Service parts 101685-0780 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
9-15300-184-2
12.
Open Pre:MPa(Kqf/cm2)
9.8{100}
15.
NOZZLE SET
Include in #1:
101685-0780
as INJECTION-PUMP ASSEMBLY
Cross reference number
ZEXEL
101685-0780
1016850780
ISUZU
9812009262
9812009262
Zexel num
Bosch num
Firm num
Name
101685-0780
9812009262 ISUZU
INJECTION-PUMP ASSEMBLY
DA640 * K
DA640 * K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
132424-0620
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-4-2-6-
3-5
Pre-stroke
mm
2.2
2.15
2.25
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-4 deg. 60 59.5 60.5
Cal 1-4 deg. 60 59.5 60.5
Difference between angles 2
Cyl.1-2 deg. 120 119.5 120.5
Cyl.1-2 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cal 1-3 deg. 240 239.5 240.5
Cal 1-3 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-5 deg. 300 299.5 300.5
Cal 1-5 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
13.5
Pump speed
r/min
750
750
750
Average injection quantity
mm3/st.
65
63.5
66.5
Max. variation between cylinders
%
0
-2
2
Basic
*
Fixing the rack
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
13
Pump speed
r/min
1200
1200
1200
Average injection quantity
mm3/st.
65.3
63.1
67.5
Max. variation between cylinders
%
0
-3
3
Fixing the lever
*
Injection quantity adjustment_03
Adjusting point
C
Rack position
11.5
Pump speed
r/min
750
750
750
Average injection quantity
mm3/st.
41
39
43
Max. variation between cylinders
%
0
-4
4
Fixing the rack
*
Injection quantity adjustment_04
Adjusting point
D
Rack position
9.8
Pump speed
r/min
225
225
225
Average injection quantity
mm3/st.
11
8.7
13.3
Max. variation between cylinders
%
0
-13
13
Fixing the rack
*
Test data Ex:
Governor adjustment
N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)At rack cap installation: R1
----------
K=8 R1=(17.5)mm
----------
----------
K=8 R1=(17.5)mm
----------
Speed control lever angle
F:Full speed
I:Idle
S:Stop
----------
----------
a=17deg+-5deg b=33.5deg+-5deg c=32deg+-3deg
----------
----------
a=17deg+-5deg b=33.5deg+-5deg c=32deg+-3deg
Information:
2. Remove bolts (1).3. Remove the water hose from the bottom of the water pump.4. Loosen the water hose clamps from water pipe (2).5. Remove two bolts (3) and remove the water pump and elbow as a unit.Install Water Pump
1. Inspect all O-rings, gaskets and hoses and install new parts if needed.2. Put the water pump and elbow in position and install the bolts.3. Install the water hose and tighten all water hose clamps.4. Fill the cooling system to the correct level.Disassemble Water Pump
start by:a) remove water pump1. Remove cover (3) and gasket from water pump (1).2. Remove elbow (2) and gasket from water pump (1). 3. Loosen bolt (5) .25 in. (6.35 mm). Hit (tap) the bolt with a soft hammer to remove impeller (4) from the shaft. 4. Remove spring and seal assembly (7) from shaft (6). 5. Turn the water pump over and remove bolt (8) and lockwasher.6. Remove O-ring seal (9) from the housing. 7. Use tooling (A) to remove gear (11) and bearing (10) from the water pump.8. Remove bearing (10) from gear (11). 9. Remove snap ring (12) with tool (B). 10. Remove bearing (14) and shaft (13) as a unit.11. Use tool (C) and a press to remove bearing (14) from the shaft. 12. Remove the ceramic ring and seal (15) from the housing. 13. Remove the lip type seal (16) from the housing with tooling (D).Assemble Water Pump
The seal must be installed with the lip toward the bearings.1. Install the lip type seal in housing (1) with tooling (A) to the bottom of the seal counterbore. Put a thin layer of engine oil on the lip of the seal. 2. Use a press to install shaft (2) in bearing (3). 3. Install the shaft and bearing (3) in housing (1). 4. Install snap ring (4) in the housing with tool (B). 5. Install bearing (5) on gear (6).
When gear (6) is installed, make sure the pins on the gear engage the holes in the shaft.
6. Put gear (6) and bearing in position on the shaft and install washer and bolt. 7. Install O-ring seal (7) on the housing.
Clean water only is permitted for use as a lubricant to make assembly easier. Do not damage or put hands on the wear surface of the carbon ring or the ceramic ring. Install the ceramic ring with the smoothest face of the ring toward the carbon seal assembly.
8. Put the ceramic ring (8) in position in the rubber seal. Use hand pressure and tool (which is with the replacement ring) to install the ceramic ring and rubber seal. 9. Remove the spring from the seal assembly (9). Use hand pressure and the tool (which is with the replacement ring) to install the seal assembly. Push seal assembly on the shaft until seal faces make light contact. 10. Install spring (10) on the seal assembly. 11. Put impeller (11) in position on the shaft. 12. Install washer and bolt (12). Tighten the bolt to
1. Inspect all O-rings, gaskets and hoses and install new parts if needed.2. Put the water pump and elbow in position and install the bolts.3. Install the water hose and tighten all water hose clamps.4. Fill the cooling system to the correct level.Disassemble Water Pump
start by:a) remove water pump1. Remove cover (3) and gasket from water pump (1).2. Remove elbow (2) and gasket from water pump (1). 3. Loosen bolt (5) .25 in. (6.35 mm). Hit (tap) the bolt with a soft hammer to remove impeller (4) from the shaft. 4. Remove spring and seal assembly (7) from shaft (6). 5. Turn the water pump over and remove bolt (8) and lockwasher.6. Remove O-ring seal (9) from the housing. 7. Use tooling (A) to remove gear (11) and bearing (10) from the water pump.8. Remove bearing (10) from gear (11). 9. Remove snap ring (12) with tool (B). 10. Remove bearing (14) and shaft (13) as a unit.11. Use tool (C) and a press to remove bearing (14) from the shaft. 12. Remove the ceramic ring and seal (15) from the housing. 13. Remove the lip type seal (16) from the housing with tooling (D).Assemble Water Pump
The seal must be installed with the lip toward the bearings.1. Install the lip type seal in housing (1) with tooling (A) to the bottom of the seal counterbore. Put a thin layer of engine oil on the lip of the seal. 2. Use a press to install shaft (2) in bearing (3). 3. Install the shaft and bearing (3) in housing (1). 4. Install snap ring (4) in the housing with tool (B). 5. Install bearing (5) on gear (6).
When gear (6) is installed, make sure the pins on the gear engage the holes in the shaft.
6. Put gear (6) and bearing in position on the shaft and install washer and bolt. 7. Install O-ring seal (7) on the housing.
Clean water only is permitted for use as a lubricant to make assembly easier. Do not damage or put hands on the wear surface of the carbon ring or the ceramic ring. Install the ceramic ring with the smoothest face of the ring toward the carbon seal assembly.
8. Put the ceramic ring (8) in position in the rubber seal. Use hand pressure and tool (which is with the replacement ring) to install the ceramic ring and rubber seal. 9. Remove the spring from the seal assembly (9). Use hand pressure and the tool (which is with the replacement ring) to install the seal assembly. Push seal assembly on the shaft until seal faces make light contact. 10. Install spring (10) on the seal assembly. 11. Put impeller (11) in position on the shaft. 12. Install washer and bolt (12). Tighten the bolt to
Have questions with 101685-0780?
Group cross 101685-0780 ZEXEL
Isuzu
101685-0780
9812009262
INJECTION-PUMP ASSEMBLY
DA640