101691-4200 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016914200 1156000611


 

Information injection-pump assembly

ZEXEL 101691-4200 1016914200
ISUZU 1156000611 1156000611
101691-4200 INJECTION-PUMP ASSEMBLY
Rating:
77
Buy INJECTION-PUMP ASSEMBLY 101691-4200 zexel genuine, new aftermarket engine parts with delivery

Service parts 101691-4200 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101069-3130
3. GOVERNOR 105470-0740
4. SUPPLY PUMP 105210-4251
5. AUTOM. ADVANCE MECHANIS 105612-0830
6. COUPLING PLATE 105662-0350
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-2010
11. Nozzle and Holder 9-15300-184-2
12. Open Pre:MPa(Kqf/cm2) 9.8{100}
13. NOZZLE-HOLDER 105031-2600
14. NOZZLE 105000-1130
15. NOZZLE SET

Include in #1:

101691-4200 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

ZEXEL 101691-4200 1016914200
ISUZU 1156000611 1156000611


Zexel num
Bosch num
Firm num
Name
101691-4200 
101691-4330 
 
1156000611  ISUZU
INJECTION-PUMP ASSEMBLY
DH100 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   2.2 2.15 2.25
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   13
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   103.5 101.2 105.8
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   13
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   115.5 112 119
Max. variation between cylinders %   0 -3 3
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   6.5+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   10.7 8.4 13
Max. variation between cylinders %   0 -13 13
Fixing the rack   *
Timer adjustment
Pump speed r/min   400+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   600
Advance angle deg.   0.6 0.1 1.1
Timer adjustment_03
Pump speed r/min   900
Advance angle deg.   1.4 0.9 1.9
Timer adjustment_04
Pump speed r/min   1150
Advance angle deg.   2 1.5 2.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101691-4200
N:Pump speed R:Rack position (mm) (1)Beginning of damper spring operation: DL (2)Set the load lever's stop position so that R = aa (N = 0). (3)RACK LIMIT: RAL
----------
DL=6-0.2mm aa=6mm RAL=13+0.2mm
----------

0000000901

Test data 101691-4200
F:Full load I:Idle S:Stop
----------

----------
a=4deg+-5deg b=6deg+-5deg c=46deg+-3deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=275r/min Ra=6.5mm
----------




Information:

START BY:a. remove valve coversb. remove fuel injection lines 1. Use tool (A) and a 5P328 crowfoot wrench (7/8") to loosen the fuel injection line nut at the nozzle end.
Do not let the tops of the fuel nozzles turn when the fuel lines are loosened. The nozzles will be damaged if the top of the nozzles turn in the body.
2. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (1). Install plugs in the fuel injection nozzles. 3. Remove the nut that holds the adapters to the cylinder head assembly. Remove fuel injection line adapters (2).Install Fuel Injection Line Adapters
1. Check the condition of O-ring seal (1) on fuel injection line adapter (2) for damage. Make a replacement if necessary.2. Lubricate O-ring seal (1) with clean engine oil. Install fuel injection line adapter (2). Tighten the retaining nut to a torque of 13.6 2.7 N m (10 2 lb.ft.). 3. Check the condition of the O-ring seal on inner fuel line (3) for damage, and make a replacement if necessary. Install inner fuel line (3).
Do not let the tops of the fuel nozzles turn when the fuel lines are tightened. The nozzles will be damaged if the top of the nozzles turn in the body.
4. Use tooling (A) to tighten the inner fuel line nuts to a torque of 40 7 N m (30 5 lb.ft.).END BY:a. install fuel injection linesb. install valve covers

Have questions with 101691-4200?





Group cross 101691-4200 ZEXEL

Isuzu 

101691-4200  

101691-4330 
 
1156000611 
INJECTION-PUMP ASSEMBLY
DH100
 
1156002481 
INJECTION-PUMP ASSEMBLY
DH100
 
1156000621 
INJECTION-PUMP ASSEMBLY
DH100
 
1156002491 

DH100
 
1156002312 
INJECTION-PUMP ASSEMBLY
DH100
 
1156000663 
INJECTION-PUMP ASSEMBLY
DH100
 
1156001161 

DH100
 
1156001372 

DH100
Back to top