101693-9361 ZEXEL F 019 Z10 839 BOSCH INJECTION-PUMP ASSEMBLY f019z10839 1016939361 16800z5517


 

Information injection-pump assembly

BOSCH F 019 Z10 839 f019z10839
ZEXEL 101693-9361 1016939361
NISSAN-DIESEL 16800Z5517 16800z5517
101693-9361 INJECTION-PUMP ASSEMBLY
Rating:
20
Buy INJECTION-PUMP ASSEMBLY 101693-9361 zexel genuine, new aftermarket engine parts with delivery

Service parts 101693-9361 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101069-3770
3. GOVERNOR 105921-4461
4. SUPPLY PUMP 105220-7060
5. AUTOM. ADVANCE MECHANIS 105690-0210
6. COUPLING PLATE 105661-0800
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7120
11. Nozzle and Holder 16600Z5578
12. Open Pre:MPa(Kqf/cm2) 16.7(170)/21.6(220)
13. NOZZLE-HOLDER 105030-4140
14. NOZZLE 105015-8680
15. NOZZLE SET

Include in #1:

101693-9361 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101693-9361 
F 019 Z10 839 
16800Z5517  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6TA * K




Information:

1. Remove oil filter elements (1). 2. Remove two bolts (2).3. Remove four bolts (3).4. Remove six bolts (4) then remove oil filter base, gaskets and o-rings. The following steps are for the installation of the oil filter and oil filter base. Position gaskets and install all bolts finger tight before tightening to the standard torque.5. Be sure the o-rings are in place on oil filter base. Position gaskets and oil filter base, then install bolts (4).6. Install bolts (3).7. Position gasket and install bolts (2). Then tighten all the bolts to standard torque.8. Install oil filter elements (1).Oil Filter Base, Disassemble And Assemble
Start By:a. remove oil filter base 1. Remove the o-rings and remove bolt (1). 2. Remove relief valve group (2). 3. Remove four bolts and remove covers (3). Remove oil cooler by-pass valve (5), oil cooler by-pass valve spring (4) and spool (6). 4. Remove plug (7) and remove oil filter by-pass valve (8). The following steps are for the assembly of the oil filter base.5. Install by-pass valve (8) and plug (7).6. Install oil cooler by-pass valve (5), oil pump by-pass valve (6) and spring (4), then position covers (3) and install bolts.7. Position relief valve group (2) and install bolt (1). Install o-ring seals.End By:a. install oil filter base

Have questions with 101693-9361?





Group cross 101693-9361 ZEXEL

Nissan-Diesel 

 
16713Z5860 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z5871 
INJECTION-PUMP ASSEMBLY
FE6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

F 019 Z10 837 
16713Z5870 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16800Z5514 
INJECTION-PUMP ASSEMBLY
FE6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

F 019 Z10 838 
16800Z5516 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16800Z5515 
INJECTION-PUMP ASSEMBLY
FE6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

101693-9361  
F 019 Z10 839 
16800Z5517 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z5876 
INJECTION-PUMP ASSEMBLY
FE6T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16800Z5560 
INJECTION-PUMP ASSEMBLY
FE6T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16800Z5561 
INJECTION-PUMP ASSEMBLY
FE6T
Back to top