101682-9360 ZEXEL 9 400 615 964 BOSCH INJECTION-PUMP ASSEMBLY 9400615964 1016829360


 

Information injection-pump assembly

BOSCH 9 400 615 964 9400615964
ZEXEL 101682-9360 1016829360
101682-9360 INJECTION-PUMP ASSEMBLY
Rating:
41
Buy INJECTION-PUMP ASSEMBLY 101682-9360 zexel genuine, new aftermarket engine parts with delivery

Service parts 101682-9360 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101068-9010
3. GOVERNOR 105410-4090
4. SUPPLY PUMP 105410-4090
5. AUTOM. ADVANCE MECHANIS 105642-0040
6. COUPLING PLATE 105210-3210
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 17.5
13. NOZZLE-HOLDER 105780-2080
14. NOZZLE 105780-0000
15. NOZZLE SET

Include in #1:

101682-9360 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

BOSCH 9 400 615 964 9400615964
ZEXEL 101682-9360 1016829360


Zexel num
Bosch num
Firm num
Name
101682-9360 
9 400 615 964 
  DAEWOO
INJECTION-PUMP ASSEMBLY
D0846 K 14BE INJECTION PUMP ASSY PE6A PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1120
Overflow valve opening pressure kPa   137 103 171
Overflow valve opening pressure kgf/cm2   1.4 1.05 1.75
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   1.5 1.45 1.55
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.8
Pump speed r/min   1250 1250 1250
Each cylinder's injection qty mm3/st.   69 67.5 70.5
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   7+-0.5
Pump speed r/min   250 250 250
Each cylinder's injection qty mm3/st.   16.5 13.5 19.5
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101682-9360
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Rack difference between N = N1 and N = N2
----------
K=(13) N1=1250r/min N2=700r/min
----------

Speed control lever angle

Test data 101682-9360
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=12deg+-5deg b=32deg+-3deg

Stop lever angle

Test data 101682-9360
N:Pump normal S:Stop the pump. (1)Normal
----------

----------
a=(25deg) b=(53deg)

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=285r/min Ra=7+-0.1mm
----------

Timing setting

Test data 101682-9360
(1)Pump vertical direction (2)Position of camshaft's key groove at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(130deg)




Information:

See FLYWHEEL RUNOUT for the correct method of flywheel inspection.(1) Maximum permissible temperature of the gear for installation on the flywheel (do not use a torch) ... 315°C (600°F)(2) Put 2P2506 Thread Lubricant on all bolt threads that hold flywheel to crankshaft and tighten to a torque of ... 270 25 N m (200 20 lb. ft.)(3) Diameter of bushing ... 69.723 0.013 mm (2.7450 .0005 in.) Bore in flywheel ... 69.875 0.013 mm (2.7510 .0005 in.)Maximum permissible temperature of the bushing for installation on torque converter hub ... 315°C (600°F) See Special Instruction, Form No. SMHS6942 for the complete procedure for installation of the 6N9829 Flywheel Adapter Group.6N1299 Flywheel Group for use with SAE No. 1 Flywheel Housing and Clark No. 14, 15 or 16 Twin Disc Torque Converter Without Clutch.
See FLYWHEEL RUNOUT for the correct method of flywheel inspection. Use the specifications for flywheels without BrakeSaver.(1) Put 2P2506 Thread Lubricant on all bolt threads that hold flywheel to crankshaft and tighten to a torque of ... 270 25 N m (200 20 lb. ft.)(2) Maximum permissible temperature of the gear for installation on the flywheel (do not use a torch) ... 315°C (600°F)9N2518 and 4W7370 Flywheel Group for use with SAE No. 1 Flywheel Housing and Clark C and CL8000 Series Torque Converter. Can not be used with BrakeSaver.
See FLYWHEEL RUNOUT for the correct method of flywheel inspection. Use Specifications for flywheels without BrakeSaver.(1) Maximum permissible temperature of the gear for installation on the flywheel (do not use a torch) ... 315°C (600°F)(2) Put 2P2506 Thread Lubricant on all bolt threads that hold flywheel to crankshaft and tighten to a torque of ... 270 25 N (200 20 lb. ft.)(3) Bore in bushing ... 52.007 0.013 mm (2.0475 .0005 in.)(4) Diameter of bushing ... 72.022 0.015 mm (2.8355 .0006 in.) Bore in flywheel ... 71.971 0.015 mm (2.8335 .0006 in.)

Have questions with 101682-9360?





Group cross 101682-9360 ZEXEL

Daewoo 

 
 
INJECTION-PUMP ASSEMBLY
D0846
 
 
INJECTION-PUMP ASSEMBLY
D0846
9 400 615 962 
 
INJECTION-PUMP ASSEMBLY
D0846
 
 
INJECTION-PUMP ASSEMBLY
D0846
9 400 615 963 
 
INJECTION-PUMP ASSEMBLY
D0846
 
 
INJECTION-PUMP ASSEMBLY
D0846

Daewoo 

101682-9360  
9 400 615 964 
 
INJECTION-PUMP ASSEMBLY
D0846
 
 
INJECTION-PUMP ASSEMBLY
D0846
 
 
INJECTION-PUMP ASSEMBLY
D0846
9 400 610 164 
 
INJECTION-PUMP ASSEMBLY
D0846
Back to top