101692-3112 ZEXEL 9 400 610 216 BOSCH INJECTION-PUMP ASSEMBLY 9400610216 1016923112 6207711320


 

Information injection-pump assembly

BOSCH 9 400 610 216 9400610216
ZEXEL 101692-3112 1016923112
KOMATSU 6207711320 6207711320
101692-3112 INJECTION-PUMP ASSEMBLY
Rating:
51
Buy INJECTION-PUMP ASSEMBLY 101692-3112 zexel genuine, new aftermarket engine parts with delivery

Service parts 101692-3112 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101069-9210
3. GOVERNOR 105400-3301
4. SUPPLY PUMP 105220-5280
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4110
11. Nozzle and Holder 6207-11-3100
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105048-3060
14. NOZZLE 105017-0090
15. NOZZLE SET

Include in #1:

101692-3112 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 216 9400610216
ZEXEL 101692-3112 1016923112
KOMATSU 6207711320 6207711320


Zexel num
Bosch num
Firm num
Name
101692-3112 
101692-3960 
9 400 610 216 
6207711320  KOMATSU
INJECTION-PUMP ASSEMBLY
S6D95L * K 14BE PE6A PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Rack position
Point A
  R=A
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.8
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   42.5 41.5 43.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   10.4+-0. 5
Pump speed r/min   425 425 425
Average injection quantity mm3/st.   12.5 11.5 13.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101692-3112
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)The torque control spring must does not have a set force. (3)RACK CAP: R1 (4)Rack difference between N = N1 and N = N2
----------
K=4 R1=(17.5)mm N1=1100r/min N2=700r/min
----------

Speed control lever angle

Test data 101692-3112
F:Full speed I:Idle S:Stop
----------

----------
a=9deg+-5deg b=32deg+-3deg c=35deg+-5deg

Timing setting

Test data 101692-3112
(1)Pump vertical direction (2)Position of key groove at No 1 cylinder's beginning of injection (3)Stamp aligning marks on the pump housing flange. (4)- (5)-
----------

----------
a=59deg36min+-3deg b=0deg24min+-30min




Information:

Introduction
The objective of this topic is to assist users in establishing a Preventive Maintenance Program for Standby Generator Sets or as an aid in evaluating their present programs.Standby Generator Sets may not be needed very often, but when they are, it is usually under emergency conditions. Maintenance of these standby units is very important. They must always be in excellent operating condition, ready to work under load at any time.Establishing a Preventive Maintenance Program will provide maximum availability of a standby generator set when needed, longer engine and generator life, and a minimum of expensive repairs.The recommended WEEKLY maintenance checks can be performed by an operator. The checks consist of basic maintenance requirements to ensure the standby generator set will be ready for immediate use should the need arise.All YEARLY and THREE YEAR maintenance should be performed by an authorized mechanic or your Caterpillar dealer. These checks and maintenance requirements will require that the standby generator be run under load conditions, and may require special test equipment.These guidelines are to be used with the information contained in the Operation and Maintenance sections of this manual. The Operation and Maintenance sections of the manual will provide the necessary information on how to perform the checks and routine maintenance.Refer to the Generator and Engine Service Manuals and Recommended Preventive Maintenance Schedules for Standby Generator Sets, SEBU6042 for additional information, or contact your Caterpillar dealer for assistance.Inspection and Maintenance Agreements
Your Caterpillar dealer can establish an Inspection and Preventive Maintenance Program for your generator set to provide maximum reliability, increased engine and generator life, and minimize expensive repairs. Contact your Caterpillar dealer for details.General Recommendations
Safety
The stop-manual-automatic switch on the cranking panel must be set at STOP position when performing maintenance or repair work on a standby generator set. This prevents the unit from starting if a power failure or voltage drop should occur while working on the unit.To prevent personal injury due to accidental starting of the engine, disconnect the batteries or disable the starting system before doing maintenance or repair work.Lock out all switch gear and automatic transfer switches associated with the generator while performing any generator maintenance or repairs. Make sure no shock hazard exists.Failure to comply could result in personal injury or death.
Always make repairs with the engine stopped and the starting system disabled. When servicing the generator, make sure that switch gear and automatic transfer switches will not present a shock hazard. Lock them out on the generator being serviced.Record Keeping
Maintain a log or record keeping system to document all gauge readings, problems, repairs, and maintenance performed on the equipment.Space Heaters
Moisture is a natural enemy of generators and all electrical equipment. Every effort must be made to keep the generator as dry as possible. Space heaters should be operated inside the generator when it is not in use to maintain the integrity of the generator windings.

Have questions with 101692-3112?





Group cross 101692-3112 ZEXEL

Komatsu 

 
6206711230 
INJECTION-PUMP ASSEMBLY
6D95L
101692-3112  

101692-3960 
9 400 610 216 
6207711320 
INJECTION-PUMP ASSEMBLY
S6D95L
 
6206711120 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 616 024 
6206711330 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 610 299 
6207711330 
INJECTION-PUMP ASSEMBLY
S6D95L
9 400 616 025 
6207711420 
INJECTION-PUMP ASSEMBLY
S6D95L
9 400 610 217 
6206711420 
INJECTION-PUMP ASSEMBLY
6D95L
 
6207711370 
INJECTION-PUMP ASSEMBLY
S6D95L
 
6206711260 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 616 026 
6206711331 
INJECTION-PUMP ASSEMBLY
6D95L
Back to top