101685-0450 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016850450 9812011522


 

Information injection-pump assembly

ZEXEL 101685-0450 1016850450
ISUZU 9812011522 9812011522
101685-0450 INJECTION-PUMP ASSEMBLY
Rating:
84
Buy INJECTION-PUMP ASSEMBLY 101685-0450 zexel genuine, new aftermarket engine parts with delivery

Service parts 101685-0450 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101068-3640
3. GOVERNOR 105411-0550
4. SUPPLY PUMP 105210-3241
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105661-3230
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-2010
11. Nozzle and Holder 9-15300-184-2
12. Open Pre:MPa(Kqf/cm2) 9.8{100}
13. NOZZLE-HOLDER 105031-2600
14. NOZZLE 105000-1130
15. NOZZLE SET

Include in #1:

101685-0450 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101685-0450 
 
9812011522  ISUZU
INJECTION-PUMP ASSEMBLY
DA640T * K




Information:

start by:a) remove oil pump1. Check the identification on the connecting rods and caps as to their location in the engine. The caps must be installed in original positions in the engine.2. Turn the crankshaft until two of the pistons are at bottom center. 3. Remove connecting rod caps (1) from the connecting rods. Remove the lower half of the bearings from the caps.
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
4. Push the connecting rod away from the crankshaft and remove the upper half of the bearings from the connecting rods.5. Make sure the surface of the connecting rod where the bearings make contact is clean and free of dirt.
Make sure the tabs on the bearings are in alignment with the notches in the connecting rods and caps.
6. Install the upper half of new bearings in the connecting rods.7. Pull the connecting rod down slowly on the crankshaft.
Make sure the surfaces where the bearings make contact in the caps are clean and free of dirt.
8. Install new bearings (2) in the caps. Make sure the tabs on the bearings are in alignment with the notches in the caps.9. Put clean engine oil on the threads of the bolts in the connecting rods.10. Check the bearing clearance with Plastigage (A) as follows: a) Make sure the numbers on the caps and connecting rods are the same and are on the same respective side. If new connecting rods are installed, put the cylinder number on the rods and caps.b) Put the caps and plastigage (A) in the correct position on the connecting rods. Install the nuts that hold them.c) Tighten the two nuts evenly to a torque of 60 6 lb.ft. (81.3 8.1 N m). Put a mark on each nut and tighten the nuts 120° more from the marks. d) Remove the caps from the connecting rods and Plastigage (A). Measure the thickness of the Plastigage. The connecting rod bearing clearance must be .0028 to .0066 in. (0.071 to 0.168 mm) for new bearings.e) Put clean engine oil in the bearing caps and install them again. Follow the tightening procedure in Step 10.f) Do Steps 1 through 10 for the other connecting rod bearings.end by:a) install oil pump

Have questions with 101685-0450?





Group cross 101685-0450 ZEXEL

Isuzu 

 
1156002991 

DA640
 
1156003281 

DA640
 
9812009482 
INJECTION-PUMP ASSEMBLY
DA640T
9 400 615 966 
9812009442 
INJECTION-PUMP ASSEMBLY
DA640T
 
9812009491 
INJECTION-PUMP ASSEMBLY
DA640T
101685-0450  
 
9812011522 
INJECTION-PUMP ASSEMBLY
DA640T
 
1156001951 

DA640T
 
9812011332 

DA640T
 
9812009502 
INJECTION-PUMP ASSEMBLY
DA640T
 
9812009871 

DA640
Back to top