101693-9810 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016939810 16713z6062


 

Information injection-pump assembly

ZEXEL 101693-9810 1016939810
NISSAN-DIESEL 16713Z6062 16713z6062
101693-9810 INJECTION-PUMP ASSEMBLY
Rating:
17
Buy INJECTION-PUMP ASSEMBLY 101693-9810 zexel genuine, new aftermarket engine parts with delivery

Service parts 101693-9810 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101069-3660
3. GOVERNOR 105921-6800
4. SUPPLY PUMP 105220-7050
5. AUTOM. ADVANCE MECHANIS 105614-3321
6. COUPLING PLATE 105661-0401
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-5630
11. Nozzle and Holder 16600-Z5570
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105031-4650
14. NOZZLE 105015-7370
15. NOZZLE SET

Include in #1:

101693-9810 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101693-9810 1016939810
NISSAN-DIESEL 16713Z6062 16713z6062


Zexel num
Bosch num
Firm num
Name
101693-9810 
 
16713Z6062  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6T * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   12.5
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   83.7 82.1 85.3
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   9.5 7.7 11.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.5)
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   83.7 82.7 84.7
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.55
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   68.7 66.7 70.7
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   85 85 105
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1050--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1000
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1500
Advance angle deg.   2 1.5 2.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101693-9810
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT
----------
T1=C35
----------

Speed control lever angle

Test data 101693-9810
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=100mm
----------
a=26.5deg+-5deg b=39deg+-3deg

Stop lever angle

Test data 101693-9810
N:Pump normal S:Stop the pump.
----------

----------
a=20deg+-5deg b=40deg+-5deg

Timing setting

Test data 101693-9810
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(60deg)




Information:

Battery
Never disconnect any charging unit circuit or battery circuit cable from battery when the charging unit is operated. A spark can cause an explosion from the flammable vapor mixture of hydrogen and oxygen that is released from the electrolyte through the battery outlets. Injury to personnel can be the result.
The battery circuit is an electrical load on the charging unit. The load is variable because of the condition of the charge in the battery. Damage to the charging unit can result if the connections (either positive or negative) between the battery and charging unit are broken while the charging unit is in operation. This is because the battery load is lost and there is an increase in charging voltage. High voltage can damage, not only the charging unit, but also the regulator and other electrical components.Use the 6V4930 Battery Load Tester, the 8T0900 Clamp-On Ammeter and the 6V7070 Multimeter to load test a battery that does not hold a charge when in use. See Special Instruction, Form No. SEHS8268 for the correct procedure and specifications to use.Charging System
The condition of charge in the battery at each regular inspection will show if the charging system operates correctly. An adjustment is necessary when the battery is constantly in a low condition of charge or a large amount of water is needed (more than one ounce of water per cell per week or per every 100 service hours).When it is possible, make a test of the charging unit and voltage regulator on the engine, and use wiring and components that are a permanent part of the system. Off-engine (bench) testing will give a test of the charging unit and voltage regulator operation. This testing will give an indication of needed repair. After repairs are made, again make a test to give proof that the units are repaired to their original condition of operation.Before the start of on-engine testing, the charging system and battery must be checked as shown in the Steps that follow:1. Battery must be at least 75% (1.225 Sp.Gr.) fully charged and held tightly in place. The Battery holder must not put too much stress on the battery.2. Cables between the battery, starter and engine ground must be the correct size. Wires and cables must be free of corrosion and have cable support clamps to prevent stress on battery connections (terminals).3. Leads, junctions, switches, and panel instruments that have direct relation to the charging circuit must give correct circuit control.4. Inspect the drive components for the charging unit to be sure they are free of grease and oil and have the ability to operate the charging unit.Alternator Regulator Adjustment (Delco-Remy)
When an alternator is charging the battery too much or not enough, the charging rate of the alternator should be checked. Make reference to the Specifications module to find all testing specifications for the alternators and regulators.
5N5692 Alternator
(1) Ground terminal. (2) Pulley nut.No adjustment can be made to change the rate of charge on the alternator regulators. If rate of

Have questions with 101693-9810?





Group cross 101693-9810 ZEXEL

F 019 Z10 846 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 794 
16713Z6063 
INJECTION-PUMP ASSEMBLY
FE6T
101693-9810  
 
16713Z6062 
INJECTION-PUMP ASSEMBLY
FE6T
9 400 616 078 
16713Z6078 
INJECTION-PUMP ASSEMBLY
FE6T
 
16713Z6107 
INJECTION-PUMP ASSEMBLY
FE6T
9 400 610 333 
1671395208 
INJECTION-PUMP ASSEMBLY
NE6T
9 400 616 079 
16713Z6066 
INJECTION-PUMP ASSEMBLY
FE6T
9 400 616 080 
16713Z6067 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 616 081 
16713Z6068 
INJECTION-PUMP ASSEMBLY
FE6TB
 
16713Z6071 
INJECTION-PUMP ASSEMBLY
FE6T
 
16713Z6072 
INJECTION-PUMP ASSEMBLY
FE6TA
Back to top