101691-9810 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016919810 1671395103


 

Information injection-pump assembly

ZEXEL 101691-9810 1016919810
NISSAN-DIESEL 1671395103 1671395103
101691-9810 INJECTION-PUMP ASSEMBLY
Rating:
67
Buy INJECTION-PUMP ASSEMBLY 101691-9810 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101691-9810 1016919810
NISSAN-DIESEL 1671395103 1671395103


Zexel num
Bosch num
Firm num
Name
101691-9810 
 
1671395103  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
NE6T *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.7 3.65 3.75
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   13.7
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   109 107.4 110.6
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   9.8+-0.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   9 7.2 10.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(13.7)
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   109 108 110
Basic   *
Fixing the lever   *
Boost pressure kPa   30.7 30.7
Boost pressure mmHg   230 230
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.1
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   101.4 99.4 103.4
Fixing the lever   *
Boost pressure kPa   30.7 30.7
Boost pressure mmHg   230 230
Injection quantity adjustment_05
Adjusting point   C
Rack position   R2(12.6)
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   61.6 59.6 63.6
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   85 85 105
Fixing the lever   *
Rack limit   *
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   R3(12)
Boost pressure kPa   4 2.7 5.3
Boost pressure mmHg   30 20 40
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   R3+0.4
Boost pressure kPa   9.3 8 10.6
Boost pressure mmHg   70 60 80
Boost compensator adjustment_03
Pump speed r/min   600 600 600
Rack position   R1-0.6
Boost pressure kPa   17.3 17.3 17.3
Boost pressure mmHg   130 130 130
Timer adjustment
Pump speed r/min   920--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   870
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   2 1.5 2.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101691-9810
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT (3)Boost compensator stroke: BCL
----------
T1=B36 BCL=(1.1)+-0.1mm
----------

Speed control lever angle

Test data 101691-9810
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=26.5deg+-5deg b=43deg+-3deg

Stop lever angle

Test data 101691-9810
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=36mm
----------
a=20deg+-5deg b=40deg+-5deg

Timing setting

Test data 101691-9810
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(40deg)




Information:

You must read and understand the warnings and instructions contained in the Safety section of this manual before performing any operation or maintenance procedures.This maintenance is to be performed at the interval specified in the Maintenance Schedule for the engine being maintained.Before proceeding with 125 Service Hour maintenance, first perform previous maintenance requirements.Clutch (If Equipped)
Refer to the Instruction Plate on your clutch for the correct lubrication information.Lubricate Shift Collar Bearings
Instruction PlateLubricate the shift collar fittings with one or two grease gun shots each with MPGL or 2S3230 grease. Do not over grease.Lubricate Shift Lever Bearings
Refer to the Instruction Plate on the clutch for lubrication information.Some earlier clutches have pilot bearing fittings that need lubrication, whereas the later clutches have pilot bearings that are sealed for life.Lubricate the clutch shift lever bearings, pilot bearing and main shaft bearing (if equipped). Lubricate one fitting on top-rear of housing. Lubricate one fitting at the end of shaft. Refer to Instruction Plate on your clutch for correct lubrication information.Check/Adjust
If the clutch is damaged to the point of burst failure, expelled pieces can cause personal injury to anyone in the immediate area. Proper safeguards must be followed to prevent accidents.Do NOT operate the engine with Instruction Plate cover removed from the clutch. Personal injury may result.
While engaging the clutch to pick up the load, check the clutch adjustment. The clutch should engage with a firm push of the lever and a distinct snap. If the engagement is "soft" or slow, adjust the clutch.When clutch lever is disengaged, the hand lever must fall behind the vertical position. If the clutch slips, overheats, or operating lever disengages, clutch adjustment is necessary.1. Stop the engine and remove the clutch inspection cover.2. Rotate the clutch manually until the lock pin (engaged in the locking ring) is visible.3. Pull the lock pin out and rotate the locking ring clockwise (CW) until the lock pin slips or pops into the next notch. Turn adjusting ring CW to increase engagement torque and CCW to decrease engagement torque.4. Test the clutch adjustment. To test the clutch adjustment, engage clutch with a torque wrench to turn adjusting ring so that 296 to 393 N m (218 to 289 lb ft)torque or 636 90 N (143 20 lb) force at 541 mm (21.3 inches) length on lever is required to engage the clutch. If torque is still low, rotate the locking ring (CW) until lock pin slips into next notch. If the adjustment is too tight, turn the locking ring back (CCW) one to the previous notch.5. Install cover plate after adjustment is completed.

Have questions with 101691-9810?





Group cross 101691-9810 ZEXEL

Nissan-Diesel 

 
1671395102 
INJECTION-PUMP ASSEMBLY
NE6T
101691-9810  
 
1671395103 
INJECTION-PUMP ASSEMBLY
NE6T
 
1671395104 
INJECTION-PUMP ASSEMBLY
NE6T
 
1671395105 
INJECTION-PUMP ASSEMBLY
NE6T
 
 
INJECTION-PUMP ASSEMBLY
FE6T
 
 
INJECTION-PUMP ASSEMBLY
FE6T
 
16713Z5675 
INJECTION-PUMP ASSEMBLY
FE6T
 
16713Z5676 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY
FE6T
 
 
INJECTION-PUMP ASSEMBLY
FE6T
 
 
INJECTION-PUMP ASSEMBLY
FE6T
 
16800Z5501 
INJECTION-PUMP ASSEMBLY
FE6T
 
16800Z5502 
INJECTION-PUMP ASSEMBLY
FE6TA
 
16801Z5501 
INJECTION-PUMP ASSEMBLY
FE6T
 
16801Z5502 
INJECTION-PUMP ASSEMBLY
FE6TA
Back to top