carefully and slowly lift the handle to release the spring force. Remove the tooling. 7. Install tool (C) on fuel pump (4) as shown.8. Remove seal (3) and fuel pump (4) from the fuel pump housing. 9. Remove spacers (5) from the pump housing. There must be a pump installed on either side of the pump to be removed to install tooling (B). If there is no pump, take a pump already removed, and remove the spring so there will be no spring force, and install it in the pump housing. See Install Fuel Pump. Spacers (5) are the same thickness for each fuel injection pump so they can be mixed. The fuel injection pump plungers and barrels are sets and cannot be mixed.Install Fuel Injection Pumps
1. Install spacers (5) in the fuel pump housing.2. Move the rack until tool (A) can be installed to hold the rack in the center position. The rack must be in the center position to install the fuel injection pumps.3. Install a fuel pump without its spring so that tool (B) can be installed. See Step 5 for correct fuel pump installation. 4. Install tool (C) on the bonnet of the fuel pump as shown.5. Install the fuel pump in the pump housing with the saw cut (slot) (9) in the gear in alignment with small pin (6) in the lifter assembly and groove (8) in the barrel in alignment with large pin (7) in the pump housing. 6. Install the seal and bushing (2) on the fuel pump.7. Put tooling (B) in position on the fuel pump housing as shown.8. Lower the handle slowly and carefully. If the fuel pump is not installed correctly, the handle will not go all the way down. Do not try to use force on it. Remove and install the tooling and the fuel pump again.9. Make sure the seal is in its correct position, and start to tighten bushing (2). Remove the tooling, and tighten the bushing to a torque of

Have questions with 101693-9930?





Group cross 101693-9930 ZEXEL

Nissan-Diesel 

 
16713Z6073 
INJECTION-PUMP ASSEMBLY
FE6TB
9 400 616 082 
1671395209 
INJECTION-PUMP ASSEMBLY
NE6T
 
16713Z6116 
INJECTION-PUMP ASSEMBLY
FE6T
101693-9930  

101693-9990 
 
16713Z6117 
INJECTION-PUMP ASSEMBLY
FE6TA
 
16713Z6118 
INJECTION-PUMP ASSEMBLY
FE6TB
 
16713Z6110 
INJECTION-PUMP ASSEMBLY
FE6B
 
16713Z6111 
INJECTION-PUMP ASSEMBLY
FE6T
9 400 616 083 
16713Z6112 
INJECTION-PUMP ASSEMBLY
FE6T
9 400 616 084 
16713Z6161 
INJECTION-PUMP ASSEMBLY
FE6T
9 400 616 085 
16713Z6162 
INJECTION-PUMP ASSEMBLY
FE6TA
Back to top