101692-3070 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016923070 6207711310


 

Information injection-pump assembly

ZEXEL 101692-3070 1016923070
KOMATSU 6207711310 6207711310
101692-3070 INJECTION-PUMP ASSEMBLY
Rating:
47
Buy INJECTION-PUMP ASSEMBLY 101692-3070 zexel genuine, new aftermarket engine parts with delivery

Service parts 101692-3070 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101069-9110
3. GOVERNOR 105400-3010
4. SUPPLY PUMP 105220-5280
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4110
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105048-3060
14. NOZZLE 105017-0090
15. NOZZLE SET

Include in #1:

101692-3070 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101692-3070 1016923070
KOMATSU 6207711310 6207711310


Zexel num
Bosch num
Firm num
Name
101692-3070 
 
6207711310  KOMATSU
INJECTION-PUMP ASSEMBLY
S6D95L * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.6
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   40.4 39.4 41.4
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   10.5+-0. 5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   12.5 11.5 13.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101692-3070
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK CAP: R1 (3)The torque control spring must does not have a set force. (4)Rack difference between N = N1 and N = N2 (5)Rack difference between N = N3 and N = N4
----------
K=10 R1=(17.5)mm N1=1250r/min N2=750r/min N3=1250r/min N4=400r/min
----------

Speed control lever angle

Test data 101692-3070
F:Full speed I:Idle S:Stop
----------

----------
a=13deg+-5deg b=28deg+-5deg c=32deg+-3deg

Timing setting

Test data 101692-3070
(1)Pump vertical direction (2)Position of key groove at No 1 cylinder's beginning of injection (3)Stamp aligning marks on the pump housing flange. (4)- (5)-
----------

----------
a=59deg36min+-3deg b=0deg24min+-30min




Information:

You must read and understand the warnings and instructions contained in the Safety section of this manual before performing any operation or maintenance procedures.Before proceeding with Every 1000 Hour maintenance, perform all previous maintenance interval requirements.Engine Protection Devices
Inspect for Proper Operation
Refer to the Service Manual for the procedure. All engine protective devices must be checked and maintained to provide the engine with proper protection if a component malfunction or failure should occur. Check all engine protective devices. Never use the Emergency Shutdown controls for a normal stopping procedure.SR4 Generator and Control Panel (If Equipped)
SR4 Generator
Before working inside the generator, make sure that the starting motor can not be activated by any automatic or manual signal.When the engine-generator is operating, voltages up to 600V are present in these areas near or on the regulator: 1. the regulator terminal strip2. the excitation transformer terminal strip (self-excited generator only)Do not short these terminals to ground with any part of the body or any conductive material. Loss of life or injury could result from electrical shock or injury from molten metal.
Electronic components in the regulator can be damaged during generator operation if contact is made between the part and ground.
Clean/Inspect Voltage Regulator
If moisture is allowed to remain in contact with an electrical winding, some of the moisture will eventually be absorbed. This will lower the resistance of the winding insulation. The insulation used on the windings of Caterpillar generators is moisture resistant, but constant exposure to moisture will gradually lower the insulation's resistance.Dirt can make the problem worse because it can hold the moisture in contact with the insulation. Salt (from coastal location sea air) can also make the problem much worse. This is because salt tends to absorb moisture from the air. When the salt and moisture combine, they make a good electrical conductor.* Clean the voltage regulator and generator of dirt and debris. Use a brush to loosen accumulations of dirt and a vacuum system for removal. Use of compressed air is not recommended, because of moisture present in the form of condensate.Carbon tracking on insulators can be caused by dirt or loose connections. These carbon paths must be cleaned or the insulators replaced. Failure to correct a carbon tracking problem will eventually result in a short in the electrical circuit.* Visually check for loose or broken wires and connections. Check the wires and connections on the regulator assembly. Check all wires and connections in the generator. Make any necessary repairs to the wiring as required.Visually inspect the generator and control panel. Check for loose, broken, or damaged wiring or components. The inspection only takes a few minutes and could avert a potential problem that could cause your generator set to fail.Operational Checks
Start the engine. Use the starting procedure found in the SR4 Generators and Control Panels Operation and Maintenance Manual, SEBU6150.The following operational checks include: * generator operation and engine starting* lubricating and fuel systems* overall operationThe checks should take no longer than five minutes to complete. A

Have questions with 101692-3070?





Group cross 101692-3070 ZEXEL

Komatsu 

9 400 616 021 
6206711320 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 610 307 
6206711240 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 616 022 
6206711210 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 616 023 
6206711220 
INJECTION-PUMP ASSEMBLY
6D95L
 
 
INJECTION-PUMP ASSEMBLY
6D95L
9 400 610 109 
 
INJECTION-PUMP ASSEMBLY
6D95L
 
6206711140 
INJECTION-PUMP ASSEMBLY
6D95L
101692-3070  
 
6207711310 
INJECTION-PUMP ASSEMBLY
S6D95L
 
 
INJECTION-PUMP ASSEMBLY
6D95L
 
 
INJECTION-PUMP ASSEMBLY
S6D95L
Back to top